Report from ILCSC Shin-ichi Kurokawa ILCSC Chair KEK February 4, 2004 ACFA LC Workshop and GDE Meeting IHEP, Beijing, China.

Slides:



Advertisements
Similar presentations
ILCSC Report KILC12 / Daegu Jonathan Bagger Chair, ILCSC Johns Hopkins University 4/23/12.
Advertisements

Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
GDE Meeting B Barish 16-Aug-05 The GDE – who, what and how? The BCD – what is it? Internal Organization toward BCD What do we want out of Snowmass? How.
Status of International Linear Collider Global Design Effort Barry Barish (by telecon) HEPAP Washington DC 18-May-05.
D. Peterson, “WWS R&D Panel Project Registry”, ALCPG, Snowmass, 20-August World Wide Study Detector R&D Panel Project Registry Web Site web site:
ILCSC and WWS News David J. Miller: ILCSC news for MDI workshop, 6 January ILCSC Membership Recent ILCSC meetings Worldwide Study Plans.
Review of last year: Global Design Effort Barry Barish ILC Consultations URA, Washington DC 12-May-05.
ECFA LCWS 26 May 2013 DESY Sachio Komamiya The University of Tokyo 1 26 May 2013 DESY Hamburg Linear Collider Board (LCB) Report.
Asian View Point as ACFA Chair and Global View Point as New ILCSC Chair Shin-ichi Kurokawa KEK 2 nd ILC Workshop August 23, 2005 Snowmass, Colorado Shin-ichi.
Concluding Remarks Dongchul Son Center for High Energy Physics Kyungpook National University.
ECFA European Committee for Future Accelerators ECFA ACTIVITIES Lenny Rivkin, EPFL & PSI CHIPP Plenary meeting Fribourg, 30 June – 2 July, 2014.
Report from ILCSC Shin-ichi Kurokawa KEK ICFA Seminar Daegu, Korea September 29, 2005.
ICFA Report to KILC12 January 2011 to April 2012 Pier Oddone – ICFA Chair Pier Oddone; 23 April 2012ICFA Report to KILC121.
Organizing the Linear Collider. Steps toward the ILC 1989 – 1996: Operation of the world’s only linear collider, the 90 GeV SLC at Stanford Linear Accelerator.
Opening Remarks: ICFA and Governments Presented at Special Evening Forum By Jonathan Dorfan.
Message from ACFA Chair C.Zhang IHEP CCAST ILC Accelerator Workshop and First Asian ILC R&D Seminar under JSPS Core University November 5, 2007.
Albrecht Wagner, Report from ICFA, ICHEP 2006 Report from ICFA 1.ICFA mission and membership 2.ICFA Panels 3.ICFA Activities 4.ILCSC and its mandate 5.Funding.
J. Mnich for Pier Oddone | ICFA Report to Lepton Photon 2013 June 28, 2013 | Page 1 ICFA Report to Lepton Photon 2013 J. Mnich (for Pier Oddone, ICFA chair)
Charge to the Workshop (and a report from WWS) Hitoshi Yamamoto July 11, 2005 ACFA8, Daegu, Korea.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
Albrecht Wagner, Report from ICFA, LP 2007 Report from ICFA 1.ICFA mission and membership 2.ICFA Panels 3.ICFA and the ILC 4.Other activities of ICFA Albrecht.
Status of Linear Collider Activities Rika Takahashi on behalf of the LC Communicators 104 November, 2013 Interactions US.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
1 1 LCC Physics and Detector Hitoshi Yamamoto ECFA LC2013, DESY May 27, 2013.
W. Namkung, 3 nd ILC Workshop, April 1, ILCSC Update 3rd ILC-Korea Workshop April 1, 2005 Kunkook University Seoul, Korea Won Namkung PAL/POSTECH,
30-May-07 LCWS DESY Meeting Global Design Effort 1 A Vision of the Future RDR to ILC Barry Barish LCWS DESY 30-May-07.
WWSWWS Next steps for Detectors by F. Richard LAL/Orsay TILC08 TILC08 Joint ACFA Physics and Detector Workshop and GDE meeting on ILC, 3-6 March 2008,
