THEMIS-SWG 1 September 14, 2011 Status and News about the THEMIS GBOs H.U. Frey 1, and E. Donovan 1 University of California, Berkeley 2 University of.

Slides:



Advertisements
Similar presentations
The Upgraded and Expanded CARISMA Magnetometer Array: New Pi1 Substorm Science Capabilities I.J. Rae, Ian R. Mann (PI), K. Murphy, David K. Milling (PM),
Advertisements

Ground and Space-based Magnetic Fields during a THEMIS Double-onset Substorm M. Connors 1, C. T. Russell 2, I. Voronkov 1, E. Donovan 3, V. Angelopoulos.
Athabasca University Initiatives supporting THEMIS M. Connors, K. Hayashi, C. T. Russell, K. Shiokawa, R. Irwin, G. Rostoker (AU, U. Tokyo, UCLA, STELAB,
Polar – THEMIS Collaboration Opportunities Spacecraft Locations post launch Magnetopause campaign? Conjugate studies with THEMIS Ground Stations C. T.
Onsets and Flapping Studied using a Dynamic Harris Sheet Model M. Connors 1, R. Lerner 1, G. Jaugey 2, B. Lavraud 3, M. Volwerk 4, R. L. McPherron 5 1.
THEMIS Ground Magnetometers More Arrays in North America.
Overview of space-ground coordination Dec 15 (  2 mo): Apogees around 6UT (MMS 12MLT, Phase 1a / THEMIS 23MLT). Northern winter. Europe on dayside,
CASCADES-2: A View from THEMIS John Bonnell Space Sciences Laboratory UC Berkeley What can THEMIS provide? Multi-point magnetospheric observations of particles.
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 Ground Based Observatories (GBO) Engineering Peer Review Oct. 17, 2003 THEMIS ASI Array – Canadian.
Magnetometer Tutorial PowerPoint March, 2007 THEMIS: The Science Behind Magnetometer Signatures Laura Peticolas GEONS workshop.
THEMIS/GBO Engineering Peer Review CTR - 1 UCB, Oct 17, 2003 GBO/EPO Magnetometers: Overview C. T. Russell.
THEMIS/GBO CDR Peer Review 1 Univ. of Calgary, Apr , 2004 Ground Magnetometer David Pierce UCLA.
14 July 2004GridPP Collaboration BoardSlide 1 GridPP Dissemination Sarah Pearce Dissemination Officer
EMS Survey instruments The How, What and When Presented by James Tweedie, GeoMEM Ltd.
Current status of A. Matsuoka, Y. Miyoshi, I. Shinohara, T. Takashima, K. Asamura, and ERG project team ERG project ERG project Van Allen Probes SWG 2014/09.
THEMIS/GBO CDR Peer Review 1 Univ.of Calgary, Apr , 2004 Ground Based Observatories (GBO) CDR Peer Review S. B. Mende University of California -
THEMIS/GBO CDR Peer Review 1 Univ.of Calgary, Apr , 2004 GBO Deployment Plans and Status Canada Sites Mike Greffen THEMIS Canada Site Operations.
THEMIS/GBO CDR 1 UC Berkeley, June 17, 2004 Ground Based Observatories (GBO) CDR S. B. Mende University of California - Berkeley.
Canadian Report to ILWS WG William Liu Space Science Branch, Canadian Space Agency.
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 Ground Based Observatories (GBO) Program Schedule and Status Stewart Harris.
Athabasca Alberta ~0600 UT.  U. Calgary Team  NORSTAR (ASIs/MSPs/Riometers)  Data Analysis & Image Processing  Computer Visualization  THEMIS.
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the.
THEMI GBO meeting 1 UCB 06/02/2003 THEMIS Ground Based Observatories S. B. Mende.
THEMIS/GBO CDR Peer Review 1 Univ. of Calgary, Apr , 2004 Alaska Ground Based Observatories (with E/PO involvement) GBO Peer Review April 27, 2004.
Constraining Substorm Onset from Space- and Ground-Based Observations Department of Space & Climate Physics Mullard Space Science Laboratory A. P. Walsh.
Where to find LiDAR: Online Data Resources.
S. Frey et.al., THEMIS Ground-Based Observatory Analysis 1 San Francisco, Fall AGU, December 16, 2004 Analysis Used predicted THEMIS spacecraft positions.
8/6/07 THEMIS GBO 1 Ground Based Observatory Network operation and first results. Stephen B. Mende and the THEMIS GBO team UC Berkeley, U of Calgary, UCLA,
A T Y Lui, V Angelopoulos, S B Mende, O LeContel, H Frey, E Donovan, D G Sibeck, W Liu, H U Auster, X Li, M Nose, and M O Fillingim Outline  Conjunction.
GEM 2008 Summer Workshop, Zermatt, Utah, June 25, Institute of Geophysics and Planetary Physics University of California, Los Angeles THEMIS observations.
THEMIS SWT, SSL Berkeley, Dec 20, THEMIS First Tail Season: What Did We Learn? In-situ data analyst view.
THEMIS Workshop 1 UC Berkeley, 18 December 2004 Data Products and Access Tim Quinn UC Berkeley.
THEMIS PROJECT NAS UCB, June 2003 Science Operations Tim Quinn 4 June 2003.
