Program Manager’s Review 06/25/2004 Overview of the Radiation Protection (RP) Department Five- Year Goals (From the 50,000-Foot Level)

Slides:



Advertisements
Similar presentations
DOE O Changes and the CRS
Advertisements

Safety Software QA at BNL’s Collider-Accelerator Department (C-AD) Accelerator Safety Workshop E. Lessard Collider-Accelerator Department August 12-14,
ENVIRONMENTAL UNIT IN AN ICS STRUCTURE. EU Mission Statement The Environmental Unit is established to provide technical and scientific expertise and capabilities.
Nuclear and Radiation Safety Center, China Regulatory requirements on management of radioactive material safe transport in China Reporter: Xu Chunyan Division.
EPA EMS General Awareness Training Presented by David Guest, Esq. U.S. EPA Washington, D.C.
LABORATORY RECORDS AND DOCUMENTATION Part III. Records in support of the requirements described in the 2003 RSM must be maintained in the laboratory.
Radiation Safety & Compliance External Beam –Electrons (linacs) –Photons (linacs, Gamma Knife) –Protons (Summer 2013) Brachytherapy –Sealed Sources –Radiopharmaceuticals.
IAEA International Atomic Energy Agency HPS Annual Meeting Current Situation and Future Challenges on Occupational Radiation Protection in Latin America.
Alexander Brandl ERHS 561 Emergency Response Environmental and Radiological Health Sciences.
Scientists Leverage WebFOCUS and FOCUS to Manage a Program Joseph P. Ring, Ph.D., CHP Radiation Protection Officer.
Establishment of a Training Dosimetry Laboratory in Cairo University Dr. Hassan Fathy for NSPA.
Regulatory Body MODIFIED Day 8 – Lecture 3.
Virtual Environmental, Health & Safety Manager Compliance Management System T. Cozzie Consulting, Inc. telephone
Environmental Health and Safety Radiation Control and Radiological Services.
Protection Against Occupational Exposure
Bapetco NORM Control Case Study IDENTIFY ASSESS CONTROL & RECOVERY.
IAEA International Atomic Energy Agency International Workshop on the Safe Disposal of Low Level Radioactive Waste WG3 debriefing.
Nuclearsafety.gc.ca Development and Implementation of Regulatory Requirements for the Security of Radioactive Sources A Canadian perspective Karen Mayer,
EM - TRANSPORTATION. EM Office of Transportation - Organization & Responsibilities Basis of Organization & Responsibilities Basis of Organization & Responsibilities.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
Authorization and Inspection of Cyclotron Facilities Inspections.
IAEA International Atomic Energy Agency Senior Regulators Meeting Technical Cooperation Programme Supporting Radiation Safety Infrastructure in Member.
ACADs (08-006) Covered Keywords Commission, regulation, advisory, standards. Description This presentation provides general information about each of the.
19-20 March 2009 IAEA, Vienna RER/9/096 Regional Planning Meeting "Strengthening National Infrastructures for the Control of Radiation Sources" (TSA-1),
Tank Operations Contract 1 Presenters: Fred Beranek Everett Gray Results of EFCOG/DOE Safety Culture Pilot Focus Group Assessment DOE ISMS Conference August.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
MODULE “PROJECT MANAGEMENT AND CONTROL” RADIATION PROTECTION SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
Thomas S. Tenforde NCRP President 67 th Meeting of the NEA Committee on Radiation Protection and Public Health Paris, France May 12-14, 2009 Overview of.
OAS Meeting August 2012 Jennifer Opila (CO) and David Allard (PA)
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Republic of Moldova.
Information Management Chapter 12. Learning Objectives Describe the purpose of data collection and reporting. Identify the data that should be collected.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: ESTONIA.
Overview of Integrated Solid Waste Management (ISWM) Presentation made at the European Commission 7 th Framework Programme on Capacity Building Workshop.
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Regulatory Authority.
56th Regular Session of the IAEA General Conference
Health Effects Program: Technical Support for NRC Programs Elijah Dickson Eli Goldfeiz, CHP, Ph.D. Tony Huffert, CHPDoris Lewis Robert Meck, Ph. DMohammad.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Republic.
Technical Meeting on Milestones for nuclear power infrastructure development Radiation Protection Khammar Mrabit Head, Regulatory Infrastructure and Transport.
Brookhaven Science Associates U.S. Department of Energy Sustaining Excellence in Radiological Operations Through Peer Surveillance C. Schaefer, CHP D.
Software QA Safety Systems at SLAC Enzo Carrone Controls Department – Safety Systems SLAC National Accelerator Laboratory.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part III.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
IAEA International Atomic Energy Agency. IAEA Dr. Abraham Gregorio de Rosa,Sp.Rad Radiologist in HNGV Dili, Timor Leste 2 Perspectives on regulatory models.
Argonne National Laboratory Experience and Perspectives on Environmental Remediation Karen P. Smith Environmental Science Division Argonne National Laboratory.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: ROMANIA.
Regulatory/Requirements Review Process Fall, 2000 Survey In this day of economic and trade globalization, multinational companies are responsible for an.
International Atomic Energy Agency ASSESSMENT OF OCCUPATIONAL EXPOSURE DUE TO EXTERNAL RADIATION SOURCES AND INTAKES OF RADIONUCLIDES Dosimetry Services.
James C. Liu 1 and Lawrence S. Walker 2 1. SLAC National Accelerator Laboratory, CA, USA 2. Brookhaven National Laboratory, NY, USA 1. Introduction ANSI.
Radiation Safety Regulations
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
Program Manager’s Review Joe Christy September 19, 2005.
IAEA International Atomic Energy Agency Burkina Faso Delwendé NABAYAOGO RAF9038 Final Coordination Meeting Arusha, Tanzania 2 – 5 December 2013.
Radiation Protection computing tools Gérald Dumont HSE/RP.
Program Manager’s Review Dosimetry Program Henry Tran (James Liu) September 19, 2005.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
ESTABLISHING THE BIOLOGICAL DOSIMETRY LABORATORY IN LITHUANIA Albinas Mastauskas, Žygimantas Vaisiūnas Radiation Protection Centre Kalvarijų str. 153,
Technical Services. Objectives To identify the technical services needed within the infrastructure for an effective implementation of regulatory programme.
PHILIPPINES Report: Policies and implementation strategies on HUMAN RESOURCE DEVELOPMENT to introduce NPPs Adopting RAIS 3.2 AS THE NATIONAL REGISTER OF.
Training Module Preparation for “AERB norms, licenses and signage”
LOW LEVEL RADIOACTIVE WASTE FORUM--FALL 2014 MEETING
THAILAND Training and Tutoring Feedback
RADIATION SAFETY IN NUCLEAR MEDICINE
Program Manager’s Review 06/25/2004
Module 5 RASP Regulations.
Radiation Protection Handbook
RADIATION PROTECTION IN HEALTH FACILITIES
Presentation transcript:

