Friends of Squibnocket October 14, 2014 Solution Review & Update Dune Ridge/Road Solution Squibnocket Committee.

Slides:



Advertisements
Similar presentations
Subterranean Success: Geothermal Energy Powering Schools
Advertisements

Session 6 Outline Overview of program requirements. Defining your program. Program components. Overview of BMPs. Maintenance inspection. Employee education.
HOC-664 Hocking Hills Study Stakeholder Meeting August 15, 2008 Hocking Hills State Park.
RISK MANAGEMENT AND ASSESSMENTS OF NATURAL HAZARDS Ron Conner Corps of Engineers.
Challenges in Finding and Connecting New Water Sources J. Tupling, P.Eng. June 22, 2009.
LEGG PARK DOG PARK PROJECT DESIGN Prepared for: Meridian Township Parks Commission Board August 9, 2011.
1 Site Capacity and Natural Resource Protection Relationships in Subdivision Design.
Low Impact Development (LID) Ordinance Project Technical Review Teams helped develop LID manual and resolution Technical Review Teams helped.
City of Sunset Valley Drainage Master Plan Assessment Final Recommendation Report March 24, 2009.
1 What is Green Infrastructure and How Does It Reduce Wet Weather Issues? Making natural systems work for us: using soil and vegetation - rather than concrete.
Climate Change Action Plan T o w n o f Y a r m o u t h F a ll Town of Yarmouth – September 27.
PINOLE VALLEY HIGH SCHOOL FACILITIES SUBCOMMITTEE MEETING December 13, 2011.
1 TOWN OF NEWMARKET FLOODING ON SEPT. 13, 2006 Committee of the Whole February 5, 2007.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
Road to Austell … and lessons learned along the way. W. W. Hay Railroad Engineering Seminar April 27, 2007 Larry L. Etherton, P.E. Director Engineering.
STATE ROAD 100 CORRIDOR COMMUNITY REDEVELOPMENT AGENCY Bulldog Drive Improvements Right-of-Way and Design September 21, 2010 Presentation for SR 100 CRA.
Caltrans Approval Process: Update Van Ness Avenue BRT Citizens Advisory Committee September 8 th, 2009.
Wes Marshall, P.E. University of Connecticut May 2007 CE 276 Site Design Final Exam Outline.
Coastal Smart Growth s/index.htmhttp:// s/index.htm
Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda.
Introduction Transportation System Objectives : Military; Knit together the inhabitants of a territory by providing mutual access and communication; Economic.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
 WHAT THE TASK FORCE COMMITTEE DID ?  WHY DOES ANDOVER NEED A NEW TOWN YARD?  WHAT ARE THE COST IMPACTS OF NOT DOING ANYTHING?  WHAT ARE THE BENEFITS.
Thanks for Being Here THANKS FOR BEING HERE. Funding the North Topsail Beach Beach Erosion Management Program Funding Workshop Series # 3A and 3B August.
2008 COST BENEFIT ANALYSIS Town of Loxahatchee Groves.
Team Tech meeting May 22, 2006 State Traffic Commission & DEP Storm Water Permitting State Traffic Commission Permitting & Storm Water Permitting State.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Landfill. ESSENTIAL COMPONENTS 7 essential components are: (a) A liner system at the base and sides of the landfill which prevents migration.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Project Management Requirements
BPRD DISTRICT OFFICE AND RIVERBEND PARK Robin Laughlin, ALSA, RLA.
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
Municipal GIS Applications JOHN C. CHLARSON, P.E. UNIVERSITY OF TENNESSEE MUNICIPAL TECHNICAL ADVISORY SERVICE FURE.
MS4 Permitting Process William Creal Water Bureau Permits Section Chief.
Consultation on River Basin Planning Guidance Volume 2 and the updated WFD Impact Assessment Rory Wallace WFD Implementation.
PROJECT UPDATE PUBLIC OPEN HOUSE #3 OCTOBER 17 4:30 PM – 6:30 PM Dakota County Northern Service Center.
Low Impact Development (LID)
WFD National Stakeholder Forum 29 th /30 th October 2003 Building and Engineering Works Dr. Scot Mathieson Conservation Advisor SEPA.
A World of Solutions North Topsail Beach Shoreline Protection Project Phase 1 – New River Inlet Channel Realignment & Beach Restoration NC Water Resources.
