1 Office Space Requirements 2 Universal Axioms Manufacturing managers in large companies tend to overestimate their individual cell or departmental space.

Slides:



Advertisements
Similar presentations
Lean Manufacturing.
Advertisements

Chapter 15 - Material & Capacity Requirements Planning(MRP/CRP)
TOPIC :CAPACITY AND FACILITIES
Logistics Network Configuration
Process Selection and Facility Layout
Inventory Management. Inventory Objective:  Meet customer demand and be cost- effective.
Inventory Control, Cost & Deterministic models Unit-III Revised version.
Production Planning Devaki Nadkarni Production Planning Annual demand by item and by region Monthly demand for 15 months by product type Monthly demand.
Operations Management Just-in-Time Systems Supplement 12
Just-In-Time “Eliminate Waste”.
1 Facility Layout. 2 What Is Layout Planning Layout planning is determining the best physical arrangement of resources within a facility Two broad categories.
PRODUCTION PLANNING ELİF ERSOY Production Planning2 WHAT IS PRODUCTION PLANNING?  Production planning is a process used by manufacturing.
Operations Management
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
Inventory Management for Independent Demand
Management Accounting for Business
Operations Management BA 301 – Spring 2003 Just-in-Time Systems Supplement 12.
Operations Management
Operations Planning Horizons
Supply Chain Drivers and Metrics
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
Starter Kit. Starter kit Production : Cut operations receiving ECN (Eng. Change Notice) Auto copy to prod orders details Shop floor reporting Generic.
ISQA 459 Mellie Pullman 1.  JIT can be defined as an integrated set of activities designed to achieve high-volume production using minimal inventories.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. JIT and Lean Operations.
1 DSCI 3123 Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives.
University of Southern California Enterprise Wide Information Systems Manufacturing Planning and Execution (cont.) Instructor: Richard W. Vawter.
Just-In-Time & Lean Systems
Collaboration among sales, production, planning, purchasing, maintenance and management to positively impact the bottom line.
Inventory/Purchasing Questions
Just-in-Time and Lean Systems
© Wiley 2007 Chapter 10 Facility Layout. © Wiley 2007 OUTLINE What Is Layout Planning? Types of Layouts Designing Process Layouts Special Cases of Process.
Supply Chain Management
MATERI XI PRODUKSI & OPERASIONAL. 5 ISSUES That arise when trying to produce a product or service Capacity (How much can I produce) Scheduling (How am.
Mohamed Iqbal P Production and Inventory Control- Introduction (1) IEM Production and Inventory Control Introduction Mohamed Iqbal P.
Module 14 Cost Behavior, Activity Analysis, and Cost Estimation.
Chapter 20 Managing inventory and quality. The importance of inventory management §Cope with uncertainties in customer demand and in production processes.
1 Lean Office - Pull Kanban, Just in Time, Standardized Work
Business Policy & Strategy: Chapter Nine Production Murdick, Moor, Babson & Tomlinson Sixth Edition, 2000.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Real-time management of inventory for items Inventory Concept LOGISTIC & WAREHOUSING.
Manufacturing Plant maintenance Materials management Quality management.
CONWIP (A pull alternative to kanban principle)
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Lean Supply Chains Chapter 12.
Chapter 4 Inventory Management. INVENTORY MANAGEMENT Stockpile of the product, a firm is offering for sale and the components that make up the product.
Click to edit Master title style Planning and Designing a Lean Manufacturing Facility.
JIT and Lean Operations Characteristics of Lean Systems: Just-in-Time  Pull method of materials flow  Consistently high quality  Small lot sizes  Uniform.
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Aim - Customer satisfaction at optimum cost. PRODUCTION MANAGMENT.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 8 Facility Layout.
FACILITY LAYOUT & LOCATION PROF. DR. ORHAN TORKUL M. RAŞİT CESUR.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
CHAPTER 9 Lean Manufacturing.
Chapter 12 Lean Production. Chapter 12 Lean Production.
Auxiliary Services Requirement Space
IENG 451 / 452 Just In Time Processes: Cells, Stores, Kanban, Demand
Chapter 27 Cost Management for Just-in-Time Environments
Chapter 3 Supply Chain Drivers and Obstacles
Process Layout Chapter #6.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Inputs and Outputs to Aggregate Production Planning
Chapter 4 Inventory Management.
Course Summary Organization: A process providing goods and services based on a set of inputs, including raw material, capital, labor and knowledge. The.
Purposes of Inventory Meet expected demand Absorb demand fluctuations
Chapter 3 Supply Chain Drivers and Obstacles
Purposes of Inventory Meet expected demand Absorb demand fluctuations
Chapter 3 Supply Chain Drivers and Metrics
Chapter 3 Supply Chain Drivers and Obstacles
Presentation transcript:

1 Office Space Requirements

2 Universal Axioms Manufacturing managers in large companies tend to overestimate their individual cell or departmental space needs Manufacturing space is like a closet, clutter will continue to collect until it fills the space provided

3 General Considerations No magic formulas to follow Experienced managers will overstate their requirements Inexperienced managers will understate their requirements Main aisles in a light manufacturing plant will account for approximately 10% - 18% of total under roof floor space

4 The Big Three Budget Limitations 1. Cost Limitations 2. Schedule Limitations 3. Human Resources Limitations

5 Gross Business Ratios Space versus sales ratios Revenue ratio Plant ratios or ratio ranges Estimate data for large companies Use public domain information Office area is fairly consistent Manufacturing size varies by type (cellular, assembly line, etc.)

