CERN, 17/2/06 S. Paoletti The A4601H board: specifications Two independent Power Supply Units featuring: 2.5V and 1.25V regulators: –I2.5 MAX = 13 A, V2.5.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
1 S. Lusin, LV Cabling, CERN 06 Apr 06 LV Cabling 06 Apr 06 S. Lusin Fermilab / CERN Cabling from USC to UXC, Power Distribution.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
Power e Lab PowerELab Limitedwww.powerelab.com 1 An Active EMI reduction IC WT6001 POWERELAB LIMITED A Power Converter Technology Provider.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
A3016 and MAO test at CAEN Pigi, A. Boaino & CAEN.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
Detector Control System at the GIF++ A. Polini, M. Romano (AIDA+INFN Bologna) on behalf of WP group Gif++ User Meeting 11/07/2014 Outline Status.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
8/11/2006 FPIX TB meeting L. Perera 1 Pixel Power Supply Response Measurement Lalith Perera - Univ. of Iowa Carlos Florez, Simon Kwan, Charles Newsom,
Tullio Grassi ATLAS–CMS Power Working Group 31 March 2010 DC-DC converters and Power Supplies requirements for CMS HCAL Phase 1 Upgrade.
Bonding, Grounding and the NEC  Presented by The National Association of Certified Home Inspectors
8th RESS IG IMMA contribution RESS-8-9. IMMA L6/L7 contribution IMMA has decided to provide the global expertise on L6/L7-vehicles at WP29 to address.
TRT DCS overview Elzbieta Banas Zbigniew Hajduk Jolanta Olszowska (INP PAS Cracow) ID Week /TRT Operation1.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
CVD PCB, first steps. 15 mm 25 mm Chip area. No ground plane underneath the chip. Bulk isolated => only one ground line Power lines Connector: 11,1mm*2,1mm:
Modelling of TPM noise problems Greg, following discussions and measurements with David and Senerath.
Electrical and Optical Cables Installation at P5 What When How H. Breuker
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
LV and HV status of the RPC system RPC detector and trigger group.
Low Voltage LB status RPC detector and trigger group.
LHCb F. Murtas Servizio elettronica G. Corradi D.Tagnani P.Ciambrone HV_GEM per LHCB M1R1 HV power supply Introduction Introduction HV_GEM Technical specification.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
Remapping of 48V generators in US15 – Load Balancing Much better balanced load between chan A and chan B outputs More even load between generators, avoiding.
Waclaw Karpinski General meeting CMS TRACKER SYSTEM TEST Outer Barrel –TOB Inner Barrel –TIB End cap –TEC TIB TOB TEC Different Geometries One.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
André Augustinus 16 September 2002 PVSS & Framework How to get started.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Status of NA62 straw electronics Webs Covers Services Readout.
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
Thermal Screen Grounding CERN - Dec. 10 th, 2003 Enzo Carrone The thermal screen grounding and the tracker: a scary concert Enzo Carrone.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
PXD – DEPFET PS noise emission tests Mateo Iglesias Fernando Arteche.
Design summary Status of the development & production - test run with S3a and S3b prototype - performance tests To do list for production & development.
The new SVD Power Supplies o General requirements o Power supplies structure o Tender process o Test system 2/10/2014SVD Power Supplies1 F.Forti, INFN.
Wiener crates; An installation and power supply analysis. Magnus Bjork Be/Co/Fe
TOF Low Voltage and High Voltage Systems Vahe Ghazikhanian UCLA Department of Physics and Astronomy V. Ghazikhanian July 21, 2005.
Calorimeter Mu2e Development electronics Front-end Review
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
Injectors BLM system: PS Ring installation at EYETS
DT Infrastructure: LV, HV, Gas
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
RPC Detector Control System: towards the final system
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