00/2015 Public Information Centre Addendum to the Environmental Study Report: Millbrook Dam Tuesday, October 20, 2015.
Photo Placeholder Bloedel Donovan Park Stormwater Retrofit Alternatives and Analysis May 31 st 2013.
Consistency with the 2012 Coastal Master Plan: Guidelines for Restoration Projects Receiving State Funding Bren Haase CPRA Board Meeting September 18,
Nashville Zoo at Grassmere Stream and Water Quality Improvements Quality Improvements Littlejohn Engineering Associates, Inc. Civil & Environmental Consultants,
Agenda  Review project scope and goals  Update project status  Review results of public surveys  Identification of capital projects  Draft capital.
1 1 City Commission Workshop for the DRAFT Basis of Design Report December 14, 2015 CRAVEN THOMPSON & ASSOCIATES, INC.
Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008.
Brenda Bateman, Senior Policy Coordinator House Interim Committee on Energy & the Environment Oregon Water Supply & Conservation Initiative Update December.
Draft Recommendations from the NH Coastal Risks and Hazards Commission Sherry Godlewski Department of Environmental Services Coastal Adaptation Workgroup.
Automotion Parking Systems, LLC Innovative Parking Solutions.
CDP Application No Integral Communities 500 California Hwy 75, City of Imperial Beach CCC Hearing Item Th24b August 13, 2015.
Britannia Village Flood Control Project Report Back to RVCA Board of Directors – Dec 16, 2010 after attendance at Community Meeting of November 30, 2010.
E X P E R I E N C E Y O U R A M E R I C A Relocation of the Bodie Island U.S. Coast Guard Station Complex at Cape Hatteras National Seashore Environmental.
Parrish Design Principles A Community-Based Planning Project Sponsored by Manatee County What’s Your Opinion? Responses to October 2003 Newsletter.
Landscape Design Stakeholder Meeting Palo Alto Regional Water Quality Control Plant 1.
Know your beaches! Adjunct A/Prof Peter Waterman University of the Sunshine Coast.
Need for additional park and ride lot capacity identified Identify sites to be pursued as potential P&R locations Tier 1 – Screened parcels to select.
Carolina North Carolina North Annual Report for Chapel Hill Town Hall September 29, 2010.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
AFRICAN LOCAL GOVERNMENTS’ CLIMATE CHANGE SUMMIT- MEETING UN-Habitat & ICLEI Local Governments for Sustainability July 2009, Tshwane, South Africa.
Bancroft Elementary School School Building Committee Meeting February 24, 2010.
Chapter 13 Preparing The Systems Proposal Systems Analysis and Design Kendall and Kendall Fifth Edition.
Finance Advisory Committee – October 17, 2017
Introduction to Traffic Calming “vekehrsberuhigung”
Newbury Safety Services Facility June 2017 Public Forum
Birch bay community park
Relevant UF Advisory Committees
Map Analysis – Topic 5 Figures
Presentation transcript:

Friends of Squibnocket October 14, 2014 Solution Review & Update Dune Ridge/Road Solution Squibnocket Committee

Status Update Existing conditions defined & documented Dune ridge & road engineering completed – Geology, coastal engineering, civil engineering Initial cost estimate prepared Research on comparables completed Architectural rendering of solution in process Direct discussions with S/F team initiated Today: Parking solution presented

Features Convenient to beach 40 cars (same capacity as current lot) Storm water basin Vegetative buffer required for screening

Other Considerations Parking is a component of dune/ridge solution Town would negotiate long term leases – Two ½ ac lots Peter Weldon has reaffirmed his reaffirmed his willingness to work with the Town This is the first iteration of design of parking lot

Alternate Road (Option) At meeting with S/F engineers, alternate route for roadway was discussed – Above parking lot & along back of pond Advantages: more secure, less maintenance -50% of road unaffected for yrs. -Another 25% of road unaffected for 25 yrs. -No contention between parking area with S/F road Wetlands impact needs to be assessed