6 Space-Related Ratios Total Production Space Number of Production Workers Space-related Ratio = Useful for existing plant expansion... Take note of the current working conditions: Congested = “worst” case scenario Functional = “optimal” scenario Baseline the expansion on these numbers

7 Space-Related Ratio Example A local manufacturer has determined the following: Space is considered “tight” They have 50 employees They currently occupy a 5,000 sq. ft. facility Expected 5 year growth = 75 employees What do we know? Employee / Space Ratio = 5,000 / 50 = 100 sq. ft / employee Anticipated facility size in 5 years= 75 X 100 sq. ft. = 7,500 sq. ft.

8 Ratio Caution forecast A ratio is like a forecast... it’s only an estimate of the future Review the past sales / production history Review the economic conditions during the growth periods Use the ratios as a guide

9 Space Balance Analysis Most often used classifications: Primary operations Secondary operations Inspection and test areas Storage areas Raw materials WIP Finished goods

10 Space Balance Analysis Service and support Maintenance Tool cribs Shipping / Receiving dock areas Offices Aisles

11 Space Utilization 7% 8% 12% 17% 19% 20% Service / Support Molding Offices Light Assy Aisles Shipping / Receiving Warehouse

12 Site Saturation Planning Completely utilized configuration No room for building additions No room for expansion Framework for master facility plan Estimates are derived for maximum facility layout Used to determine maximum production output on existing site

13 Site Saturation Planning Completely utilized configuration No room for building additions No room for expansion Framework for master facility plan Estimates are derived for maximum facility layout Used to determine maximum production output on existing site

14 Site Saturation Planning Neglecting site saturation planning can result in long-term consequences costing the organization significant capital

15 Equipment Utilization Consideration Equipment utilization impacts layout space Don’t plan on 100% equipment utilization levels Take PFD into consideration Rely on historical data including utilization and maintenance

16 Equipment Utilization Consideration Example: Equipment currently runs at 65%, producing 500 pcs./day OEM states production runs of 769 pcs./day Growth projections require 1,300 pcs./day Management expects 85% utilization through improvements How many machines are required to meet production growth? (500 pcs./day X 85%) / 65% = 653 pcs./day 1,300 / 653 = 2 machines required [negligible OT projected]

17 Adjusting Today’s Needs Also known as conversion or converting Tally all currently used space Calculate the space for aisles Interview and observe the workers Collect data from the workers Confirm and correct estimates Base projections on the data

18 Adjusting Today’s Needs – From the Trenches Space required for increasing capacity or production levels in not linear The Conversion methodology uses a subjective or approximate approach Evaluate each situation carefully Used for basic level planning

19 Equipment Utilization Consideration Example: A walk-through of the existing 1,225 sq. ft. department (operating 24 / maximum capacity) indicates congestion. This area could use an increase of 5% - 10% of space. Develop a baseline SWAG of future space allotment if the area doubles in capacity through increased demand. Using the Conversion method: (1,225 sq. ft. X 108%) X 2 = 2,646 sq. ft. estimated Average = 8% Double capacity

20 Determining Space Needs Known as a Rough Layout or Production Center method Detail each piece of equipment Indicate door swings Special access areas Approximate equipment spacing Utility requirements (water, air, power, etc.)

21 Elements of a Push System Production Schedule Assembly Schedule Processing Schedule Procurement Schedule Suppliers Materials Warehouse Product Warehouse FabricationAssembly Work Orders Work Orders In-Process Inventory In-Process Inventory Material Orders  Trigger or process driver  Information flow and material flow  Inventory management  Work order control vs. visual control  Integration of suppliers

22 Elements of a Pull System Suppliers FabricationAssembly Product Warehouse Customer Demand Point of use Storage In-Process Inventory Assembly Usage Fabrication Usage  Trigger or process driver  Information flow and material flow  Inventory management  Work order control vs. visual control  Integration of suppliers

23 Pull Production System In a Pull System, coordinating the production and movement of parts and components between processes is critical in avoiding over production or shortages. To achieve this coordination, you can use a system called “Kanban.” Kanban is a mechanism for managing a pull production system.

24 Kanban Kanbans have been in use in the US prior to the mid-1960s One of the most widely used systems before MRP and MRP-II Requires maintaining minimal inventory levels Kanban starts at the end... Shipping

25 Kanban Kanban is also known as “pull” manufacturing Kanban loosely translated to “card” Kanban is a simple visual scheduling and replenishment approach Kanban signals can be cards, containers, lights, “Poker Chips”, etc.

26 Pull Signal Calculation Production Kanban An example of a simple pull signal (Kanban) calculation where a constant quantity of product is withdrawn at varying intervals: K= D r * T r * (1+F m ) UkUk Where: K = Number of Kanban (number of signals) And: D r = Demand Rate T r = Replenishment Lead Time (for feeder) U k = Units per Kanban (per signal) F m = Management Factor (safety factor)

27 Pull Signal Calculation Supplier Kanban An example of a simple pull signal (Kanban) calculation where a variable quantity of product is provided at constant intervals: K= D r * (2 + T d ) * (1+F m ) (U k * D d) Where: K = Number of Kanban (number of signals) And: D r = Demand Rate T d = Transit Delay (for supplier) U k = Units per Kanban (container capacity) D d = Deliveries per Day F m = Management Factor (safety factor)

28 Inventory Convert inventory to physical space terms Inventory holding costs have a significant impact on the bottom line of a company Increased production does not directly reflect increased inventory Reduce inventory where possible

29 Inventory Customer Order Lead Time On-Time Delivery Current Capability Do we have to make trade-offs?

30 Space Need Pitfalls Ratios and projections are approximations Many companies guess at space needs Forecasting errors Overestimating space requirements Poor understanding of the manufacturing process

31 Questions & Comments