Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

Review of NTS entry charge setting arrangements - IA 1 July 2010.
Hybrid Option(s) Ritchard Hewitt – August Fundamentals  Parameters – Cost Reflective, Incentive, Value  Cost – What does it cost the service provider.
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
Information Transparency Proposal Transmission Workstream 2 nd November 2006 Presentation by Abid Sheikh, energywatch and Angela Love, Poyry Energy.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
20 September 2015 GAZ DE FRANCE ESS Introduction of Gas Reserve Arrangements Mark Bailey Gaz de France ESS.
Industry Dialogue on xoserve Services Progress Report for Ofgem 5 th December 2006.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Further consultation on NTS entry baselines Nienke Hendriks Head of Gas Transmission Policy, Compliance and Enforcement 14 August 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
The Entry Capacity Transfer & Trade Methodology Statement Transmission Workstream
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
Review Group 291 – Balancing Arrangements Default Cashout Workshop 3 – 21 st June 2010.
Changes to the Network Emergency Co-ordinator (NEC) Safety Case resulting from Exit Reform UNC Workgroup 0412 Meeting – 1 st March 2012.
Ofgem’s Gas SCR – Background on the DSR mechanism Stephen Jarvis 02/07/14.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
10 November 2015 GAZ DE FRANCE ESS Modification Proposal 0086 “Introduction of gas demand management reserve arrangements” 1 st June 2006 Phil Broom and.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Operating Margins UNC Sub Group Tuesday 2nd December 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
1 Modification Proposal 0199: Clarification around the application of the UNC Dispute Resolution Process Alison Chamberlain National Grid Distribution.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Gas emergency cash-out Ofgem perspective Transmission Workstream - 3 July 2008.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
Ofgem’s decision on UNC modification proposal 044 Sonia Brown.
European Developments Transmission Workgroup 3 rd May 2012.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Review of the UNC Post-emergency Claims Arrangements Strawman February 2009.
Mod 376: Increased Choice when Applying for Enduring NTS Exit Capacity Jeff Chandler - 5 th May 2011 Transmission Workgroup - Elexon 1.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Modification Proposal 0283 Update
Review Group 291- Ofgem Update
Review of UNC Section Q “Emergencies”
UNC Modifications 061 & 062 – An Overview
Code Governance Review UNC Modification Proposals
UNC Trader User – Licence obligations
Modification Proposal 0192 – Draft Business Rules.
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – OPEN LETTER Review Group August th November 2010.
Joint Office Presentation for Modification 0678
Credit Modification Proposals Update
Review Group 291- Ofgem Update
Ritchard Hewitt – September 2010
Draft Mod: Update of default System Marginal Prices
Proposed Transitional Gas Exit Arrangements
Proposed Changes to UNC Section O
UNC Transmission Workstream 15th June 2005
Entry Overrun Calculation
Ofgem presentation to Gas Transmission Workstream
Modification Proposal 136
Presentation transcript:

Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager

Decision Letter on Proposal 0021  Main points - Cashout Prices:  “that the current arrangements potentially create perverse incentives for shippers who are short of gas”  That current arrangements “may encourage shippers to move further out of balance to trigger an emergency”  “There is a risk that the current arrangements will fail to attract price sensitive sources of gas”  “shippers have a weaker incentive to contract for demand response” “ “ – quotations taken from Ofgem decision document on Modification Proposal 0021

Decision Letter on Proposal 0021  Main points - Cashout Prices continued:  SMP buy (*) “is likely to better reflect the prevailing market price for gas”  “Exposing shippers to SMP buy… will promote the economic and efficient operation of the pipeline system”  Clarification of treatment of OTC Trade Nominations (*) during emergency stage 2  However concerns expressed regarding small volumes * See UNC for definition of this term

Decision Letter on Proposal 0021  Main points – Interruption Volume adjustment.  ”this element of the modification proposal in principle better facilitates the relevant objectives” but,  “Critical improvement” areas:  Expansion to include Firm System Exit Points (*)  Inclusion of treatment of disputes in relation to the ECQ * See UNC for definition of these terms ECQ – Emergency Curtailment Quantity includes curtailment of flows at either or both Interruptible and Firm System Exit Points

Proposed developments of 0021 proposal to address “Critical” improvements  Expansion of the proposal to include all System Exit Points except Non Daily Metered and Priority Loads*  Inclusion of new dispute resolution process for the ECQ element of the Proposal. Based on existing resolution process set out in UNC  Clarification of treatment of OTC Trade Nomination process during stage 2 and 3 of a Network Gas Supply Emergency (*) * See UNC for definition of this term

Other changes proposed  Inclusion of requirement for the Relevant Transporter to calculate ECQ and pass to Transco NTS.  ECQ information, by System Exit Point (*), to be made available to Users after the Gas Day (*) to support dispute process including information describing the basis of the methodology used to calculate ECQ. * See UNC for definition of this term

Options for ECQ calculation  Proposal to include all DM System Exit Points  Proposal to include “best estimate” requirement on Relevant Transporter  Possible options for assessing ECQ  Steps  OPN  Based on Historical information (D-1, D-7 etc)  SOQ * % peak day

Dispute process  Replicate current UNC disputes process.  To cover ECQ value  Information released by Relevant Transporter after the day to inform this process.

Marginal Cashout price  Ofgem Decision letter states that “exposing shippers to SMP Buy …. rather than 30 day average SAP will promote the economic and efficient operation of the pipeline system”  Issues raised by respondents to 0021 consultation  Small volume setting SMP buy  Link to electricity regime decisions

Marginal Cashout price  Small trades setting SMP buy has been acknowledged as less of an issue in the gas regime than the electricity regime.  Previous statements made by Transco NTS that it will take all efficient and economic actions. This assessment includes having a reasonable expectation that such trade will have a materially beneficial effect on the system balance position.  Other Marginal price models would need further assessment and development.

Marginal Cashout price  Transco NTS continues to believe that SMPbuy and SAP dual price emergency cashout provide the best combination of incentives both to those shippers who are short and those who are long to both avoid the emergency and to then use the OTC Trade Nomination facility during stage 2 and 3.  SMP buy also provide the best incentive for any trades taken by the Residual System Balancer prior to the emergency to be delivered.

Medium term developments not part of Urgent Proposal  Inclusion of ECQ calculation methodology in the UNC.  Review of Section Q – already a Transmission Workstream Topic.  Other Marginal Price models * See UNC for definition of this term

Timetable  Raise Urgent Mod shortly  If accepted consult over August  Implementation for this Winter  Possible industry meetings during consultation phase to inform responses