Results of Group Discussion. Discussion Points Shipperless and Unregistered Sites have been partly There are a number of Shipperless and Unregistered.

Slides:



Advertisements
Similar presentations
Solar PV On-Site Guide Solar PV On-Site Installers Guide.
Advertisements

Background Presenters Work done in preparation for WHS changes
Shipperless & Unregistered Workgroup Wednesday 29 th January 2014.
Shipperless & Unregistered Workgroup Tuesday 6 th May 2014.
1 Industry Shipperless &Unregistered Working Group Thursday 4 th March 10.30am at xoserve.
Industry Shipperless & Unregistered Working Group Wednesday 18 th April 2012.
SGN S&U Update Lisa Warnock 1 st November Agenda Data cleansing (set to dead/extinct) Shipper interaction SGN root cause measures.
Energy Networks Association Root cause solution for unregistered sites / MPRN creation David Mitchell 1 st November 2013.
1 Modification 422 Creating the permission to release data to Meter Asset Provider organisations A presentation by the Community of Meter Asset Providers.
Shipperless & Unregistered Workgroup Friday 1 st November 2013.
MPRN Creation Workgroup Tuesday 27 th March 2012.
Shipperless & Unregistered site working group Recommendations to Process Backlog Shipper Activity Monthly report No interest - orphaned Widened identity.
Industry Shipperless & Unregistered Working Group Wednesday 1 st February 2012.
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
1 Industry Shipperless & Unregistered Working Group Wednesday 3rd November 10.00am at xoserve.
Shipperless & Unregistered Workgroup Friday 15 th March 2013.
DN Emergency Procedures – Theft of Gas Simon Trivella –15 th June 2009 Review Group 0245 – Theft of Gas arrangements.
1 Industry Shipperless &Unregistered Working Group Wednesday 5 th May 10.30am at xoserve.
Course # Unit 6 - Various Required Reporting.
Shipperless & Unregistered Workgroup Monday 1 st July 2013.
Nexus Workgroup CSEP Transition Topic June
Proposed Agreement For Identification And Administration Of Unregistered Sites Chris Warner Network Code Manager.
Shipperless & Unregistered site working group Recommendations to address the Unregistered Sites Collectively establish & execute activities to correct.
IGT Single Service Provision Requirements Update – 27 th March 2013.
Generic & Enduring Functionality to Allow Xoserve to Confirm a Supply Point into a Shipper’s Portfolio UK Link Committee – April 2013.
Shipperless & Unregistered Workgroup Wednesday 17 th September 2014.
PN UNC Workgroup iGT Services 7 th February 2012.
Industry Shipperless &Unregistered Working Group Thursday 17 th September 10:30 at Xoserve.
1 Industry Shipperless &Unregistered Working Group Wednesday 7th July 10.00am at xoserve.
Allocation of Unidentified Gas Statement 2013/14 6 th February 2012.
Current and New process Current Process New Process Response: Does not want service but live supply -Passed into Orphaned Report Intends to confirm – Remains.
ScottishPower, Energy Retail MOD 282 – Introduction of a process to manage Long Term Vacant Sites May 2010 Elaine Carr ScottishPower.
Allocation of Unidentified Gas Statement 2014/15 15 th May 2013.
© British Gas Trading Limited 2011 Slide 1 Re-establishment of Shipperless Sites UNC0425 Scenarios Scenario 1 – Last Shipper only activity Effective meter.
1 Industry Shipperless &Unregistered Working Group Wednesday 8th September 10.00am at xoserve.
1 Industry Shipperless &Unregistered Working Group Thursday 7 th January 10.30am at xoserve.
13 th July 2009 Meeting of Theft of Gas Review Group (UNC245)
COR2789 – Measures to Address Unregistered and Shipperless Sites Implementation of MOD424, MOD410a & G
Gas Performance Assurance Framework 11 th January 2013.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –26 th November 2009 Distribution Workstream.
IGT and Shipper Workgroup meeting 28 th February 2011.
Performance Assurance Framework Risk Register Consultation Summary
Weekly Progress Update 3rd Aug 2018
Must Read Process Guide For Shippers
Chris Warner Network Code Manager
Weekly Progress Update 13 July 2018
Theft on Shipper-less Sites
Weekly Progress Update 15 June 2018
Elaine Carr ScottishPower
Chris Warner Network Code Manager
Summary of a MAP portfolio
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Industry Shipperless & Unregistered Working Group
Industry Shipperless & Unregistered Working Group
Weekly Progress Update 11 May 2018
Shipperless and Unregistered Workgroup
Connections & Registration
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
AUG Query Responses 21st November 2013.
Development modification group 194
Development modification group 194
Theft: Shipperless Arrangements
Unregistered Sites Reports
M Number Creation process
Development modification group 194
Development modification group 194
Shipperless/Unregistered Sites
Unregistered and Shipperless Process
Development modification group 194
Industry Shipperless & Unregistered Working Group
Presentation transcript:

Results of Group Discussion

Discussion Points Shipperless and Unregistered Sites have been partly There are a number of Shipperless and Unregistered Sites that have not been addressed by the Shipperless and Unregistered Clearance Project, nor will they be addressed by the Contact Codes to be introduced as a result of MOD410a and MOD424/425 (MUS/GSR). –Legitimately Unregistered –Shipperless Sites with No Meter Attached The group agreed that these populations should be the focus of the group’s attention.

Group Activity Split into two groups Discuss one of the topics. –Root Causes –How does this affect the Industry? –How does this affect my organisation? –Does the issue need to be addressed? –What can be done to reduce the numbers? Feedback to the whole group. Formulate any necessary actions.

Withdrawn Sites with Live MPRNs with No Meter Attached

Withdrawn Sites with Live MPRN and No Meter Background Information Current Population: 392,144 MPRN's which represent: Isolated and Withdrawn Sites Usual route to the Shipperless Pot for Isolated and Withdrawn Sites is to go through the GSR Process. Only sites where a meter has been found connected during a GSR investigation will be included. Current Population of Shipperless Pot: 5,725

Withdrawn Sites with Live MPRN and No Meter – Group Findings Root Causes Demolished Process Not Working. GSR only obligates cutting off main if no external valve available. Effect on Industry Unidentified Gas Costs. Effect on ShippersEffect on GDNs Unidentified Gas Costs. Risk that meter could be obtained and fitted. Safety. (Although Current Situation is OK by HSE Standards) UIP – Housing Developments. No Meter Fitted. Network Take Over. No Time Limit. Legitimately Unregistered. Complies with GSR and Pipeline Safety Regs and Pipeline What can be done? Change MP Status to Capped rather than Live. Data Cleansing. Sample Site Visits. Remove Service where meter has been removed.

Legitimately Unregistered

Background Information Current Population: 35,570 MPRN's which represent: Vacant sites / No Gas meter but live service / Service still in planning stage. This dataset is only updated by adding new records or when MPRNs currently in the dataset are set to DE/EX or Confirmed. We have no way of knowing if the data that determined the inclusion of a record into this dataset is still correct, i.e. has someone moved into the property and consuming.

Legitimately Unregistered – Group Findings Root Causes MAMs installing meters without supply contract – MBS MPRN Creation Process Plot to Postal Reconciliation Erroneous historic data Effect on Industry If metered – consuming gas Increasing Safety risk over time if not inspected Increasing risk of theft of gas Effect on ShippersEffect on GDNs See Above What can be done? A system flag to show “legitimate” after a site visit Labelling on site UPRN