Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.

Slides:



Advertisements
Similar presentations
Status of Cryogenics at point 4 following the power cut L. Tavian 20 August 2011.
Advertisements

Daikin Altherma™ Troubling Shooting
André Augustinus 16 June 2003 DCS Workshop Safety.
38GXC(Q)/40GXC(Q) Service Training Sizes 18 and 24K.
Long shutdown 2013: Electrical distribution activities 09/03/2012 IEFC 2012 Workshop F. Duval on Behalf of EN/EL group.
Operation TCR 2 nd of July to 10 th of September 2001 More than 20 major events Events grouped by equipment group and zone affected.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
Pixel Cooling System Modifications C. Newsom December 17, 2009 University of Iowa.
Consolidation program SPS Main Power Converters (Dipole & Quadrupole) K. Kahle / Q. King / G. Le Godec (TE-EPC) IEFC Workshop, 9 March 2012.
Tomasz Ladzinski GS/ASE. LASS Annual Maintenance & Tests General Principles Each winter shutdown preventive maintenance of EIS takes place. It is followed.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
D. Bozzini, EN-EL-HT, ATOP Days 2009, 4-6 March ELECTRICAL NETWORK: 18 KV NETWORK REVIEW AND STATUS OF THE SPS CONSOLIDATION PLAN D. Bozzini on.
UPS network perturbations in SX2 Vincent Chareyre EN-EL-SN ALICE Technical Coordination Meeting 7 May 2010.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
The cryogenic systems of the ATLAS and CMS detectors Johan Bremer on behalf of TE/CRG 06/06/2013AFF.
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
ATC/ABOC 23 January 2008Session 5 / MTTR and spare parts G. Peon, J. Inigo-Golfin TS/CV MTTR and Spare parts for the LHC BACKBONE (TS/CV)
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Christophe Mugnier, on behalf AB/PO Group ATC-ABOC days, 23 January 2008 AB/PO equipment review and Stand-by service description for the power converter.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Major power converter issues for the restart of PS & SPS machines and their experimental areas in 2006 Jean-Paul BURNET for AB/PO PS&SPS days January.
Status of North Area Target (TCC2) & prospects EATM 28/07/2015D. Grenier1 Targets (T2, T4, T6 and T10) replaced in 2014 during LS1 (+ 4 spares) Previous.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire SSD/SDD Proposal Upgrade 30/08/2012
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Cooling and Ventilation Activities M. Battistin – EN/CV/PJ IEFC Workshop th March 2012 « CONSOLIDATION and UPGRADE PLANS for the INJECTOR COMPLEX.
EN-CV interventions during YETS
 Overview of the run 2009 for CV  Major improvements in Water treatment - Demineralised water production - Cooling control  Major concerns for.
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
Jean-Paul BURNET, AB/PO ATC-ABOC days, 22 January 2007 PS Main Power System: What has been done from June 2006? What will be the situation in 2007? PS.
BA6 Cooling Towers Test Day Process Control Functionality and Performance Tests TCR – PCR Monitoring.
J. Pedersen, ST/EL Consolidation of the CERN technical infrastructure and civil engineering. J. Pedersen ST 6 th ST workshop, Thoiry, 1 – 3 April 2003.
Power Quality Karsten KAHLE Electric Power Converter Group (TE-EPC) High Power Converter Section Review of CERN’s Electrical Power Network October.
ATC/ABOC Days, 22 January 2007 The safety electrical networks at CERN Anne Funken, TS-EL.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
ABOC/ATC days Electrical Network: Selectivity and Protection Plan José Carlos GASCON TS–EL Group 22 January 2007.
On behalf on EN-EL October 1 st, 2015 YETS Works EN-EL [ CF excluded ]
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Restarting Cooling, Ventilation for PS and SPS. PS /SPS days 2006.
TE-CRG Activities D. Delikaris, TE-CRG.
2015 Operations Stay Treat CHL2 4K Cold Box Modifications SC1 2K Cold Box CC4 Failure Helium and LN2 Losses Contamination Operations Stay Treat.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
18/March/2008OP-days S.Mataguez / O.Hans1 Hardware Problems in the PS complex LINAC 2 BOOSTER PS AD Thanks to all that helped and provided information,
Overall planning, consolidation, stops, time line K. Foraz MAC – April 27th 2010 April 27th 20101K. Foraz - Machine Advisory Committee.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Industrial contributions to the maintenance of CERN.
S A Griffiths CM42 June 2015 Electrical & Control.
POPS-B Project Update 07 June 2016 POPS-B: Project update and Feedback from POPS Experience LIU-PSB Meeting June 2016 Fulvio Boattini TE/EPC 2.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire CO 2 IBL plant failures 16/06/ /06/2016 O.Crespo-Lopez.
Update on the PSB Cooling and Ventilation Systems
1 ) Infrastructure consolidation (TS/FM and TS/CE groups)
Situation of the Static Var Compensators at CERN.
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
Installations, modifications, consolidation in 2005:
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS EN-CV Planning LS (initial draft)
the CERN Electrical network protection system
EN-CV interventions during EYETS for PS and PSB
Pixel Cooling System Modifications
Alexander Herlert, CERN (PH-SME-IS)
Power cut 18kV cable for EMD404/E9 is heating
Mathew C. Wright January 26, 2009
Maintenance at ALBA facility: Strategy for the conventional services
November technical stop activities:
Aziz AMAMOU EACM – 21th May 2019
IOT operation in the SPS Long term experience TWC 800 MHz
Presentation transcript:

Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine Conclusion Gerard Cumer – Rui Nunes – Serge Deleval

Definition The presentation is based on the Major Event Reports emitted by CCC Only events which affected accelerators or experimental areas (no LHC or other users) 35 events during the run hours Rem : Time = from the stop, until the beam is back as it was before the problem. ATC/ABOC days 21, 22 and 23 January 2008

Number and category of the events ATC/ABOC days 21, 22 and 23 January 2008

CERNwide problems 3 perturbations from EDF in May Rem: For the stop no alarms and wrong state of the LEIR cooling station → new supervision ATC/ABOC days 21, 22 and 23 January 2008

Linac 2 – Leir - Booster 24 June: Booster faulty temperature sensor in the motor - Temperature probe not used anymore - Other kind of protection 20 July : Linac 2 pump stopped without any fault - Replacement of the circuit breaker - Mechanical expertise still to be done 23 July : LEIR cooling stopped because of bearing - Motor was replaced by a spare motor (+4h30) - Original motor was repaired and put back in place For Linac 2 : Black dust on the source. Filter installed. Maintenance work will be done during this shutdown. ATC/ABOC days 21, 22 and 23 January 2008

PS ATC/ABOC days 21, 22 and 23 January September : Flash on the 66kV in LHC point 6 caused by a weasel. PS affected by the perturbation. 25 October : Planned power cut for the CMS control room (bldg 354). Written authorization given by the user. 27 October : Problem with a blocked pipe in the smoke detection system. Cleaned and restarted. 7 November : Low oil level on the transformer and cold temperature outside. - Wrong alarm level priority prevented earlier intervention of standby - Round for checking oil level every winter

Isolde The increase of the radioactive gas release : – Check every device and characteristics of the ventilation system (flow, temperature, damper, filter, etc...) – Tests to understand the problem (variation of the supply and return air flow, increase of the under pressure, etc... ) – In December 2007: air flow measurement in BEAM mode – Modelisation of the tunnel and simulation for the existing situation and for several solutions ATC/ABOC days 21, 22 and 23 January 2008

1300 m 3 /h 400 m 3 /h 620 m 3 /h 65 m 3 /h With “marker” 1500 m 3 /h Total inflow : 4500 m 3 /h Air Temperature : 20 °C Magnets Temperature : 35 °C Outlet 10 m 3 /h With “marker” 540 m 3 /h Isolde ATC/ABOC days 21, 22 and 23 January 2008

AD 21 July : Stopped more than 2 days following the mechanical breakdown of the fan for the controlled leak of the target. No spare fan at CERN → 6h to get a new one. August : No stop but very severe breakdown in the cooling tower → the rest of the run done without any backup ATC/ABOC days 21, 22 and 23 January 2008

CTF3 CTF3 : 1h shortcut on electrical connection of the motor of the pump. – Cable to be changed on both pumps Rem : Filters blocked on the user equipment (MKS), still under investigation. ATC/ABOC days 21, 22 and 23 January 2008

SPS 18 events for SPS 8 May in BA6 cooling: PLC CPU out of order. Spare parts available but problem with memory card. 27 May : failure on the connection of the new cable between BE and BA4 1 and 6 June and 9 November : leaks on the user side of the “Power Supply“ circuit in BA3. 7 June : human error from a contractor 10 June : Lightning cause a compensator BEQ1 stop ATC/ABOC days 21, 22 and 23 January 2008

SPS 13, 14, 16,17 18 June stops for SPS compensator 1 Problem of temperature in the reactor – High outside temperature – No pulse – EDF voltage high (412kV) Solutions – Cleaning of the heat exchanger – Procedure (increased supervision) – New compensator for 2008, compensator 1 will be used as back-up n+1 ATC/ABOC days 21, 22 and 23 January 2008

SPS 2 July : cable fault on the SPS pulsed loop between BA6 and 7. – Loop opened for the rest of the run. Repair was not successful – New cables to be installed expected before SPS startup 3 July : connection broken on the filter H17 compensator 1 8 and 19 August : compensator 1 stopped because of unbalanced current in the by-pass resistances 15 October and 9 November : Faults on cable between BE and BA1 (SMB1) – First repair on the T – Second on the phase R – Reparation expected end of March 2008 ATC/ABOC days 21, 22 and 23 January 2008

North Area 3 November : leak on a magnet stopped the cooling for TDC2 and TCC2 17 August and 7 September : problem on the flow switch which protects the pump - threshold was changed - flow switch by-passed (risky) ATC/ABOC days 21, 22 and 23 January 2008

CNGS 12 September : AUG hit by a user by mistake From the 9 to the 20 October : problem with the control of the ventilation system. – 9/10 : 2 units stopped in TSG4 and no information on 2 other units → 1st modification : autoreset system – 12/10: 1 unit stopped and no information on 2 other units → 2 nd modification : Most important points connected by wire – 20/10: Problem appeared on units in TCV4. Not able to switch the system into access mode → CNGS stopped for 2007 →new project ATC/ABOC days 21, 22 and 23 January 2008

Conclusion SPS compensators : in 2007 no backup compensator in 2008 SVC2 and SVC3 in service, BEQ1 backup only n+1 SPS Cables : consolidation is ongoing → improvement in the future Isolde : solution implemented during this shutdown should reduce radioactive gas release CNGS : new installation adequate to the environment ATC/ABOC days 21, 22 and 23 January 2008