Pearblossom Geodetic Networks EDM Network 1980 – 2001 Early 1980s; Frequent Mid 1980s to mid 1990s quarterly measurement Late 1990s to the end annual GPS.
THEMIS/GBO CDR Peer Review THEMIS – A Canadian Perspective Eric Donovan – University of Calgary April 26, 2004.
Acknowledgements This project was made possible by the UNH Project SMART and NASA under grant number NNX11AO82G. Allen, R. C., et al. (2013), JGR, submitted.
Timing of high latitude peatland initiation since the Last Glacial Maximum Pirita Oksanen, University of Bristol, School of Geographical Sciences Contact.
Athabasca Alberta ~0600 UT.  U. Calgary Team & Relevant Experience  ASI Prototype (example movies)  THEMIS-Canada Web Site  ASI Array Deployment.
THEMIS data on the web in science classrooms L. M. Peticolas and N. Craig URL: THEMIS: A Quest to Understand the Onset.
Slide 1 1 UCLA support for THEMIS August 06, 2007 Status Reports of THEMIS EPO & GBO Magnetometers Chris. T. Russell, Yasong Ge, Peter Chi, Mark Moldwin.
Relating the Equatorward Boundary of the Diffuse Redline Aurora to its Magnetospheric Counterpart Grant, Jeff 1 ; Donovan, Eric 1 ; Spanswick, Emma 1 ;
Standing Committee on Applied Science and Research: Report on Action Items from IICWG-I IICWG International Ice Charting Working Group IICWG-II, Reykjavik,
ICS VIII Banff Canada March 27-31, 2006 To be convened by Eric Donovan & John Samson Shameless focus on THEMIS! To be held at the Banff Center Webpage.
Overview of space-ground coordination Dec 15 (  2 mo): Apogees around 6UT (MMS 12MLT, Phase 1a / THEMIS 23MLT). Northern winter. Europe on dayside,
UCB 11/12/2003 E/PO-1 THEMIS/PDR THEMIS E/PO November 12, 2003 Nahide Craig Laura Peticolas.
THEMIS/GBO 1 Banff, March 29, 2006 Agenda – GBO Review.
EGU General Assembly 2006, 2-7 April, 2006, Wien ST6 Multi-point measurements of solar-terrestrial plasma: results and future perspectives Scientific objectives.
THEMIS/GBO CDR Peer Review 1 Univ. of Calgary, Apr , 2004 Ground Based Observatories (GBO) MCDR Stewart Harris.
THEMIS/GBO CDR 1 UC Berkeley, June 17, 2004 Ground Based Observatories (GBO) CDR S. B. Mende University of California - Berkeley.
Auroral signature of ground Pi 2 pulsation Toshi Nishimura (UCLA), Larry Lyons, Takashi Kikuchi, Eric Donovan, Vassilis Angelopoulos, Peter Chi and Tsutomu.
THEMIS/GBO Site Tour 1 January 2006 Ground Based Observatories (GBO) Tour of Current Sites (Jan ‘06) Stewart Harris.
THEMIS-SWG 1 September 14, 2011 Status and News about the THEMIS GBOs H.U. Frey 1, E. Donovan 2, S.B. Mende 1, E. Spanswick 2 1 SSL, University of California,
Mapping the sub-oval proton auroras into the magnetosphere A. G. Yahnin and T. A. Yahnina Polar Geophysical Institute, Apatity, Russia Plasma Physics in.
Emma Spanswick & Eric Donovan SS Injection Region Ionospheric Observations Magnetospheric Observations Physical boundaries magnetospheric models Correlation.
THEMIS/ GBO SciRR splinter 1 UCB/SSL, 06/02/2003 T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS (THEMIS) RESOLVING THE PHYSICS.
© 2013 National Ecological Observatory Network, Inc. ALL RIGHTS RESERVED. UPDATE ON THE STATE OF NEON AND THE OPERATIONS AT TOOLIK FIELD STATION Faustine.
THEMIS-ASI Report to Science Team Eric Donovan, Steve Mende, Brian Jackel, Mike Greffen, Mikko Syrjäsuo, Igor Voronkov, Harald Frey, Stu Harris, William.
THEMIS/GBO KickOff 1 UCB, June 2, 2003 Ground Based Observatories (GBO)
Canadian Magnetometry for THEMIS: CANOPUS Magnetometer Array Update Ian R. Mann, D.K. Milling, A. Kale, I.J. Rae, T.M. Loto’aniu Dept. of Physics, University.
IA-DMM Additional Evaluation Efforts. Evaluation questions focused on areas not addressed by FSU Evaluation Plan Evaluation Measures Evaluation Results.
October 8, 2009 Virginia Tech SuperDARN HF radar group Relocated from JHU/APL to VT in 2008 Senior Staff: Mike Ruohoniemi Jo Baker Ray Greenwald.
 Morphology and Dynamics of Auroral Arcs By Sarah Bender Mentor: Kyle Murphy 8/7/2014.
Canadian Ground-Based Optical Programs
Management Council Meeting, UCLA November 2012
RISR-C incoherent scatter radar operations
THEMIS GBO/ASI Minor intensification GBAY 01:48:42 KUUJ 01:48:51
Analysis of Substorms during the Second THEMIS Tail Season
Specifications What should it cover Goods Services Warranty
Determination of the Substorm Initiation Region From a Major Conjunction Interval of THEMIS Satellites A T Y Lui, V Angelopoulos, S B Mende, O LeContel,
Presentation transcript:

THEMIS-SWG 1 September 14, 2011 Status and News about the THEMIS GBOs H.U. Frey 1, and E. Donovan 1 University of California, Berkeley 2 University of Calgary Canada: Eric Alaska/Greenland: Harald

THEMIS-SWG 2 September 14, 2011 Data Status Magnetometer CDF up to date All-sky image CDF complete until April 2011 All-sky image PGM complete untilApril 2011 Skymaps for the 2011/12 season will be available October

THEMIS-SWG 3 September 14, 2011 GBO* Site and Instrument Status KIAN: Operating nominally MCGR: Operating nominally FYKN: Powered off, start predicted early October GAKO: Operating nominally NRSQ: All-sky operating, magnetometer data up to May Alaska Greenland *Note this does not include EPO Mags

THEMIS-SWG 4 September 14, 2011 ATHA: Operating nominally CHBG: Not Imaging (small PC failure), projected to be operational in early October FSIM: Operating nominally FSMI: Operating nominally GBAY: Not Imaging (PC offline, unknown), awaiting custodian intervention GILL: Not Imaging (Serial Switch compromised), site visit scheduled September INUV: Operating nominally KAPU: Operating nominally KUUJ: Operating nominally PINA: Not Imaging (ASI Fault), site visit scheduled for end of September RANK: Operating nominally SNAP: ASI Operating nominally, GMAG disconnected (oper. late Sept) SNKQ: Operating nominally TALO: Operating nominally TPAS: Operating nominally WHIT: Operating nominally Canada Canadian instrument, site, and data work will continue as is (CSA funding to UofC) for at least 2.5 more years.

THEMIS-SWG 5 September 14, 2011 Alaska/Greenland GBO funding Starting September 1, 2011 NSF agreed to fund operation of the Alaska/Greenland GBO for the next 5 years under the name: Ground-based Imager and Magnetometer Network for Auroral Studies (GIMNAST) UCB-SSL receives funding for site operations, data collection and recovery, maintenance and repairs UCLA receives funding for magnetometer maintenance and potential repairs Use of Alaska/Greenland GBO data collected after September 2011 should be acknowledged to NSF award

THEMIS-SWG 6 September 14, 2011 New software tools thm_gmag_stations provides information about GMAG similar to thm_asi_stations map_themis_state_t96 and map_themis_state_south_t96 to map THEMIS spacecraft to northern and southern hemispheres thm_asi_merge_mosaic to merge all-sky images and make mosaic look “nicer”

THEMIS-SWG 7 September 14, 2011 thm_asi_merge_mosaic.pro Rae et al., JGR 114, 2008JA013771, 2009 Kasahara et al., Ann. Geophys., 27, 3825, 2009

THEMIS-SWG 8 September 14, 2011 Frey et al., JGR, 115, 2010JA015537, 2010 Nishimura et al., JGR, 2009JA015166, 2010 thm_asi_merge_mosaic.pro (2)

THEMIS-SWG 9 September 14, 2011 RISR-N (SRI) RISR-C (UofC) Mike Greffen