Program Manager’s Review 06/25/2004 Overview of the Radiation Protection (RP) Department Five- Year Goals (From the 50,000-Foot Level)

Program Purpose Protect and preserve the radiological health of our workers, the public, and the environment.

Requirements Performance goals - ES&H ISMS: Outcome Performance Measures for FY2004 ES&H ISMS: Outcome Performance MeasuresES&H ISMS: Outcome Performance Measures Performance Measure 2.3: Exposures of personnel to ionizing radiation will be adequately controlled.Performance Measure 2.3: Exposures of personnel to ionizing radiation will be adequately controlled. Performance Measure 2.3.b: Lost or unreturned dosimeter investigations and dose assignments are carried out in a timely manner (within 90 days of the monitoring period).Performance Measure 2.3.b: Lost or unreturned dosimeter investigations and dose assignments are carried out in a timely manner (within 90 days of the monitoring period). Performance Measure 2.4.a: Radioactive materials, including contaminated and/or activated materials, are controlled at all times.Performance Measure 2.4.a: Radioactive materials, including contaminated and/or activated materials, are controlled at all times. Performance Measure 4.2.b: Low-level waste generated will be managed by the Radioactive Waste and Materials Group in compliance with applicable DOE Orders and regulatory requirementsPerformance Measure 4.2.b: Low-level waste generated will be managed by the Radioactive Waste and Materials Group in compliance with applicable DOE Orders and regulatory requirements

