1 Cross-Cutting Analytical Assumptions for the 6 th Power Plan July 1, 2008.

Slides:



Advertisements
Similar presentations
California Energy Commission Retail Electric Rate Scenarios: Key Drivers and Structure 2015 Integrated Energy Policy Report California Energy Commission.
Advertisements

2013 Electric Rate Increases December 10, Electric Rate Comparison – Residential Highest charge Kelowna and FortisBC Lowest BC Hydro and Nelson.
3/16/20001 BPA’s traditional revenue stream varies with water supply (higher water conditions, higher revenues) BPA’s revenues from Slice are independent.
TARIFF REGULATION IN THE NIGERIAN ELECTRICITY SUPPLY INDUSTRY
Economics of Timber Production on Private Land in Indiana.
Capital Investment Choice Chapter 5
1 Chapter 6: Capital Budgeting: The Basics Copyright © Prentice Hall Inc Author: Nick Bagley Objective Explain Capital Budgeting Develop Criteria.
Renewable Net Short.
California Energy Commission Draft Rate Scenario Model Methodology DAWG Forecasting Subgroup Sept. 11, 2014 Lynn Marshall Supply Analysis.
California Energy Commission Retail Electric Rate Projections: Preliminary Cases 2015 Integrated Energy Policy Report California Energy Commission July.
Review of 7th Plan Inputs by RTF August 11, 2014.
1 Overview of Allocating Revenue Requirements Based on Shares of Marginal Costs May, 2012.
1 Energy Company Valuations “It’s all in there!” Georgia State Economic Forecasting Conference May 25, 2005 Richard T. O’Brien Executive Vice President.
Marginal Distribution System (and Transmission System) Losses Regional Technical Forum August 5, 2008.
2014 Budget Department Presentations Infrastructure Funding Options.
Introduction to Bonneville Power Administration
Rooftop Solar Photovoltaic Seventh Plan Approach to Analysis CRAC November 13, 2014.
Northwest Power Planning Council Model Conservation Standards DRAFT Economic Analysis for for New Residential Construction.
SAN MATEO COUNTY CCA TECHNICAL STUDY: OVERVIEW Community Choice Energy Advisory Committee June 25 th,2015.
Northwest Power and Conservation Council 6 th Plan Conservation Resource Supply Curve Workshop on Data & Assumption Overview of Council Resource Analysis.
Example of Revenue Decoupling Utah Committee of Consumer Services Witness: David Dismukes Docket No T01 CCS Exhibit 1.1 Allowed Revenue per Customer.
Chapter 12 The Cost of Capital Topics  Thinking through Frankenstein Co.’s cost of capital  Weighted Average Cost of Capital: WACC  Measuring Capital.
Draft Avoided Cost Forecast and Marginal CO 2 Offset Value of Conservation Regional Technical Forum Maury Galbraith Northwest Power and Conservation Council.
Avoided Costs of Generation
Northwest Power and Conservation Council Regional Conservation Update: News From the Front January 24, 2007 Tom Eckman Northwest Power and Conservation.
Technical Conference on Net Metering Load Research Study November 5, 2014.
Network Customer Meeting Access Metric Update November 16, 2006.
Why is WPL filing a rate case?  Last Base Case Rates were set January, 2007  Cost of our utility investments must be reflected in prices our customers.
Northwest Power and Conservation Council Slide 1 Direct Use of Natural Gas Economic Fuel Choices from the Regional Power System and Consumer’s Perspective.
Highlights of AESC 2011 Report Vermont Presentation August 22, | ©2011 Synapse Energy Economics Inc. All rights reserved.
Chapter McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Cost of Capital 11.
Development and Deployment of A Standardized Savings and Economic Valuation System for Tracking Conservation Resource Acquisitions in the PNW Presented.
California Energy Commission California Energy Demand Preliminary Electricity Forecast July 7, 2015 Chris Kavalec Energy Assessments Division.
Avoided Cost and E3 Calculator Workshops Energy and Environmental Economics, Inc. October 4, 2005.
Northwest Power and Conservation Council Slide 1 Accelerating Energy Efficiency To Reduce the PNW Power System's Carbon Footprint Tom Eckman Manager, Conservation.
Strategic Planning for DSM in a Community-owned Utility Presented by Shu-Sun Kwan & Ed Arguello Colorado Springs Utilities 2005 APPA Engineering & Operations.
