VC117 February 2009Jean-Sébastien GraulichSlide 1 MOM Report o Yagmur Torun ( June 15 - July 14) o J.S. Graulich ( July 13 - August 7) Jean-Sebastien Graulich,

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

K. Long, 18 April, 2015 Beam-line status — red sky at night?
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS
MICE Target Report Chris Booth (for target team) Sheffield 7 th May 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
MICE FAC Alain Blondel 1 Summary of run meeting 8 August 2011 Present: Andy Nichols Tim Hayler Pierrick Hanlet Gail Hanson Linda Coney Victoria.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
MICO 9th Aug 2010J.S. GraulichSlide 1 MOM report o Last Week o Run Plan for this Week o Machine Physics Jean-Sebastien Graulich, Geneva.
MOM Report. Shield Wall – Gone Before During After 2.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 26, 2010.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 4, 2011.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO April 6, 2009.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
CM26 March 2010Jean-Sebastien GraulichSlide 1 Online Summary o The heplnw17 case o DAQ o CAM o Online Reconstruction o Data Base o Data Storage Jean-Sebastien.
1 Project Manager Report Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
Spokesmouse’s News Agenda: o VC 22nd April o 12th-13th May posters for EPAC (Vittorio Palladino) o VC 20th May o VC 17th June o CM27 (RAL) 7th-10th July,
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Detector DAQ Hardware Status o Introduction o Preliminary list o Plan for action o Summary Jean-Sebastien.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
MICE VC Aug '10J.S. GraulichSlide 1 MOM report o Achievements Since CM27 o Daily Operations o Run Plans o Summary Jean-Sebastien Graulich, Geneva.
Linda Coney MC VC May 19, 2011 MICE Operations Manager Report.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
M. apollonio MICE Beamline summary. - Beamline parallel session (June 1 st ): - envisaged goals (Alain) - assess readiness of the line magnet status (Ken)
MOM Report Victoria Blackmore VC /06/11 1/7.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
MOM Report Paul Hodgson Paul Soler Victoria Blackmore VC-139: 14/04/111/8.
MICE VC Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
MICE VC MOM Report, 25 th February 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - Machine Physics and User Runs - Suggestions.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
- MICE - The Muon Ionization Cooling Experiment Jean-Sebastien Graulich, Univ. Genève o Introduction: Aims And Concept o Design o Infrastructure: Hall,
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
SPOKESMAN’S UPDATE K. Long Imperial College London/STFC.
M. Bonesini – CM 291 PID detectors summary M. Bonesini Sezione INFN Milano Bicocca.
MICE VC 12/2/20091 [23/1-19/2] MOM report Hogdson Apollonio Zisman 23/1/09 12/2/09 19/2/09 Relevant Issues: - NO target since december accident  no data.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
MICE, Uni-Geneva and the transnational access to MICE (MICE-TNA)
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
CALO News Pascal Perret LPC Clermont 22 January 2012.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
Mike Andrews August 17, Week 16 NuMI Activities Leak testing of DI bottles & Casks Complete all bottles & casks RAW Impulse line upgrade Finished.
ELENA installation progress F. Butin / ELENA collaboration.
S A Griffiths CM42 June 2015 Electrical & Control.
Target Installation Plan
MICE Operations Scenario Run 1
Project Manager’s Report + DC/MoM Report
Facility upgrade Housekeeping, rad waste segregation, chemicals, safety issues, new configurations. Please see me or Keith.
First Assembled Rod in US
UPPSALA UNIVERSITY_GERSEMI PROJECT
One Coil Gun Magnet February 2, 2016.
Polarized 3He target installation
Presentation transcript:

VC117 February 2009Jean-Sébastien GraulichSlide 1 MOM Report o Yagmur Torun ( June 15 - July 14) o J.S. Graulich ( July 13 - August 7) Jean-Sebastien Graulich, Geneva

Summary  Encouraging and visible progress in the hall Air conditioning operational DK Solenoid cool down started Electrical Installation Painting Magnet cooling water on. Soak test scheduled for next week TOF1, KL and BPM back in place  One Big Question Will the target be ready in time  One focus point ISIS shut down: August 13 to September 15 Not much more to say So I have included many pictures… VC117 February 2009Jean-Sébastien GraulichSlide 2

R78  I have tried to tidy up  Please Cooperate No more tools stored in the office Individual paper trays VC117 February 2009Jean-Sébastien GraulichSlide 3

Hall Progress  Electrical installation (see Andy’s talk) Nearly finished Fiat Lux VC117 February 2009Jean-Sébastien GraulichSlide 4

Hall Progress  Painting Mainly finished Hall clean and shiny VC117 February 2009Jean-Sébastien GraulichSlide 5

DK Solenoid  Cool down in progress (See Mike’s talk) VC117 February 2009Jean-Sébastien GraulichSlide 6 Transfer line repaired Cooling faster than in April Pierrick provided an EPICS app to ease the readings

Detectors  Back in place Still have to be aligned KL offset by 20 cm due to the moving platform VC117 February 2009Jean-Sébastien GraulichSlide 7 TOF1 KL BPM1 BPM2

Magnets  Water to the downstream magnets ON One leak on Q9 had to be fixed (pressure regulator valve)  Chillers tend to go on Alarm Just because we are not enough demanding (no heat load)  Marco Apollonio is preparing for soak test VC117 February 2009Jean-Sébastien GraulichSlide 8 Water flow is stable Hall Probe Re-discovered in R76

Target  Shafts manufactured To be welded and coated  Power electronics upgraded New fibers pulled to MLCR  The decision to install it or not will be taken on Aug 20 VC117 February 2009Jean-Sébastien GraulichSlide 9

Controls  Pierrick is working hard to include the CAEN HV power supplies in EPICS VC117 February 2009Jean-Sébastien GraulichSlide 10

Conclusion VC117 February 2009Jean-Sébastien GraulichSlide 11  We are approaching the end Don’t stop now…