Mining Economics Minnesota Minerals Education Workshop June 16, 2015 By Peter Clevenstine Division of Lands & Minerals Department of Natural Resources
USA Metal Consumption
USA Consumption Metric Tons
What is an Ore? Rock/Mineral that can be sold at a profit Rock/Mineral that can be sold at a profit Types of minerals Types of minerals Fuels – coal, oil, gas Metallic minerals - Ferrous and non ferrous Industrial minerals - Sand & gravel, limestone, phosphate, quarries, clay
Principal Ore Minerals Non Ferrous (Non Iron) Non Ferrous (Non Iron) Sulfide minerals – Copper, Nickel, Cobalt, Platinum, Paladium Bauxite – Aluminum ores Bauxite – Aluminum ores Hydrated alumina oxide minerals - Gibbsite Al 2 O 3 – 3H 2 O, Boehmite Al 2 O 3 – H 2 O
Principal Ore Minerals Iron ores Iron ores Hematite Fe 2 O 3 Magnetite Fe 3 O 4
Minnesota Mesabi Range Providing Iron Ore to the North American Steel Industry every year - Since 1892 Hibbing
Mesabi Range Iron Ore Production (Natural Ore and Pellets) Source: MN Department of Revenue
Active Permit to Mine Areas
Mesabi Iron Range Range Cities Grand Rapids Babbitt Nashwauk Hibbing Eveleth Virginia Aurora
Current pits Beyond 2050 Auxiliary lands Chisholm Keewatin Nashwauk Hibbing Calumet
Iron Ore Resource Modeling Sherman Example Sherman
Potential Mining Areas S M
Exploration Drilling S M
Cross-Section 1 S M
S M
Cross-Section 2 S M
S M
Subject Area S M
Cross-Section 1
Resource Modeling
Focus Area
Block Model Section View
Surface Topography
Ore and Rock
Ore Grade – Weight Recovery
Mine Cost Information 2008 Taconite Pellet Production Cost Crude OreRock Block 200x200x ,000 Tons350,000 Tons Per TonPer BlockPer TonPer Block Mining cost$2.15 Processing Royalty Admin Taxes $13.45$5,110,000$2.15$752,500
Taxable Mine Value 2008 Taconite Pellet Value - $80.96/ton Crude OreRock Block 200x200x ,000 Tons350,000 Tons Weight Recovery Revenue Per Ton Revenue Per Block Revenue Per Ton Revenue Per Block 24%$19.43$7,383, %$21.05$7,999, %$22.67$8,615, %$24.29$9,230, %$25.91$9,846,
Net Value per Block Revenue Per Block Cost per Block Net Value per Block Rock- 0 -($752,500) Crude Ore Weight Recovery 24%$7,383,000($5,110,000)$2,273,000 26%$7,999,000($5,110,000)$2,889,000 28%$8,615,000($5,110,000)$3,505,000 30%$9,230,000($5,110,000)$4,120,000 32%$9,846,000($5,110,000)$4,736,000
Ore Grade – Weight Recovery
Economic Pit
Net Value $28.2 Million ,850,000 tons rock 7,980,000 tons ore
Net Value Southern Limit? ,350,000 tons rock 7,980,000 tons ore $20.7 Million Net Value
How does a mining company evaluate the cost of environmental measures? A mining company may be asked to do something different and we hear a mining company say they can, or they cannot, afford to do it. How is that determination made?
Project Time Line Exploration Environmental Review Construction Production Closure
Next Steps Delineate the resource with available data and preliminary economics. Identify additional drilling and/or analysis that would help further define this resource. Create mining plans Auxiliary lands necessary to extract the resource.