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
Albrecht Wagner, ICFA and the ILC, Valencia 2006 Outlook 1.The role of ICFA for the ILC – past and future 2.Status and Outlook Albrecht Wagner, Chair ICFA.
Understanding Matter, Energy, Space and Time: The Case for the e  e  Linear Collider  Document produced at the instigation of the World Wide Study of.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
Report from ILCSC Shin-ichi Kurokawa Former ILCSC Chair KEK November 4, 2007 CCAST ILC Workshop IHEP, Beijing, China.
World Wide Study of Physics and Detectors for a future e + e - Linear Collider David J. Miller; towards a WWS response to ILCSC/ICFA How do we propose.
Brian Foster - Cosener's Forum May 06 1 The ILC - Status & Plans Introduction & latest developments The GDE The baseline design and R&D efforts The path.
THE INTERNATIONAL COMMITTEE FOR FUTURE ACCELERATORS (ICFA) Roy Rubinstein2nd International Conference on New Frontiers in Physics - 4 September
Report from ILCSC Shin-ichi Kurokawa ILCSC Chair LCWS06 at IISc Bangalore March 9, 2006.
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
Report from ILCSC Shin-ichi Kurokawa ILCSC Chair ILC-Asia meeting at PAL February 17, 2006.
Some Words from the New ILCSC Chair Shin-ichi Kurokawa KEK 8 th ACFA LC Workshop July 12, 2005 Daegu, Korea.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
FALC Was “Funding agencies for linear collider” Now “funding agencies for large colliders” WHY ??
Office of Science U.S. Department of Energy 1 ILC R&D Program Dr. David Sutter, Senior Program Manager Office of High Energy Physics Office of Science.
WWSWWS The WWS Roadmap for ILC Detectors by F. Richard LAL/Orsay.
1 GUTs and Branes DESY Theory Workshop 2003 A brief introduction to the future of particle physics at DESY Albrecht Wagner Hamburg, 23 September 2003.
WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
1J. Brau - ILCSC Meeting - Beijing - August 19, 2004 Organizing the Global Experimental Program The ILCSC has asked the Worldwide Study, as its Physics.
9/17/041 The International Linear Collider Michael Witherell Presentation to The Funding Agencies for a Linear Collider September 17, 2004.
Atsuto Suzuki (KEK), Chair ICFA Report from ICFA ICFA mission and membershipICFA PanelICFA Activity.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Welcome Address Shin-ichi Kurokawa KEK ILCSC Chair International Accelerator School for Linear Colliders Hayama, Japan May 20, 2006.
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
Americas comments on Linear Collider organization after 2012 P. Grannis, for LCSGA – Aug. 24, 2011 ILCSC GDE.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
ICFA Report to New Frontiers in Physics January 2011 to April 2012 Pier Oddone – ICFA Chair Pier Oddone; June 15, 2012New Frontiers in Physics1.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
ICFA Report to C11 August 2016 to August 2017 J. Mnich (DESY)
ICFA Report to ICHEP 2016 August 2015 to August 2016 J. Mnich (DESY)
Report from ICFA ICFA mission and membership ICFA Panels ICFA and ILC
Yasuhiro Okada, Executive Director, KEK
ICFA Report to FALC February 2016 to August 2016 J. Mnich (DESY)
Presentation transcript:

Report from ILCSC Shin-ichi Kurokawa ILCSC Chair KEK February 4, 2004 ACFA LC Workshop and GDE Meeting IHEP, Beijing, China

ILC Organization Chart ICFA ILCSC GDE Asia Regional Team European Regional Team American Regional Team ACFA ALCSCFALC

