To TT10 Nitrogen or helium gas LN2 Storage vessel buffer storage vessel 1 2 3 4 G1G2 Magnet cryostat VALVE BOX Schematic diagram of the cryogenic system.

Slides:



Advertisements
Similar presentations
CM-22 Magnet Issues, 6 June MICE Magnet Cool Down and Other Issues Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
Advertisements

MERIT Review Meeting: Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug CERN Cryogenics for Experiments Accelerator Technology Department Presented by Adrian.
1 Status of Hydrogen System Development MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov, Tom Bradshaw, Elwyn Baynham, Mike Courthold,
Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.
2.April 2004A.Fabich, H.Kirk Summary for proposal of TT2A target test H.Kirk, A.Fabich March 2004 week 9 morning: Cryogenics,
1 New baseline for the magnet cooling system Yury Ivanyushenkov Engineering and Instrumentation Department, Rutherford Appleton Laboratory.
Videoconference, 3rd May 2005A.Fabich, CERN1 Nitrogen release from the TT2A cryogenic solenoid systems A.Fabich CERN AB-ATB, Switzerland Videoconference,
1 Technical Arguments in Favor of using the Cryomech PT-415 Cooler for Cooling the LH 2 Experiment Michael A. Green Lawrence Berkeley Laboratory Berkeley.
Mucool cryo-design Christine Darve Fermilab/Beams Division/ Cryogenic Department 8/12/02.
MICE Hydrogen System Design Tom Bradshaw Iouri Ivaniouchenkov Elwyn Baynham Columbia Meeting June 2003.
MICE Collaboration Meeting CM-151 Is the the pulse tube cooler a must or is it simply better for the MICE AFC module? Michael A. Green Lawrence Berkeley.
MICE hydrogen review Summary of system hardware. System function To provide 22 litres of liquid hydrogen for use as a muon absorber within a superconducting.
Current status Arkadiy Klebaner November 21, 2012
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
NCSX NCSX CDR May 21-23, 2002 Larry Dudek Slide 1 Facility Systems (WBS 62-65) L. Dudek, G. Gettelfinger, M. Kalish.
CRYOGENICS AND POWERING
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
LARP LQX and MQX Magnets Cryogenic Testing at Fermilab’s Industrial Building 1 Roger Rabehl Technical Division/Test & Instrumentation Department.
SOFT 2004 OVERVIEW OF CRYOGENIC TECHNOLOGY FOR THE THERMONUCLEAR FUSION P. DAUGUET, M. BONNETON, P. BRIEND, F. DELCAYRE, B. HILBERT, A. RAVEX Air Liquide.
SCU Layout Concept - Minimal Segmentation Joel Fuerst (ANL) SCU 3-Lab Review Meeting Dec. 16, 2014.
CRYOGENICS FOR MLC Cryogenic Cooldown Scheme Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
Turn Liquid Nitrogen tank vent towards the wall Dewar vented into Custodian’s ear as they walked into a lab To prevent injuries, turn Vent and Relief Valves.
Precipitation Type: __________________ Amount: ________________ Name_________________ Date__________ Temperature High: __________________ Low: ________________.
Exhaust to atmosphere G1 V1 V2 V3 LN2 Storage Vessel 150 l Dewar Cryostat Exhaust to atmosphere Nitrogen or helium gas bottle LN2 Circuit for MIT Test,
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
L. Serio COPING WITH TRANSIENTS L. SERIO CERN, Geneva (Switzerland)
TT2A Mercury Jet Experiment The Cryogenic System Roger Bennett and Yury Ivanyushenkov CCLRC, Rutherford Appleton laboratory, Chilto, Didcot, Oxon, OX11.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Subjects for SC FF magnet system at ATF2 Infrastructures at ATF2? How supply cryogen at ATF2 (set up cryogenic system?) (Gas helium recovery line?) Set.
Shrikant_Pattalwar TTC 2015 Dec 1, 2015 SLAC 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Restoring Komag Yasuhiro Makida Consideration of restoring and modifying Komag for a stand alone operation without the refrigerator. Contents 1.Magnet.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
RESEARCH AND DEVELOPMENT FOR FUTURE LHC SUPERCONDUCTING MAGNETS POINT SUR LA STATION D’ESSAIS préparé par Jean-Marc Gheller Steering committee –September.
Manoj Kumar, B. N. Duttagupta, Rajvir Singh Doohan, S. K. Joshi, A. K. Sagar, L. Chowdhary, Rekhya Naika, Prabhat Kumar Gupta, Vivek Nema, Hemant Kumar.
Shrikant_Pattalwar ICEC 26, March 7-11, 2016, Delhi 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
1 Our goals for today’s meeting  Confirm FNAL role –a complete review of all cryogenics and gas handling –  We would like an above ground review only.
AT-ECR/C.FabreMay 31, 2007 Cryogenics for Liquid Argon Calorimeters Caroline Fabre on behalf of the ATLAS Liquid Argon Cryogenics Collaboration.
Overview of the ESS Linac Cryogenic Distribution System
Makara, Aug. 17, Cryo Dept. Shutdown Status.
1 Young-Ju Lee Vacuum & Cryogenic Engineering Team National Fusion Research Institute Young-Ju Lee Vacuum & Cryogenic Engineering Team National Fusion.
Teleconf ACS – FREIA 28th March 2017
Installation of the T600 at Fermilab
Magnet cryogenic system update.
Cryogenic behavior of the cryogenic system
HFM Test Station Main Cryostat
Proximity Cryogenics P&IDs meeting
LARP Vertical Test Facility
Horizontal Tests in a Vertical Cryostat
LN2 Circuit for MIT Test, September 2005
Mathew C. Wright October 2016
SHMS Cryogenics and Q2(Q3Dipole) Cool Down
FRESCA Cryostats Outer cryostat during pressure test at the manufacturer Top plate and lambda plate for the outer cryostat Inner cryostat during reception.
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
A Complete System for Operation of a Superconducting Magnet*
Schematic diagram of the cryogenic system
Discussion on MERIT Cryogenics Specifications
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
Burst Disc Experiences at CEA Test Stand
Presentation transcript:

to TT10 Nitrogen or helium gas LN2 Storage vessel buffer storage vessel G1G2 Magnet cryostat VALVE BOX Schematic diagram of the cryogenic system

System Operation OperationValve 1 Valve 2 Valve 3 Valve 4 Valve 5 Valve G1 Valve G2 Fill (cool) Cryostat from Buffer Vessel ClosedOpen ClosedOpen Closed Fill Cryostat from LN2 Storage Vessel OpenClosedOpen Closed Empty Cryostat ClosedOpenClosedOpen ClosedOpen Pre-cool Buffer Vessel or bypass Cryostat Open ClosedOpenClosed

to TT10 nitrogen or helium gas LN2 Storage vessel buffer storage vessel, 150 l G1G2 Magnet cryostat, 100 l VALVE BOX nToF11 SCHEMATIC DIAGRAM OF THE CRYOGENIC SYSTEM All valves and junctions are in the valve box All valves are remotely operable in TT2 Valve 1 is a proportional valve Safety pressure relief valves are not show Demountable joints LN2 lines Cold nitrogen gas lines Warm nitrogen gas line GROUND LEVEL TUNNEL TT2A heat exchanger TUNNEL TT2 5