Northwest Power and Conservation Council Action Plan Summary.
DRAFT Preliminary: BPA Summary of 6 th Plan Supply Curves May 15, 2009 Lauren Gage
1 California’s Energy Economy: A Regulatory Perspective Mark Ferron California Public Utilities Commission May 16, 2012.
September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities.
Regional Conservation Progress Review of Regional Savings from September 21, 2010.
Northwest Power and Conservation CouncilProCost Version 2.2 RTF July 2007.
RTF Update Kevin Smit Kelly Tarp ProCost Version 3.0 Modifications A registered professional engineering corporation with offices in the Seattle,
The Discount Rate in the Plan Wally Gibson NWPPC Power Committee – Kah-Nee-Ta July 15, 2003.
Northwest Power and Conservation Council The Northwest Forecast – Energy Efficiency Dominates Resource Development Tom Eckman Manager, Conservation Resources.
Northwest Power and Conservation Council The Role of Energy Efficiency in the Northwest Power and Conservation Plan Tom Eckman Manager, Conservation Resources.
1 Proposed Input Assumptions to RTF Cost-Effectiveness Determinations February 2, 2010.
Chapter 9 The Cost of Capital. Copyright ©2014 Pearson Education, Inc. All rights reserved.9-1 Learning Objectives 1.Understand the concepts underlying.
California Energy Commission Retail Electric Rate Projections: Revised Cases 2015 Integrated Energy Policy Report California Energy Commission December.
Sixth Power Plan A Public Utility Point of View Bill Gaines, Director, Tacoma Public Utilities Craig Smith, Assistant General Manager, Snohomish PUD Northwest.
Experience you can trust. Californial Industrial Energy Efficiency Potential CALMAC/MAESTRO Meeting San Francisco, CA July 27, 2006 Fred Coito
Extra electricity slides
Sixth Northwest Conservation & Electric Power Plan Interim Wholesale Electricity Price and Carbon Dioxide Production Forecasts Maury Galbraith Northwest.
1 CHAPTER 10 The Cost of Capital. 2 Topics in Chapter 10 Individual sources of capital and their cost WACC.
Chapter Inflation and Capital Investment Analysis
3/12/ Regional Conservation Resource Supply Assessment Who Wants It & Why How We Propose to Do It And Whose to Blame If We Fail.
Draft Seventh Power Plan Meets RTF. Key Finding: Least Cost Resource Strategies Rely on Conservation and Demand Response to Meet Nearly All Forecast Growth.
Northwest Power and Conservation Council How The Council’s Fifth Power Plan Conservation Targets Affect You 2007 Bonneville Power Administration Utility.
Progress Toward the Sixth Plan’s Regional Conservation Goals 2014 Achievements November
Northwest Power and Conservation Council The Northwest Experience with Energy Efficiency As A Resource Option Tom Eckman Manager, Conservation Resources.
1 Water Department FY 2014 Sources and Uses FY 2014 Sources Retail Sales$54,788,834 Wholesale Sales646,250 Other Operating Revenues145,000 Non-Operating.
Default price-quality paths for gas pipeline services Briefing on the Commission’s final decision for financial market analysts 28 February 2013.
Los Angeles County Community Choice Aggregation Regional CCA Task Force Meeting October 28, 2015.
Northwest Power and Conservation Council Slide 1 Direct Use of Natural Gas Economic Fuel Choices from the Regional Power System and Consumer’s Perspective.
Revised draft decision: Initial default price-quality paths for gas pipeline services Briefing for financial market analysts 24 October 2012.
Mike Jaske California Energy Commission
Preliminary Electricity Rate and Time of Use Rate Scenarios
Revised Electric Rate Scenarios:
Demand Response in the 7th Power Plan
Resource Adequacy Demand Forecast Coincidence Adjustments
Presentation transcript:

1 Cross-Cutting Analytical Assumptions for the 6 th Power Plan July 1, 2008

2 Power Plan Required Analytical Inputs Discount Rate Cost of capital Share of conservation cost financed and by whom Transmission and Distribution System Losses Value of Deferred Transmission and Distribution System Expansion Forecast Future Electricity and Natural Gas Prices

