COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

What is the S-48 Corridor? Study Area What’s Happened So Far? Previous Tasks  Project InitiationJune 2005  Existing ConditionsOct  Planning.
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Bailey Hill Road Safety Coalition Report to Churchill Area Neighbors Julia Pommert and Sue Palsbo January, 2008 Contact:
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Titusville to Edgewater Bike Loop PD&E Study
Welcome to the Plumb Lane 2 nd Community Workshop November 28, 2011.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
US 52 Corridor Study Public Meeting November 15, 2010.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
S.R. 1 Intersection Improvement Project Wells County Public Library, Bluffton, IN 6:00 p.m. Presentation Thursday, April 24, 2014.
Southern Corridor Study Recommendations March 16, 2011.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
OPEN HOUSE PUBLIC MEETING FOR LA 86 & LA 320: ROUNDABOUT IBERIA PARISH State Project No. H Federal Aid Project No. H
Facilities & Campus Planning North Pleasant Street Improvement Plan Faculty Senate – February 28, 2008.
U.S. 33 Northern Connector Alternative
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
TRANSPORTATION CORRIDOR OVERLAY DISTRICT ROUTE 29.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
INTRODUCTION This chapter presents guidance on the application of geometric design criteria to facilities functionally classified as collector roads and.
Chap 4 Cross Section Elements (pp.4-1 – 4-66 ) The following topics (pages) are covered in this lecture: Pavement (p.4-1 – 4-7) Pavement (p.4-1 – 4-7)
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
Pinehurst School Traffic Safety Pinehurst School Traffic Safety Meeting January 27-28, 2015.
Third & Fourth Streets Traffic Calming Study Presentation to Transportation Commission May 14, 2015.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
U.S. 150 / S.R. 56 Roadway Rehabilitation Project Thursday, August 22, :00 p.m. Presentation Orange County Community Center Paoli, Indiana.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
East State Street (USH 12) Hanover Street to Pine Street Juneau County November 14, 2013 Public Information Meeting.
S.R. 930 and Green Street Intersection Improvement Project Tuesday, May 22, :00 p.m. Presentation Park Hill Learning Center Auditorium New Haven,
Quality Avenue “Safe Streets” Improvements City of Lakeland, Minnesota Paul Pinkston Hamline University August 18, 2015.
Community Development Department Construction Phase BULLDOG DRIVE.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
Sustainable Transportation Design Project: Proposed Changes to Belmont/Morrison Couplet By: Bryan Blanc, Marisa DeMull, Andy Kading.
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
Traffic Flow Parameters Surface Street Application.
STA Safety Project PID #76439 December 12, 2006.
April 18, 2013 Luke Lortie, EIT Jerry Auge, PE
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
City of Belmont Pavement Reconstruction Project October 15, 2014.
City of Snoqualmie Tokul Roundabout Project April 10, 2012.
Improvements to Stockton Street
District 3 Complete Streets Projects
DICKINSON AVENUE RECONSTRUCTION
Waltham Road (Andover – North Star).
COACT ODOT Update September 13, 2018.
SE 12th Street Roadway Improvements February 8, 2005.
State Aid Standards Development
S.R. 26 Road Rehabilitation in Clinton County
Walker Street Reconstruction Project 25% Design Public Hearing
Presentation transcript:

COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility

MULTIPLE FUNDING PARTNERS DOLA (Energy Impact Grant)$1,000, Southern Ute Indian Tribe (SUIT) Via Bureau of Indian Affairs (BIA) Funds $800, LA Plata County $275, Colorado Department of Transportation (CDOT) $250, Total Project Budget $2,325,000.00

EXISTING CONDITIONS  CR 517 is a two lane County Road (Rural in Character)  Tribal Route with County Maintenance  No Bike Lanes  No Sidewalks  Limited Crosswalks poorly developed  Limited Culverts & Ditches  No Signalization at State Highway 172/CR 517  Pavement is old and distressed

PROJECT PURPOSE – WHY?  IGNACIO AREA CORRIDOR ACCESS CONTROL PLAN – IACAP  Developed in 2011 between SUIT, Town of Ignacio, La Plata County and CDOT  Signalize CR 517 and State Highway 172 Intersection  Improve Public Safety along CR 517  Eliminate Driveways along CR 517 (Per IACAP)  Improve Traffic Flow with Two Way Left Turn Lane (TWLTL)  Provide Pedestrian Access - Americans with Disabilities Act (ADA)  Provide Bicycle Facilities