CERN, 17/2/06 S. Paoletti The A4601H board: specifications Two independent Power Supply Units featuring: 2.5V and 1.25V regulators: –I2.5 MAX = 13 A, V2.5 MAX= 6.5 V –I1.25 MAX = 6 A, V1.25 MAX = 5.25 V –noise: Vpp (20 MHz bw)  10 mVpp –Efficiency (  ):  ≥ 40% at 3%,  > 70% at 90% of the max. power. 2 independet HV regulators: – V –IMAX = 10mA /ch –noise: Vpp (20 MHz bw)  30 mVpp Current limiters and trip procedure LV comparators: hardware Over Voltage protection Isolation: ZCM > 50 5 MHz Hostile Environment: B 20 MeV ) ≈ 10 9 /cm 2 y external alarms: Interlocks, Reset and mains faults –The Interlock alarm is a current level ( 9 mA current loop ). Only when the level is removed the PSU can be used and programmed.

CERN, 17/2/06 S. Paoletti The PS system evolution (my point of view) Power supplies are detector components The past year brought to us: –first fully integrated complex detector structures –“H” type power supplies The R&D was performed by Florence (G. Parrini) according to the original scheme, with “F” power supplies CMS decided to go into UXC. First “H” power supplies then were available since Summer Needs of integration centers were first satisfied: Florence got one new crate and few “H” power supplies only in fall 2005 Complex detector structures brought us more understanding of: –some noise and oscillation issues –grounding scheme –interlocks

CERN, 17/2/06 S. Paoletti The PS system evolution (my point of view) There are (of course) some implications also for the PS system Some issues were identified and recently Florence studied with CAEN how to address them: –Grounding (lateral plates, back boards, crates) –Firmware upgrade (branch controller) –600 Hz oscillation –ramp up / ramp down behavior Changes on the power supply system (not only PSMs) should be addressed in a coordinated way. Any non agreed “experimenting” on PSMs and crates is going to increase entropy, duplicate the work, jeopardize the activity Florence is the technical contact for the power supplies Florence has to take part in any technical discussion with CAEN

CERN, 17/2/06 S. Paoletti Grounding Recently agreed with CAEN which is the most effective method to ground the PSMs and the backboards We defined the scheme which brings to ground front panels, lateral plates, back boards: –The reference ground is the crate (LAB ground) –The 48V RTN is to be connected to the same ground (but on a separate path)

CERN, 17/2/06 S. Paoletti Al rails 48 Vp RTN +48 Vp earth GND to PSMs Also the scheme to ground the crate was fixed: –get rid of lousy ground wires

CERN, 17/2/06 S. Paoletti Firmware upgrades Let’s be prepared: there will be periodical firmware upgrades The same line of models (EASY) regards many different detectors The most recent upgrade: –branch controller firmware upgrade (could not see more than 15 boards on the same branch) Other upgrades foreseen: –A4602 –A4601 (asked to transform a long UNV in permanent alarm)

CERN, 17/2/06 S. Paoletti 600 Hz oscillations The time response of the sensing loop used to be (by design) O(0.5 ms) It was clear from the beginning that the sensing loop had to be tuned on realistic loads, with final cables In September 2005 CAEN intervention on TOB rods was required: –they had instabilities –it was decided to relax the timing of the sensing loop O(1 ms). –The latest “F” type PSMs where tuned on TOB ! –The same scheme was adopted for “H” type PSUs This year (end of October) TOB reported 600 Hz oscillations –Are they due to the different PSU model ? –Something changed in the rod impedances ? –LIC cables were now used (in place of MSC) ? –Oscillations can be measured with a scope at the output connector –Not all PSMs showed the oscillations

CERN, 17/2/06 S. Paoletti 600 Hz oscillations CAEN intervention speeded up again the sensing loop in all PSMs at 186. Florence was not informed in advance of the intervention –missed one opportunity: cannot anymore compare “good” and “bad” PSMs TIB (Florence structure) did not observe this kind of oscillations TIB (Pisa): study is going on. If any, the effect has to be quite tiny wrt TOB observations. TEC now reports this kind of oscillations Florence (again) was not informed –We came to know this only by CAEN