3 Discount Rate Used to compute the present value of future costs and benefits Recent Council Policy has been to use the corporate perspective –Tax-adjusted cost of capital of the decision makers –This varies depending upon the mix of decision makers and forecast future economic conditions Discount Rate in Prior Plans – 3% to 4.75%

Inputs to Discount Rate Calculation – Who Pays for New Resources Entity or ItemReference Case LowHigh BPA share of public utility future generation resource supply 20%10%30% Generation share of new resource additions60%50%70% Conservation share of new resource additions40%30%50% Utility/SBC share of conservation cost60%50%70% Consumer share of conservation cost40%30%50% Residential share of consumer cost of conservation33%30%40% Commercial and Industrial (i.e., business) share of consumer conservation cost 67%60%70%

5 Inputs to Discount Rate Calculation – Real Cost of Capital

6 Inputs to Discount Rate Calculation – Real Cost of Capital (2) CategoryMean Real Discount Rate Standard Deviation Number of Companies Industrial7.50%3.20%2,409 Commercial Companies7.30%4.70%1,773 Commercial Property Owners4.50%0.90%8 Commercial - Government Owned3.30%2.10%25 Source: LBNL Technical Support Document for Distribution Transformers. Damodaran Online. The Data Page: Historical Returns on Stocks, Bonds, and Bills – United States

7 Discount Rate Calculation SectorReference Case LowHigh Residential Sector3.9%3.0%5.0% Industrial and Agricultural Sectors7.5%4.3%10.7% Commercial Sector7.7%7.0%9.0% Real Discount Rate for 6th Plan5.0%4.6%5.4%

8 Cost of Conservation Financing Virtually all utility or system benefits charge conservation acquisitions are “paid for” out of current rate revenues (i.e., they are not financed) Bonneville may borrow a portion (<50%) conservation program expenditures What should we assume for the 6 th Plan?

Proposed Residential Sector Sponsor ParametersCustomerWholesale Electric Retail Electric Natural Gas Real After-Tax Cost of Capital3.9%4.4%4.9%5.0% Financial Life (years)15111 Sponsor Share of Initial Capital Cost40%30% 0% Sponsor Share of Annual O&M100%0% Sponsor Share of Periodic Replacement Cost 100%0% Sponsor Share of Administrative Cost0%50% 0%

10 Proposed Commercial Sector Sponsor ParametersCustomerWholesale Electric Retail Electric Natural Gas Real After-Tax Cost of Capital6.7%4.4%4.9%5.00% Financial Life (years)10111 Sponsor Share of Initial Capital Cost50%15%35%0% Sponsor Share of Annual O&M100%0% Sponsor Share of Periodic Replacement Cost 100%0% Sponsor Share of Administrative Cost0%50% 0% * Does not include utilities for transmission and distribution efficiency upgrades

11 Public & Private Commercial Floor Area & Finance Costs

12 Proposed Industrial* & Agricultural Sectors Sponsor ParametersCustomerWholesale Electric Retail Electric Natural Gas Real After-Tax Cost of Capital7.5%4.4%4.9%5.0% Financial Life (years)10111 Sponsor Share of Initial Capital Cost50%15%35%0% Sponsor Share of Annual O&M100%0% Sponsor Share of Periodic Replacement Cost 100%0% Sponsor Share of Admin Cost0%50% 0% * Investments in transmission and distribution efficiency upgrades financed at utility cost of capital

13 Impact of Changes Increases cost of “consumer” financing for Agriculture, Commercial and Industrial (8% vs 4.0%) However, this is mitigated by the increase in discount rate which reduces the impact of future interest payments Slightly decreases cost of “consumer” financing for residential (3.9% vs 4.0%) However, increase in discount rate will make “long lived” shell measure less attractive than in 5 th Plan

14 Distribution System Losses RTF adopted 5% as estimate of Average Annual Distribution System Losses in 1999 – based on prior Council Plans RTF asked staff to review “annual” loss data to determine whether 5% assumption should be retained Implementation of “shaped distribution” system losses may be problematic do to absence of data needed to estimate “hourly distribution system loading”

Average Annual Distribution Losses for PNW Retail Utilities Sales Weighted Average = 4.7% Median = 5.7% Geometric Mean = 5.2%

16 Shape of Distribution System Losses Lazar Proposal –Total losses = 4.7% –Assume “no load” losses are 1% –Average “load losses” = 3.7% Load Losses = 2x average losses 2 x 4.7% = 9.4% Issue – How do we shape this hourly if we do not know hourly distribution system “loading”?