APPROVED ALTERNATIVE IACAP PROJECT LOCATION

IACAP APPROVED ALTERNATIVE

PROJECT PURPOSE – WHY?  Signalize CR 517 and SH 172 Intersection  IACAP RECOMMENDED  CORRIDOR PROGRESSION  LEFT TURNS  IMPROVES SAFETY CR 517 SH 172 MUSEUM SPEED TABLE ISLAND

PROJECT PURPOSE – WHY?  Improve public safety In Corridor  Narrowed travel lane Width of Feet  5-Foot Concrete Bike Lanes Provides Users Safe Separation  Create Side Friction to Reduce Speeds Without Lowering Speed Limit  Lower Speeds Reduces Accident Severity for All Users SPEED LIMIT TARGET SPEED

PROJECT PURPOSE – WHY?  Reduce the Number of unsafe Driveways along CR 517 (per IACAP)

PROJECT PURPOSE – WHY?  Improve Traffic Flow With Two Way Left Turn Lane (TWLTL)  Center Turn Lane Provides Safe Refuge for Left Turning Vehicles Reducing Rear End Accidents  Thru Vehicles are not Impeded  Refuge for Left Turn Egressing if Needed

PROJECT PURPOSE – WHY?  Provide Pedestrian Access that Complies with ADA (Americans with Disabilities Act – 1990) Requirements  Visual Impairments  Improves Mobility and Supports Healthy Living  Improves Safety for the Young and Elderly While Crossing the Street at Designated Locations

PROJECT PURPOSE – WHY?  Provide Bicycle Lanes  Provides an alternative to cars while connecting the Tribal Campus and surrounding Community

PROJECT SCOPE  Signalization of State Highway 172 and CR 517  Full Reconstruction of Roadway, Curb Gutter, Sidewalk, Bike Lanes, and Drainage Improvements  West of Mike Frost Way (AKA Emergency Access) Center Turn Lane (TWLTL Recommended)  East of Mike Frost Way – Sidewalk Only on West Side of CR 517  Shared Use Path between Utility Road and Ute Road (East Side)

SIGNALIZATION  Signalize CR 517 and State Highway 172 Intersection  Allows Vehicles to Safely Make a Left Turn Toward Town  Reduces Delay and Traffic Stacking on CR 517  Reduces Severity of Accidents  Provide Safe Refuge for Pedestrians CR 517 SH 172 MUSEUM SPEED TABLE ISLAND COLLISIONS

ALTERNATIVE 1 – NOT RECOMMENDED (TWO LANE SECTION) NO CENTER TURN LANE

ALTERNATIVE 2 - RECOMMENDED (THREE LANE SECTION -TWLTL) State Highway 172 to Mike Frost Way (AKA Emergency Access)

CENTER TURN LANE (TWLTL) State Highway 151 and Buck Highway

CORRIDOR IMPROVEMENTS SOUTHWESTERN PORTION (Tribal Campus)  Three Lane Section Is Proposed  Parking at Tribal Justice Building Shifted to North  Attached Sidewalk within Corridor  Dedicated Crosswalks  Define Access Points South Side at Mike Frost Way (AKA Emergency Access)  Provide Storm Drain System with Lateral on South Side of CR 517

CROSS SECTION – RURAL AREA ONE LANE IN EACH DIRECTION East of Mike Frost Way (AKA Emergency Access)

CORRIDOR IMPROVEMENTS CENTRAL PORTION (Piwood and Tamuche)  Provide Shared Use Path on South Side From Mike Frost Way to Ute Road  Attached sidewalk on North Side to Howe  Limited Drainage Improvements with Uniform 2% Cross Slope  Close Scott’s Pond Road  Maintain All other Existing Access Points

CORRIDOR IMPROVEMENTS NORTHERN PORTION (Howe Drive)  Close Two (2) Access Points  Dedicated Crosswalk at Howe Drive  Attached sidewalk on North side  Limited Drainage Improvements

CONSTRUCTION ACTIVITY COORDINATION AND PHASING  Close Coordination with Tribal Facilities (Do you need conduit installed for future infrastructure, or have other special considerations?)  Phasing Plan to Localize Construction Activities  Work Schedule will be in Public Media and Websites  Hotline (# TBD)  Expect Minor Delays & One-Way Traffic from time to time  Short Term Closures/Detours for Commercial/Governmental Buildings  Emergency Vehicle and Residential Access Will be MAINTAINED at all times!  Please give us your feedback!

 Design - Fall 2015/Winter 2016  2 nd Public Meeting - Mid March (TBD)  Advertisement for Construction– Spring 2016  Construction - Summer/Fall 2016 ANTICIPATED PROJECT TIMELINE (WHAT’S NEXT?)

 Please Write Them Down On Comment Sheet So We Can Track Them QUESTIONS?/COMMENTS? THANK YOU!