ICFA and the Linear Collider ICFA has been helping to guide international cooperation on and try to realize the Linear Collider more than 10 years. Major steps: 1995: First LC TRC Report, under Greg Loew as Chair 1999: ICFA Statement on Linear Collider 2002: ICFA commissioned the second LC TRC Report, under Greg Loew as Chair 2002: ICFA has established the ILC Steering Committee (ILCSC) with Maury Tigner as the 1 st Chair 2004 ILCSC set up ITRP and ICFA/ILCSC have approve ITRP recommendation 2005 ICFA/ILCSC has established GDE

Directors CERNRobert Aymar DESYAlbrecht Wagner FermilabPier Oddone KEKAtsuto Suzuki SLACJonathan Dorfan LC Steering Group Chairs AsianWon Namkung European Karlheinz Meier AmericanSatoshi Ozaki Other Chair(2 nd )Shin-ichi Kurokawa China (IHEP Director) Hesheng Chen Russia (BINP Director) Alexander Skrinsky ICFA outside LC regionsVinod Sahni Asia Rep. Sachio Komamiya Europe Rep. Francois Richard American Rep. Jim Brau SecretaryRoy Rubinstein Membership of the ILCSC(Present)

ILCSC Charter(2002) Engage in outreach, explaining the intrinsic scientific and technological importance of the project to the scientific community at large, to industry, to government officials and politicians and to the general public Based upon the extensive work already done in the three regions, engage in defining the scientific roadmap, the scope and primary parameters for machine and detector. It is particularly important that the initial energy, the initial operations scenario and the goals for upgradeability be properly assessed. -> Parameter Committee(Chaired by Rolf Heuer)

Parameters for the ILC (2003) E cm adjustable from 200 – 500 GeV Luminosity   Ldt = 500 fb -1 in 4 years Ability to scan between 200 and 500 GeV Energy stability and precision below 0.1% Electron polarization of at least 80% The machine must be upgradeable to 1 TeV

ILCSC Charter (cont) Monitor the machine R&D activities and make recommendations on the coordination and sharing of R&D tasks as appropriate. Although the accelerator technology choice may well be determined by the host country, the ILCSC should help facilitate this choice to the largest degree possible. > ITRP (International Technology Recommendation Panel) Identify models of the organizational structure, based on international partnerships, adequate for constructing the LC facility. In addition, the ILCSC should make recommendations regarding the role of the host country in the construction and operation of the facility.

ITRP Recommendation endorsed by ICFA in August 2004 ICFA has decided on superconducting technology for the future linear collider (LC), by endorsing the resolution of the ITRP. The ITRP report emphasizes the importance of world-wide unified approach as a single team to design the international linear collider (ILC ). -> ILCSC has established GDE

Global project named International Linear Collider (ILC)

Global Design Effort (GDE) ILCSC set up a committee with Paul Grannis as Chair to select a Director for the GDE. February 2005, at TRIUMF, ILCSC and ICFA unanimously endorsed the Committee’s choice. On March 18, 2005 Barry Barish officially accepted the position at the opening of LCWS 05 meeting at Stanford.

Global Design Effort The Mission of the GDE Produce a design for the ILC that includes a detailed design concept, performance assessments, reliable international costing, an industrialization plan, siting analysis, as well as detector concepts and scope. Coordinate worldwide prioritized proposal driven R & D efforts (to demonstrate and improve the performance, reduce the costs, attain the required reliability, etc.)

