AVAILABLE Will Build to Suit Could the University of Minnesota do this? –Alternate to Line Item or to a DOE grant? Email from Marvin Marshak (in the Middle.

Slides:



Advertisements
Similar presentations
Math for Liberal Studies. There is a list of numbers called weights These numbers represent objects that need to be packed into bins with a particular.
Advertisements

ECE 4334: Capstone Design Fall 2009 Welcome ! Facilitator: Dr. Len Trombetta.
Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
Mu2e WGM 4/21/2010 R. Ray Mu2e Project manager. Project Team We have a L2 manager for the tracker!  Aseet Mukherjee has assumed this role  Experience.
MINERvA Module Assembly Prototyping Report Jaewon Park University of Rochester MINERvA Collaboration Meeting, July 29-30, 2005.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
ELM4701/02: ELM Projects I & II The mini-project has served as a practice project. It has given us the opportunity to explain our expectations and you.
F Axis Off Axis Introduction Off-Axis Cambridge Meeting 12 January 2004 Gary Feldman.
Doug Michael Jan. 12, First goal is to be ready to select an optimal technology in ~one year. –Demonstrate that fundamental technologies are ready.
OFFICE OF SCIENCE Review of Critical Decision 2 for the Large Liquid Argon Detector for Neutron Physics (MicroBooNE) at Fermi National Accelerator Laboratory.
NuMI Offaxis Costs and Whither Next Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
SBS Program Management John J. LeRose SBS Collaboration Meeting October 18,
WIKI IN EDUCATION Giti Javidi. W HAT IS WIKI ? A Wiki can be thought of as a combination of a Web site and a Word document. At its simplest, it can be.
Grant Maintenance Title I Technical Assistance & Networking Session October 6, 2011.
The NOvA Experiment At Fermilab Mark Messier Indiana University 34th International Conference on High Energy Physics (ICHEP’08) Philadelphia, PA July 30,
David Finley / LArTPC Group Meeting / June 13, Fermilab Slide 1 LArTPC Detector Costs Context History Next (perhaps) steps.
NoVA FNAL Engineering Needs 9 February 2009 Dave Pushka.
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
Status of the PSD (Jan. 2009) F.Guber, INR, Moscow.
Cost for Large Liquid Scintillator Detector Ken Heller University of Minnesota Active Detector – Liquid Scintillator Target Material - Water Read Out –
Monitoring of FHEP Teacher Research Internship Fermilab – Summer 2011.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
NOvA Project Status April 3, 2007 John Cooper Ron Ray Nancy Grossman.
1 BTeV Status  Collaboration Status New Groups  University of Iowa - C. Newsom (Pixels)  Institute of High Energy Physics (IHEP - Protvino) - A. Derevschikov,
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Extrusion Modules – The Active Detector Ken Heller University of Minnesota Talks by: Tom Chase – Progress on End Seals and Leak Detection QA Alex Smith.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
Lab-Wide Earned Value Management System Project Core Team Kickoff Meeting April 16, 2008 Dean A. Hoffer.
NO A Project Status John Cooper & Ron Ray October 18, 2006.
SBS Management John J. LeRose Project Manager. Good News/ Bad News We are an official DOE program (project(s), whatever…) – Good because we are more likely.
Linear collider muon detector: Marcello Piccolo Amsterdam, April 2003.
1 "On PD-->SNuMI-->PP2-->NoVA transition" {VS} Bob Zwaska Accelerator Physics Department Meeting Jan. 10, 2007 ≠
Harry Carter – T4CM Meeting 7/13-14/2006 Type IV Cryomodule (T4CM) Design Meeting #2 H. Carter Fermilab Technical Division.
Fire And Motion Jessica Horne. Not in the Zone Last day or two Sometimes weeks Mood swings correlate with unproductive periods Average enough lines of.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
F Axis NO A Status NO A Collaboration Meeting Fermilab 17 November 2006 Gary Feldman.
M. Bonesini - MICE Inst Meeting M. Bonesini INFN Milano TOF installation plans.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May review Near Detector Electronics production.
Unit 3 Guidelines to change our self image CM206.
DoE Review June 6, 2000 Cost Estimate  New Cost Estimate u Manpower Costs (Op. SWF) u Equipment Costs (Eq. M&S) u Contingency  Conclusions Mike Tuts.
CITING AND REFERENCING TUTORIAL PREPARED BY TIM McLERNON June 2004.
DZero Run IIb Rev Nov 05 ‘03 1 Kotcher Agenda (from Rebaselining Review)  Introduction (Kotcher – 10’)  Trigger & DAQ/Online (Wood – 30’) u AFE II/TriP.
Off-Axis Collaboration Meeting Feb 7, 2004 Richard Talaga, Argonne (Liquid) Scintillator Structure Workshop Report Workshop Purpose –To review the current.
1 draft NO A WBS J. Cooper NO A Working Group Meeting June 29,2005 Work is the effort of Ron, Dave, Bill, Suzanne, Harry, not just me.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
MICE Funding Update (U.S.) Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory CMPB Meeting August 1, 2007.
E. W. Grashorn and A. Habig, UMD, for the MINOS Collaboration The Detectors of The Main Injector Neutrino Oscillation Search (MINOS) Experiment The MINOS.
Harvard Neutrino Group DoE Review August 21, 2006.
NOvA Project Status February 6, 2007 John Cooper Ron Ray Nancy Grossman.
NuMI Horn Alignment Cross-hair System NuMI Horn Alignment Cross-hairs Target Hall Instrumentation Review November 18, 2002 David Ayres Argonne National.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
1 Costs to Completion Common funds &Running Costs Support for Running OPERA Funding Issues L. Votano Resource Coordinator OPERA Funding Agencies meeting.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
Nomination Committee Report Jane Lehr, Chair November 6, 2010.
NuMI Detector NIM Paper Draft MINOS Detectors NIM Paper Status and Job List for this Meeting Dave Ayres & Alec Habig Argonne & Minnesota – Duluth MINOS.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
Status of the NOνA Experiment Satish Desai - University of Minnesota For the NOνA Collaboration APS Meeting - April 2013 Denver, Colorado.
Fernanda G. Garcia, Steve Dixon, Andy Stefanik, Justin Tillman, John Voirin SBN Far Detector Installation & Integration.
Project Overview James Fast Pacific Northwest National Laboratory.
FRA Earned Value Management System Implementation Project October 9, 2008 Dean Hoffer / Elaine McCluskey.
Heritage Trust Fund Grant Orientation Session. HTF Staff and Contact Information Katrina Ringler Grants Manager ext. 215
1 FVTX Quarterly/Monthly Report July 2008 Melynda Brooks, Dave Lee.
MUSE NSF Review March 24, MUSE Project Management Ronald Ransome Rutgers The State University of New Jersey For the MUSE Collaboration.
The Argonne Neutrino Group Collaboration with Chicago and Fermilab (From the ANL perspective) Maury Goodman 2 February 2009.
Presentation transcript:

AVAILABLE Will Build to Suit Could the University of Minnesota do this? –Alternate to Line Item or to a DOE grant? from Marvin Marshak (in the Middle East until Aug 11) With respect to your question about NOvA, I have thought about some lease back arrangement. The new University VP for Research Tim Mulcahy was previously at UW Madison. He told Earl and me that UW floated Francis Halzen to a maximum of $25 million for ICECUBE and I believe he is expecting some sort of float request with respect to NOvA. The useful amounts are big enough that this needs to be a well-structured deal with real guarantees for the University before it goes tens of millions in the hole. University President Bob Bruininks and his wife Susan Hagstrum are visiting Soudan on Aug. 16 for lunch. It would be good to have a general idea of what we might need to discuss it with him then. Thanks, Marvin

Work Breakdown Structure 1.1 Conventional Construction 1.2 Liquid Scintillator 1.3 WLS Fiber 1.4 PVC Extrusions 1.5 PVC Modules 1.6 Front-End Electronics 1.7 Trigger/DAQ 1.8 Final Assembly 1.9 Project Management Major Material Procurements 1 Construction Project 1. Construction2. R&D Changes since the July 18 review- Eliminated “Nova Detector” box at Level 2 Elevated PVC Modules, FE Electronics, Trigger/DAQ, and Final Assembly to Level 2 with Near/Far split beneath each.

NO A Organization Breakdown Structure NOvA Project John Cooper Project Manager Ron Ray Deputy Manager Dave Pushka Project Engineer, Mechanical John Oliver Project Engineer, Electronics (Harvard) Suzanne Pasek Budget Officer Bill Freeman Project Scheduler Harry Ferguson Documentation & Schedule Conventional Construction Steve Dixon (Fermilab FESS) Scintillator Stuart Mufson ( Indiana) Wavelength Shifting Fiber Carl Bromberg (Michigan St) PVC Extrusions Rich Talaga (ANL) PVC Modules Ken Heller (Minnesota) Electronics, Trigger, DAQ Leon Mualem (Minnesota) 1.6 & & 2.7 Detector Assembly Dave Ayres (ANL) Project Management John Cooper Note they do 1. and 2.

Ron Ray has cloned a 1 st draft NO A PMP from the BTeV PMP WBS Level 2 descriptions

Next steps The full set of L2 managers met this morning Approximately = “NO A Technical Committee” I’ve asked the 7 Level 2 managers to examine the existing L3 tasks, change, add, fix,... –AND write the L3 descriptions –by August 19 (at least two have already done a 1 st pass) The Technical Committee will meet again during the week of Aug 22 to discuss L3 tasks and descriptions Then we have a NO A Collaboration meeting on August Level 2 managers will present the structure and status of R&D try to recruit more help at L3