ES&H ISMS: Work Smart Standards ES&H ISMS: Work Smart Standards Package & Transport Radioactive Material10CFR71 Occupational Radiation Protection10CFR835; Atomic Energy Act DOE-N Radiation Protection, Public & EnvironmentDOE O 450.1, CRD (as applicable) Management of Nuclear MaterialsDOE Order 474.1A Hanford Solid Waste Acceptance CriteriaHNF EP 0063 Washington Dangerous Waste RegulationsWAC Radioactive Waste ManagementDOE-O-435.1(except 4.b.) Radioactive Waste ManagementDOE-M , Chapters I and IV (except I.1.E, IV.D.4, IV.E, IV.G.(1)(d), IV.M.(1)(c), V.M.(2)(e), IV.M.(3), IV.N.(2),V.P, IV.Q, IV.R.(1), and IV.R.(3)) Environmental ProtectionDOE O 450.1, CRD (as applicable) Environmental ProtectionDOE-O , Ch. II, paragraph 1 [except 1.a(3)(c) & 1.c], 2, 3, 5, 6, 7, 8a; Ch. III & IV ES&H ISMS: Work Smart Standards Requirements

SLAC-wide ES&H Goalshttps://www-internal.slac.stanford.edu/esh/divreports/fy04qr2.pdf RP Five-Year Plan Synopsis in two minutes:  Advance staff education and training.  Develop, acquire and use state of the art methodologies-for shielding, radiation generation, and transport calculations.  Perform world-class research to meet the current & future critical needs in safety design & operation.  Lead the project to properly manage tritium in groundwater.  Review Sealed Source Inventory, discard non-useful sources.  Continue to improve radioactive and mixed waste management programs. Help generators understand their responsibility.  Explore ways to reduce generation of radioactive wastes.  Continue to explore ways to proactively plan for potential waste streams.  Plan the environmental clean-up program.  Advance the environmental monitoring and impact assessment techniques and program.  Advance the high-level dosimetry program.  Enhance web based information system.  Increase communication with project physicists, and Safety Coordinators.  Communicate Radiation Safety Policies to customers.  Have up-to-date department priority list/calendar of activities.  Comparison of radiation safety policies and practices with other labs.  Active participation in workshops, conferences and scientific meetings.  Invitation of project physicists, beam line designers, project leaders and guest speakers to RP meetings and seminars.  Cross-train group leaders in other lead fields of expertise. Improve planning for retraining of HPTs  Improve the radiological safety analysis policies (Technical Basis Document)  Evaluate the feasibility of using a state-of-the art Access Control System at SLAC  Promote proaction in detecting emerging problems via increasing operational presence and oversight.  Make electronic files of radiological surveys.  Archive paper radiological surveys.  Convert paper dosimetry records to electronic records.  Continue to improve electronic records tracking system. Save all shipping documents in electronic format.  Make forms available electronically for customers to access.  Streamline the processes and enhance the capability of radioanalysis lab. Requirements

 Draining of resources retrieving and processing very old paper records (individual dose reports, surveys, etc.)  Expand RP Website as growing RP services and RP data management needs continue to increase. Risks/Opportunities

 Convert as many RP records to electronic format as feasible.  Add a customer-feedback feature to the RP Department Website.  Move the whole RP Department into one building. Goals to fill gaps and mitigate risks

Other goals and opportunities for the ES&H Division  Make RP electronic records compatible linkable, searchable, and accessible with other ES&H Division and SLAC Institutional Database files.

Our Department Five-Year Goals quantized: “ Radddd “ Physics, not bad physics…. and TOP-erational Health Physics, not Slop-erational Health Physics