Economic Pit 37 blocks of rock 21 blocks of ore
Mine Scheduling OreRockTotal Period Period Period Period Period
Mine Sequencing Period One 7 blocks of rock 4 blocks of ore 4th4th4th 5th5th5th5th4th4th 3rd3rd3rd 2nd 2nd3rd 2nd2nd
Mine Sequencing Period Two 9 blocks of rock 4 blocks of ore 4th4th4th 5th5th5th5th4th4th 3rd3rd3rd 3rd
Mine Sequencing Period Three 9 blocks of rock 4 blocks of ore 4th4th4th 5th5th5th5th4th4th
Mine Sequencing Period Four 8 blocks of rock 5 blocks of ore 5th5th5th5th
Mine Sequencing Period Five 4 blocks of rock 4 blocks of ore
Mining Cost Period 1Period 2Period 3Period 4Period 5 Rock tons Ore tons Mining cost
Processing Cost and Revenue Period 1Period 2Period 3Period 4Period 5 Ore tons Ore grade Processing cost Revenue
Additionally Preproduction costs Preproduction costs Land position ExplorationFeasibility Environmental review/permitting Construction Post production Post production
Project Time Line Exploration Environmental Review Construction Production Closure
Project Cash Flow Earnings before Interest, Taxes, Depreciation & Amortization Year Total Cash in-$1.00-$3.00-$10.00-$14.00 Project Earnings $3.00$4.00$3.00$5.00$3.00 -$3.00$18.00 Cumulative-$1.00-$4.00-$14.00-$11.0-$7.00-$4.00$1.00$4.00$7.00$4.00 $14 Investment $18 Earnings $ 4 Profit Payback in 3 to 4 years of production
Evaluate Investment Options Upfront Investment Upfront Investment Net Present Value Net Present Value Internal Rate of Return Internal Rate of Return
Upfront Investment Capital - $ Capital - $ Labor - People Labor - People Management & Administrative Management & Administrative
Net Present Value Value today of a dollar amount at some specific point of time Value today of a dollar amount at some specific point of time Considers that a dollar invested today would earn interest Considers that a dollar invested today would earn interest Interest rate, or present value factor, is a function of a company’s cost of money (debt & equity) and risk tolerance Interest rate, or present value factor, is a function of a company’s cost of money (debt & equity) and risk tolerance
Time Value of Money Year Total Cash in-$1.00-$3.00-$10.00-$14.00 Project Earnings $3.00$4.00$3.00$5.00$3.00 -$3.00$18.00 Cumulative-$1.00-$4.00-$14.00-$11.0-$7.00-$4.00$1.00$4.00$7.00$4.00 Beginning$1.00$4.05$14.25$14.96$15.71$16.50$17.33$18.20$19.11 $0.05$0.20$0.71$0.75$0.79$0.83$0.87$0.91$0.96$6.07 Cash in$1.00$3.00$ Ending$1.00$4.05$14.25$14.96$15.71$16.50$17.33$18.20$19.11$20.07
Net Present Value Year (n) % Discount Rate (i) Current$1.00 PV Factor 1/(1+i) n Present Value $1.00$0.91$0.83$0.75$0.68$0.62$0.56$0.51$0.47$0.42$0.39 5% Discount Rate (i) Current$1.00 PV Factor 1/(1+i) n Present Value $1.00$0.95$0.91$0.86$0.83$0.78$0.75$0.71$0.68$0.64$0.61
Net Present Value Year Total Cash in-$1.00-$3.00-$10.00 Project Earnings $3.00$4.00$3.00$5.00$3.00 -$3.00 Cash Flow-$1.00-$3.00-$10.00$3.0$4.00$3.00$5.00$3.00 -$3.00 5% Discount Rate (i) PV Factor 1/(1+i) n Present Value -$0.95-$2.72-$8.64$2.47$3.13$2.24$3.55$2.03$1.93-$1.84$ % Discount Rate (i) PV Factor 1/(1+i) n Present Value -$0.91-$2.48-$7.51$2.05$2.48$1.69$2.57$1.40$1.27-$1.16-$0.59
Internal Rate of Return Discount Rate where the sum of the Net Present Values of a stream of cash flows is zero. Discount Rate where the sum of the Net Present Values of a stream of cash flows is zero.
Internal Rate of Return Year Total Cash in-$1.00-$3.00-$10.00 Project Earnings $3.00$4.00$3.00$5.00$3.00 -$3.00 Cash Flow-$1.00-$3.00-$10.00$3.0$4.00$3.00$5.00$3.00 -$ % Discount Rate (i) PV Factor 1/(1+i) n Present Value -$0.93-$2.57-$7.92$2.20$2.71$1.88$2.90$1.61$1.49-$1.38$0.00
How does a mining company evaluate the cost of environmental measures? A mining company may be asked to do something different and we hear a mining company say they can, or they cannot, afford to do it. How is that determination made?
How Environmental Measures Effect Mining Cost 1. Delaying construction and subsequent production 2. Increased construction cost 3. Higher mining or processing cost 4. Less mine reserves/shortened mine life 5. Mine closure expense
Project Time Line Exploration Environmental Review Construction Production Closure