17 Transmission System Losses Prior Plan Used 2.5% Review of WECC System Modeling Appears to Suggest Average Transmission Losses are closer to 4.0% RTF Agreed to Use “Shaped Hourly Losses” ProCost Modified to Use Shaped Transmission (and Distribution) System Losses

18 Shape of Transmission System Losses – Now In ProCost Data File* * MC_and_Loadshape_6P.xls

19 Value of Deferred Transmission and Distribution Current RTF Assumptions –Distribution = $26.45/KW-yr (2006$) –Transmission = $4.12/KW-yr (2006$) CompanyTransmission (2006$/KW-yr) Distribution (2006$/KW-yr) Total ($/KW-yr) PacifiCorp$29.42$76.17$ PGE$9.87$20.37$30.14 SnohPUDNA$12.56NA PacifiCorp, PGE, SnohPUD & RTF Cost in 2000$ adjusted to 2006$ using Handy-Whitman Index

20 Value of Deferred Transmission Company/AreaAverage $/KWAnnualized $/KW-yr* SDG&E$312$18.80 SCE$859$51.70 PG&E$225$13.56 Cal$300$18.03 S. Cal$276$16.60 N. Cal$354$21.30 *All values in 2006$. Assumes WACC = 4.54%

21 Assumed Transmission Financing WACCShare of Financing Public3.14%5% BPA4.46%75% IOU5.20%20% WACC4.54%100%

22 Estimated Value of Deferred Transmission Cost PacifiCorp, PGE, SnohPUD & RTF Cost in 2000$ adjusted to 2006$ using Handy-Whitman Index

23 PSE Distribution Cost Estimate Methodology “ Color-coded” 10 years (1990 – 2000) of capital investments in distribution system –Excluded Investments needed to maintain current system –Excluded Investments needed to provide new service –Included Investments needed to reinforce existing system to handle increased demand

PSE Results – First Year Cost All values in 2006$. Low and High computed as one standard deviation from 10 yr average. 2000$ Adjusted to 2006$ using Handy-Whitman Index.

25 Assumed Distribution Financing WACCShare Muni/PUD3.14%40% Coop4.46%5% IOU5.20%55% BPA4.46%0% Weighted4.33%100%

PSE Results – Annualized Cost All values in 2006$. 2000$ Adjusted to 2006$ using Handy-Whitman Index. Assumed WACC = 4.33% based on 45% Public/55% IOU Financing

Other Estimates of the Value of Deferred Distribution Source: Energy and Environmental Economics and PEA. Costing Methodology for Electric Distribution System Planning. 11/9/2000

Estimated Value of Deferred Distribution Cost All values in 2006$. 2000$ Adjusted to 2006$ using Handy-Whitman Index. Assumed WACC = 4.33% based on 45% Public/55% IOU Financing

29 Recommendations Distribution System Losses – Retain 5% Assumption –What about “shaping”? Transmission System Losses – Use Hourly Losses (Increases average from 2.5 to 3.9% for “System Load Shape) Distribution System Deferred Cost - $25/ KW-yr Transmission System Deferred Cost - $23/ KW-yr Natural Gas Market Price Forecast – Use Medium Price Forecast Electricity Price Forecast – Use High Capital Cost-High CO 2 as proxy for Market Price + “Avoidable” RPS Cost

30 Forecast Gas Prices at Henry HUB

5 th Plan Natural Gas Market Price “Scenarios”

5 th Plan Electricity Market Price “Scenarios” – Constrained by FERC Cap

5 th Plan Electricity Market Price “Scenarios”

Which Market Price Forecast Should be Used for “Illustrative” Determination of Cost Effectiveness?

35 Levelized Price of Future Market Price Scenarios