ILC DGE ILC-MOU : Signed on May 10, 2005

Comment on ILC MoU GDE activities are done on the basis of this ILC MoU In addition to 11 signers, Center for High Energy Physics (CHEP), Kyungpook University of Korea and IN2P3 of France have signed the ILC MoU recently This ILC MoU is valid until May 2008 and it shall be reviewed at the time of transition from RDR to TDR

The GDE Plan and Schedule Global Design EffortProject Baseline configuration Reference Design ILC R&D Program Technical Design Expression of Interest to Host International Mgmt LHC Physics CLIC From Barry

ILCSC has setup MAC as its sub-panel March As one of the ILCSC oversight activities of GDE, MAC (Machine Advisory Committee) has been formed in March MAC reviews the GDE activities with respect to accelerators and report to ILCSC, and, at the same time, give advice to GDE director. 3. MAC reviews BCD as soon as the document is released, and then 、 review the activities of GDE at appropriate time until RDR is finalized. 4. MAC meets a few times a year during this period. 5. Number of MAC members is 10-12, and members shall be selected mostly on the basis of their expertise and not on the basis of regional balance.

NameAffiliationExpertise, etc Ferdinad WillekeDESYChair Norbert HoltkampORNLlinac, RF, LC, Project Katsunobu OideKEKe-ring, Accelerator Physics, Project John SeemanSLACe-ring, Accelerator Physics, Project, MDI Don HartillCornellProject (added in December) Dave McGinnisFNALRF, accelerator physics, project Claus RhodeTJLcryogenics Lenny RivkinPSIlow emittance ring, accelerator physics Takaaki FuruyaKEKSCRF In-Soo KoPALlinac, accelerator physics, project Bernd LoehrDESYlong term technical coordinator of ZEUS Burt RichterSLACproject, Accelerator physics Gunter GeschonkeCERNRF, SCRF Yuri ShatunovBINPaccelerator physics, project Shin-ichi KurokawaKEKChair of ILCSC, ex-officio Maskazu YoshiokaKEK lProject (added in December 2006) Roy RubinsteinFNALSecretary ILC MAC members

MAC meetings 1 st : April 6-7, 2006, at FNAL 2 nd : September 20-22, 2006, at KEK 3 rd : January 10-12, 2007, at Daresbury, 4 th : April 26-27, 2007, in FNAL

Mandate of the MAC in Daresbusry (January 10-12) # Review the soundness of the overall RDR concept, identify any areas of concern, note what R&D is still needed, and comment on whether the performance parameters can be met. # Review the cost methodology and identify any areas of concern.

MAC report The committee would like to acknowledge that a large amount of work has been accomplished since its last meeting. The MAC applauds that considerable evolution of the design was achieved which was made possible by strong leadership and guidance by the GDE. Together these have resulted in a successful reduction of the total project cost as compared to the status of summer The numerous design changes that provide considerable cost reductions as compared to the baseline configuration are clear evidence that the performance driven baseline configuration was successfully converted into a cost conscious design. It is also remarkable that the difficult process of implementing these significant changes has not slowed down the momentum of the design effort but rather has strengthened the design team’s focus. The committee would like to congratulate the GDE and the local teams in the laboratories for this achievement. It goes beyond what had been considered achievable under the given circumstances in a short amount of time.

Recent and Future ILCSC meetings July 30, 2006, in Moscow November 11, 20006, in Valencia January 12, 2007 (afternoon), in Daresbury (after MAC on January 10-12). First RDR cost disclosure to ILCSC. February 8, 2007, in Beijing June 1, 2007, in DESY

Revised Mandate of ILCSC (August 2006) The ILCSC, as a Sub-panel of ICFA, is established in order to facilitate a global support towards the realization of the International Linear Collider as a global collaborative effort, drawing on input from regional steering committees. The ILCSC has established the Global Design Effort (GDE) Central Team to coordinate and direct the effort of the teams in Asia, Europe and the Americas that comprise the GDE. The ILCSC, representing ICFA, will provide oversight to the GDE. The ILCSC will monitor the progress of the GDE activities, including through reports by the GDE Director and the assessment of technical progress through reports by the MAC Chairperson.

