Monitoring the Long-Term Effectiveness of Integrated Safety Management System (ISMS) Implementation Through Use of a Performance Dash Board Process Mike.

Slides:



Advertisements
Similar presentations
Reliability Center Data Request Task Force Report WECC Board Meeting April 2009.
Advertisements

Contract and Project Management: A Field Perspective Moderator Michael Peek, PE CCE CFM Office of Engineering and Construction Management.
Quality Assurance Update Presented byRay Hardwick Presented by: Ray Hardwick.
ORDER ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP OVERVIEW OF DOE POLICY -- USE OF INSTITUTIONAL CONTROLS COLLEEN OSTROWSKI (202)
Environmental Management Systems An Overview With Practical Applications.
IT Governance and Management
1 NOTES This presentation is an outline of some of the most important aspects of DOE O 440.1B For completeness, copies of the Order should accompany this.
ECM Project Roles and Responsibilities
Responsible CarE® Employee health and Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Departmental Initiative to Enhance Activity-level Work Planning and Control DOE and DOE Contractors Industrial Hygiene Meeting in Conjunction with the.
Readiness Index – Is your application ready for Production? Jeff Tatelman SQuAD October 2008.
Comprehensive Guidance and Counseling
Capability Maturity Model
Session No. 3 ICAO Safety Management Standards ICAO SMS Framework
1 Issues Management at the Hanford Nuclear Reservation Tank Farms September 13, 2004.
ISM Workshop 1 Independent Oversight Perspectives Michael A. Kilpatrick Deputy Director Office of Security and Safety Performance Assurance.
Basics of OHSAS Occupational Health & Safety Management System
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
N By: Md Rezaul Huda Reza n
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
1 DoD-VA Partnership Status 22 February DoD/VA Partnership DoD/VA Mission, Vision, Authority DoD/VA Council Structure Joint Strategic Plan Current.
Senior Regulators Meeting The future of the IRRS Programme: Enhancing the Effectiveness of the Regulatory Body Ramzi Jammal, Executive Vice-President and.
NIST Special Publication Revision 1
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
ISMS Best Practices Workshop Initial Steps to Integrate HPI into ISMS Continuous Improvement CH2M HILL Hanford Group, Inc. September 12-13, 2006.
Software Engineering Lecture # 17
SESSION B TOPIC SUMMARY DOE SAFETY MANAGEMENT & OVERSIGHT ISM Workshop Denver – September 2006.
PERT Overview Federal Perspective Annual PERT Workshop February 7-9, 2012 Nevada Site Office Evelyn Landini, Contracting Officer Brookhaven Site Office.
Georgia Institute of Technology CS 4320 Fall 2003.
Use of ES&H Inspections to Develop Performance-Based Leading Indicators and Avoid the “Safety Cop” Mentality Mike D. Kinney, CPF, CSP National Security.
Geoffrey L. Beausoleil Assistant Manager, Office of Operational Support DOE Idaho Operations Office September 12, 2006 Presentation to DOE ISM Champions.
Departmental Initiative to Enhance Activity-level Work Planning and Control DOE and DOE Contractors Industrial Hygiene Meeting in Conjunction with the.
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
DOE Order 413.3A Program and Project Management for the Acquisition of Capital Assets Catherine Santana Deputy Director, Project Management Systems, OECM.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Colette Broussard, DOE-HQ Office of Quality Assurance Policy.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Facility Evaluation Board Steve Johnson, Manager Operations Evaluation Department.
Measuring and Monitoring ISM System Improvements ISM Champions Meeting April 24-27, 2006 Michael Weis and Dae Chung U.S. Department of Energy.
Responsible Care® Health & Safety Task Force – 06 H&S.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Work Planning and Control Tim Flake, Principle Technical Advisor Maintenance.
Integrating EM QA Performance Metrics with Performance Analysis Processes August 26, 2009 Robert Hinds, Manager, Quality Assurance Engineering & Greg Peterson,
DOE ASSET MANAGEMENT PLAN
HSS Inspection of Environment, Safety, and Health Programs at BNL Accelerator Safety Workshop E. Lessard Collider-Accelerator Department August 12-14,
ISO Current status of development ​ ​ ISO development process ​1​1.
Unit-5 Introduction to IS/ISO 9004:2000 – quality management systems – guidelines for performance improvements. Presented by N.Vigneshwari.
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
Independent Oversight Status Report on Workplace Exposure Monitoring ISM Workshop 2007.
PRESENTED TO: ENERGY FACILITY CONTRACTORS GROUP SAFETY ANALYSIS WORKING GROUP SAFETY ANALYSIS WORKSHOP BY: CHRIS CHAVES NSR&D PROGRAM OFFICE OF NUCLEAR.
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Sonya Barnette, DOE-HQ Office of Quality Assurance Policy and.
1 City of Shelby Environmental Management System -QUALITY ALWAYS- IT’S ABOUT THE PEOPLE Presented by: Cynthia I.Walters Presented by: Cynthia I.Walters.
Environmental Management Division 1 NASA EMS Building Blocks to Success Michael DeWit, QEP EMS Lead ICF Consulting Inc. Fairfax, VA Michael J. Green, PE.
ORDER ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP OVERVIEW OF ORDER Larry Stirling
OSHA Safety and Health Program Management Guidelines
Blaenau Gwent County Borough Council Social Services CSSIW Performance Evaluation Report 2014–15.
Click to edit Master title 1 1 Raymond W. Blowitski, Office of Analysis, HS-32 Phone: (301) Strategy for Implementing DOE O 210.2, DOE Corporate.
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
Managing Multiple Projects Steve Westerman California Department of Motor Vehicles Steve Young Mathtech, Inc.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
DoD Lead Agent: Office of the Assistant Secretary of the Army (Installations and Environment) Department of Defense Voluntary Protection Programs Center.
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
EFCOG Safety Working Group (SWG) Status June 7, 2016 EFCOG Working Group Coordination Meeting Washington, DC John McDonald, SWG Chair.
1 The Department of Energy And Electronics Stewardship : How DOE Attained “Green Status” on the OMB Environmental Scorecard Federal Environmental Symposium.
1 Getting to Green at the Department of Energy Progress on OMB’s Environmental Sustainability Scorecard Andy Lawrence Director, Office of Nuclear Safety,
DOE Nuclear Safety Research and Development Program
The Federal Oversight and Contractor Assurance System Directives Safety Culture Improvement Panel Meeting September 7, 2016 Patricia.
Monitoring and Evaluation using the
Trending Requirements and Results
Presentation transcript:

Monitoring the Long-Term Effectiveness of Integrated Safety Management System (ISMS) Implementation Through Use of a Performance Dash Board Process Mike D. Kinney, CPF, CSP National Security Technologies, LLC ISM Best Practices Workshop September 12, 2006

Getting Started Good news! Opportunity to win free “stuff ” [OK, OK, beads] After receiving initial approval of their ISMS programs, some contractors have lacked an effective method to monitor long-term effectiveness of their ISMS program DEAR Clause 48 CFR , “Integration of Environment, Safety and Health into Work Planning and Execution”, requires the overall integrity of the contractor ISMS program to be maintained

Background DOE has issued guidance to support annual contractor reviews DOE G B, “Integrated Safety Management System Guide for use with Safety Management System Policies (DOE P 450.4, DOE P 450.5, and DOE 450.6); The Functions, Responsibilities and Authorities Manual; and the Department of Energy Acquisition Regulation” Contains Continuing Core Expectations (CCEs) to guide ISMS long-term effectiveness reviews

Background The Nevada Site Office (NSO) issued a local Directive addressing long-term ISMS maintenance NV O 450.4, “Safety Management System Maintenance” In January of 2006, The Defense Nuclear Facilities Safety Board (DNFSB) has issued a technical report that examines current implementation of ISMS at DP sites DNFSB/TECH-36, “Integrated Safety Management: The Foundation For a Successful Safety Culture”

Challenges In some instances, DOE/NNSA contractors do not have a consistent method to effectively review long-term implementation of their ISMS program Some contractors attempt to rely on traditional inspections or assessments in lieu of a more programmatic approach Results don’t always accurately reflect actual level of implementation