CERN, 17/2/06 S. Paoletti ON/OFF behavior I recently tested the Florence A4601H performance (I CM, Z CM, …) –I found a problem when powering the LV cannels with very high current loads. –For I 2.5 > 7.5 A the 1.25 would not raise –Never observed with “F” type boards CAEN introduced a change: if any of the LV channels is not reaching a Vthr value (~ 0.5 V) the sensing loop of that channel will not start this feature was introduced in order to protect from accidental wrong sense connection on the detector structure Not all A4601H have this feature introduced: we now have the IDs of A4601H not affected by this feature I 2.5 =10A I 1.25 =0A

CERN, 17/2/06 S. Paoletti ON/OFF behavior The solution: lower the Vthr to ~0.3 V change synchronization and equalize the speeds of 2.5 and 1.25 ramps I 2.5 =10A I 1.25 =0A

CERN, 17/2/06 S. Paoletti ON/OFF behavior I 2.5 =10A I 1.25 =0A Another problem spotted: the 2.5V turn-OFF is too quick this can cause over voltages on the 1.25 high I 2.5 Solution slow down the 2.5 ramp

CERN, 17/2/06 S. Paoletti Interlocks (I leave this to Machi)

CERN, 17/2/06 S. Paoletti The “service pack 1” Changes to be performed on A4601H: –grounding –ON/OFF ramps –600 Hz capacitor –Interlocks ? Desirable to implement them in one step  “service pack 1” Grounding and ON/OFF ramps are “sound” modifications: they are being implemented (already since January) to the rest of the A4601H and crate production We’d like to experiment the 600Hz capacitor on TIB structures before accepting it as a “universal” modification. –have also to check that it does not interfere with the LV ramp corrections I arranged for having upgraded boards (with all corrections implemented) quickly: –boards are now ready in Pisa to be tested on TIB structure

CERN, 17/2/06 S. Paoletti The “Service Pack 1” After the modifications will be “certified” on the TIB structure, we will be ready to implement the upgrade to all the PSM production. DB essential: –serial number –movements –problems encountered –firmware version –hardware revisions/interventions Please be disciplined: communicate all data to Horst.

CERN, 17/2/06 S. Paoletti Further Remarks

CERN, 17/2/06 S. Paoletti 48 V We need a CMS-tracker contact for the 48V –We need equipment: certified by quality assurance with proper electrical characterization The system foresees a 48Vs independent of the 48Vp and backed up for O(100 sec) –the 48Vs has to be foreseen –the system is not foreseen to work without 48Vs –contradictory information should not be spread around

CERN, 17/2/06 S. Paoletti Power Consumption and Heat Dissipation G. Parrini first made the calculation of the power demand and heat dissipation on racks I updated those calculations two times (according to variations on the known cable lengths) – There are important discrepancies wrt numbers currently used for crate and rack dimensioning I raised the point several times –I got no reply, I got no further news about the racks discrepancies mainly due to: –bad knowledge of PSU efficiency curves and power consumption –bad knowledge of cable resistances –different considerations on the “safety margin” to be applied on top of the standard consumption

CERN, 17/2/06 S. Paoletti Power Consumption and Heat Dissipation July 2005, talk by Shabbir Akhtar

CERN, 17/2/06 S. Paoletti Cabling and racks distribution –power supplies –cables –DCS Florence is committed in all of these items Good (bi-directional) communications should be kept in order to reach the goal.

CERN, 17/2/06 S. Paoletti DCS Florence made important contributions to the control system of the power supplies (see R.Chierici’s talk July 2005) –first implementation of A4601 into JCOP –first working FSM We intend to keep the involvement into ps-related DCS tasks and to take part to the decisions: –control of PS –FSM –PS safety issues Main activities are now going to be CERN-centered (discussions, test stations, MTCC) We should find a way to collaborate and assure a proper flow of the information Weekly VRVS meeting will be established

CERN, 17/2/06 S. Paoletti Link with CMS infrastructure Flow of information to be improved here Interface with A.Herve` for PSU and cable issues to be defined What does it mean: we don’t have any local ground connection ? Was this configuration ever discussed ?