Revised Mandate of ILCSC (wrt FALC) The ILCSC will work closely with the Funding Agencies for the Linear Collider (FALC) and/or other national or international agencies to facilitate the evolution of GDE to an institution under international governance aimed at the construction of the ILC. The ILCSC will assess and endorse budget requests for the common operations fund of the Central Team that the GDE Director will put forward to Funding Agencies for the Linear Collider (FALC) for approval. Comment: FALC has changed its name from Funding Agencies for Linear Colliders to Funding Agencies for Large Colliders in May 2006 FALC is now trying to write Terms of Reference

Modified Mandate of ILCSC (wrt WWS) The Worldwide Study (WWS) will report regularly to the ILCSC and advise it on ILC physics and detector issues, while maintaining close contact with the GDE on the development of detector concepts and detector R&D The ILCSC will monitor the progress of the detector and machine detector interface development, including through reports by the co-chairpersons of the WWS and the Machine Detector Interface Committee (MDI).

ILCSC School ILC School May 06 SOKENDAI ILC School was a great success. ILCSC has approved to prepare to hold the 2 nd ILC School in Erice in fall of 2007.

Parameter Committee Reactivated ILC Parameters In order to obtain a better understanding of the relation between cost and performance, it was felt useful to ask the Parameters Subcommittee (chaired by Rolf Heuer) to re-examine its 2003 report. ILCSC decided to reactivate the Parameters Subcommittee (in July) Parameter Committee Report Rolf Heuer reported semi-final version of the report to ILCSC (in November) The final version will be reported at Beijing ILCSC meeting.

Discussion on RDR to TDR(EDR) A first discussion concerning the next steps took place at Valencia and ILCSC and ILCSC has decided its action. It was agreed that ILCSC would ask GDE to give its input to ILCSC at the occasion of ILCSC meeting in Beijing in February Discussion will be continued further after Beijing meeting.

Action by ILCSC agreed upon As an oversight body of GDE, ILCSC should evaluate the RDR (on the basis of report given by GDE, the MAC report, and information given by WWS). This evaluation process will need a few months after the RDR report is issued. The Machine Advisory Committee (MAC) should evaluate the RDR from technical view point and report to ILCSC.

Action by ILCSC(cont) ILCSC will ask the GDE to provide a proposal and schedule how to move forward from the RDR to the TDR(EDR), including the design of accelerators, cost estimate, organizational structure, world-wide cooperation, coordination of world-wide R&D activities, and relation with the physics community. ILCSC will then evaluate the proposal given by the GDE.

Action by ILCSC(cont) Based on this evaluation, ILCSC will recommend to ICFA on how to move from RDR to TDR phase and report to FALC. The proposal should include: a) Definition of the scope of the TDR(EDR) and the action necessary to reach this scope b) Organizational structure c) Legal framework (e.g. MoU) for the RDR to TDR(EDR) phase Two important issues: 1) how to establish scheme for global-coordinated R&D for ILC (real work); 2) how to make GDE on much solid footing.

Agenda of Beijing ILCSC meeting February 8, 2007 Joint ICFA/ILCSC meeting in the morning of Feb. 8 to discuss the RDR and its cost estimate. Press release is planned to be held around noon time. ILCSC will continue its discussion in the afternoon (MAC Report; GDE Response to MAC Report; Parameters Subcommittee Report; WWS; RDR to TDR (continued); Regional Reports, Nomination of International Cost Review members.

International Cost Review Agreed upon by ILCSC and FLAC It was agreed that a single international cost review of the RDR should take place. The ILCSC could be invited to organize this review. ILCSC will nominate 2 members per region and add a few members if it thinks appropriate, taking into account expertise of members. In addition to it two members per region will be selected by FALC. This review should focus on cost trends and relative costs of sub- systems as they relate to potential scope changes to be incorporated in the TDR, their relevance to the R&D program needed to complete the TDR, and the methodology used in the estimate. FALC has nominated candidates; ILCSC will start nomination in Beijing Meeting. This review will be held in this spring..

Thank you for your Attention !