Challenges (continued) Comparison of performance with previous evaluations (e.g., trending) can also prove difficult This series of collective challenges do not support being able to demonstrate to DOE/NNSA/DNFSB that ISMS is being effectively maintained Lack of a clear method to monitor long-term implementation of ISMS can also lead to reduced buy-in at the task level as well as lack of commitment from senior management

Method To assist with meeting Headquarters and Local Site Office commitments regarding ISMS long-term maintenance, NSO established an Integrated Safety Management Council (ISMC): Includes Contractors, User Organizations, and Federal staff Co-chaired by NSO and User Organization representatives Monthly meetings are utilized to address new initiatives or programmatic challenges Coordinates performance of annual ISMS reviews

Method To assist with the ISMS annual review, the NSO ISMC established a performance dash board process: Utilizes Continuing Core Expectations (CCE) contained in DOE G B Performance dash board also contains individual evaluation criteria for each CCE Completed performance dash board identifies current implementation status for each participating organization

CCECategoryCCECategory 1Annual ISMS updates7Review and update of List A/List B 2ISMS effectiveness (POCs)8Contractor and DOE assessments 3ISMS implementation at the work level9Improving ISMS 4 Roles and responsibilities, management responsibility for safety 10Approval of work by DOE 5Balancing of priorities11 DOE review of hazard analysis and feedback processes 6Feedback and improvement processes DOE Continuing Core Expectations (CCEs)

ISMS/CCE Performance Dash Board Appropriate worker involvement is a priority. Work is accomplished within controls. Work is properly authorized. Controls are developed and implemented. Work is defined, hazards are identified, and actions to prevent or eliminate the hazards are taken. DOEContractor C Contractor B Contractor A CCE -3: Work activities reflect effective implementation of the functions of ISMS.

Method NSO ISMC Performance Dash Board: Contains color gradients, passed on the following rankings: Blue: Significantly exceeds expectations Green: Meets expectations Yellow: Expectations not fully implemented Red: Limited implementation of expectations, management attention required

ISMS/CCE Performance Dash Board Appropriate worker involvement is a priority. Work is accomplished within controls. Work is properly authorized. Controls are developed and implemented. Work is defined, hazards are identified, and actions to prevent or eliminate the hazards are taken. DOEContractor C Contractor B Contractor A CCE -3: Work activities reflect effective implementation of the functions of ISMS.

ISMS/CCE Performance Dash Board Analysis Contractors A & C may chose to examine other contractors processes for authorization of work and worker involvement Contractor B may be able to assist other contractors regarding methods to enhance identification and control of hazards

Method In addition to identifying implementation for CCE criteria, implementation to the CCE title level is also identified To assist with tracking trending and support evaluation results, performance is compared with pervious years Five year base line Performance “arrows” utilized to identity annual performance for given color gradient/CCE title Annual results, including potential site wide challenges, are identified in collaborative manner with ISMC members

ISMS/CCE Performance Dash Board Analysis System Performance Indicator Key: Improving ▲; No Change ◄►; Declining ▼ Discussion: Processes for identification of hazards and controls (including selection of standards) have begun to improve. Y, ▲ Y, ▼ FY06FY05FY04FY03FY02 Y, ◄►

ISMS/CCE Performance Dash Board Analysis Implementation of the CCE title level also supports identification of programmatic challenges Conveys management level information in a timely manner while readily focusing attention of potential challenges

Conclusions Use of a DOE ISMS CCE Performance Dash Board has proven to provide the following benefits: Enhanced visibility of ISMS implementing processes Open communication of potential challenges as well as successes Ability to track and trend performance Enhanced participation throughout Contractor, User Organizations, and Federal personnel

Conclusions (continued) Other benefits from application of this process include: Continued support from ISMC participating organizations Value added method to address contractual requirements Ongoing support from management Perhaps most importantly, use of a DOE ISMS CCE Performance Dash Board is ensuring that the importance of ISMS implementation remains on the forefront versus being viewed as just another regulatory requirement