M. Brooks, LANL 1 Intro Goals: Status reports on each topic, to bring all collaborators up-to-date on work To-Dos for upcoming review, and following review,

Slides:



Advertisements
Similar presentations
Grant-Writing A non-profit’s guide to preparing grant proposals.
Advertisements

Making Sense of Projects The Ability to Lead and Other Basics.
PALM-3000 Management Update A. Bouchez, J. Roberts Team Meeting #15 10/29/09.
Software Engineering General Project Management Software Requirements
The Proposal. Project Proposals Genesis of Proposals: They can result for formal requests (e.g. Request For Proposal, RFP) They can be unsolicited (e.g.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Stefan Moeller X-Ray October 27, X-Ray Detectors Stefan Moeller.
7M701 1 Software Engineering Project Management Sommerville, Ian (2001) Software Engineering, 6 th edition Ch. 4
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
A successful Final Year Project
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
1 Software Engineering Muhammad Fahad Khan Software Engineering Muhammad Fahad Khan University Of Engineering.
The Learning Agreement, Intellectual Property Rights and Project Approval Professor Dianne Ford Director of PhD Studies, Faculty of Medical Sciences.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Concerned with activities involved in ensuring that software is delivered: on.
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
Agenda - meeting of the GERDA Collaboration Board November 9, Approval of Agenda 2. Approval of minutes of previous Collab Board meeting 3. Update.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives The Mission Report Purpose and objectives What is not needed? Evolution of the.
Getting the most from HDR milestones Assoc Prof Suellen Murray DSC HDR Director 11 March 2015.
Process Protocol Demonstrator Implementation of the Process Protocol at the Britannia Walk Development Stuart Carmichael Process Network 7 March 2002.
Intro: Spin Report Update Hi Gerry (from S. Vigdor, 10/17/07), I would like to ask you to organize efforts, with the help of the others copied on this.
First SPL Collaboration Meeting Organization of the Collaboration - Preliminary ideas - R. Garoby 12/12/2008.
Intro to Federal Grant Opportunities Maine Association of Nonprofits November 8, 2010 Dial in to hear webinar: Enter:
HFT project Overview and Status October 14, 2010 F.Videbaek BNL.
Electronic Engineering Department Final Year Projects September 2008.
CHAPTER#08 MANAGEMENT OF TECHNICAL PROPOSALS AND SPECIFICATIONS Lecture No. 08 Course: Engineering Management 19 april 2013 MED DEPARTMENT, U.E.T TAXILA.
SBS PMP STATUS JOHN J. LEROSE 4/25/2012 received from Bob McKeown 4/12/2012.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Welcome to Technical Communications Enl Overview Course structure Course structure Course schedule Course schedule Student assessment Student assessment.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
Muon trigger upgrades, missing since not aimed towards DOE funding PHENIX upgrades: view presented to DOE R&D $3.5M Construction $16.6M Au-Au p-p 200 Si-Si.
Bell-ringer: Monday We have talked about On-Demand writing a few times this year. Number your paper 1-10, list 10 thing you know about On-Demand writing.
David Lee, FVTX Review Nov Cost and Schedule WBS 1.0 David M. Lee Los Alamos National Lab Deputy Project Leader.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
Assessment and Testing
J.C. Sheppard, SLAC Americas Region September 27, ILC Positron TDR and R&D Collaboration Meeting 1: Oxford Introduction Discussion J. C. Sheppard.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
FVTX Wedge Assembly WBS , , , , , David Winter Columbia University FVTX Wedge Manager.
INFM 737: MIM Capstone Experience Information Session DR. WEAVER UNIVERSITY OF MARYLAND ISCHOOL TETYANA BEZBABNA UNIVERSITY OF MARYLAND.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
MICE CMPB Alain Blondel 1 Highlights on MICE.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Cost and Schedule.
Peter Sharp CERN CMS Tracker Summary of the Tracking Trigger Working Group Peter Sharp 21 November 2008.
Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs Cost Schedule.
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
Joint BPS and ESS/ITS ATC/AFC Subcommittee Update November 2007 – January 2008 February 5, 2008.
M. Brooks, 16-Dec-00 Muon Collaboration Meeting North FEE Schedule Assume installation in 2002 shutdown, June-October(?), gives 1.5 years to complete pre-installation.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
SUMMARY ON THE SPL STUDY COLLABORATION R. Garoby – 12/12/2008 First SPL Collaboration Meeting December, CERN.
News and Misc Didier Contardo, Jeff Spalding UPO 3/2/12 1 UPO 2/2/12 o The MM, cost estimates and reporting o Milestones and scheduling o Chamonix Meeting.
18 March 2004 / Rev. 01 Cyber Blue – Team 234 Perry Meridian High School Indianapolis, IN Design Review Process Documentation This document is intended.
Supplier Management Can’t live with them, Can’t live without them!
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
QCG Report Francesco Forti University and INFN, Pisa.
Tier III Documents Expectations GROUP TA | MARCH 10, 2016 CFPHE.
TDR end game. Timeline constraints We need to use the current momentum to conclude the TDR work Needed by all funding agencies to support funding requests.
1 FVTX Quarterly/Monthly Report July 2008 Melynda Brooks, Dave Lee.
Collab_NSAC 4/2/03 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to EDM Collaboration Meeting Los Alamos, NM.
Organization and Goals for the Workshop
Change Management V.N.Bhaskar Rao Engineering & Construction Director Amec Foster Wheeler India Operations.
7th Belle II VXD Workshop, Prague
Mini-drawers, FE-ASIC , Integrator
Preparation for the June 2005 High Confidence Medical Device Software & Systems (HCMDSS) Workshop (continued…) We have a new url:
Current Status Future Progress Monitoring
The Learning Agreement, Intellectual Property Rights and Project Approval Professor Dianne Ford Director of PhD Studies, Faculty of Medical Sciences.
District and School Accountability System: Proposed Modifications
Detector Proto-Technical board Sep 30, 2010
Presentation transcript:

M. Brooks, LANL 1 Intro Goals: Status reports on each topic, to bring all collaborators up-to-date on work To-Dos for upcoming review, and following review, articulated by each speaker. Discussion of these to-dos (are they correct, who will be doing them, can they be finished in time) Schedule: PM stated late-April/early May is current suggested time-frame for DOE review Mid-April deadline for TDR? Construction start: Jehanne said we could expect to be advised of this before the review

M. Brooks, LANL 2 Summary of March 2006 Review comments Well articulated physics justification: (response was good, initial presentation needed work). Details on systematics with c/b separation; how does FVTX help W physics. Multiple rounds for FPHX development (to address unforseen problems) FPHX initial design should be completed before next review Final wedge design should be completed before next review Formal management plan (to address concerns over external contractors) Clear fab and assembly plan, complete manpower, times included Mechanical support and cooling design should be advanced before next review Complete testing plan should be incorporated into schedule Clear milestones presented Good progress on all these fronts, to-dos should be addressed today

M. Brooks, LANL 3 Summary of February 2007 Review comments Physics writeup in proposal could be better articulated – agreed, needs re-write rather than successive edits Thorough system-level electrical design needs to be completed – grounding, cross-talk, noise pickup… Absence of electronics design engineer “glaring omission” – some ? From me: combination of Eric M. plus engineers already working on project Need to decide on one readout plan – agreed Design components to allow diagnostics capabilities at all levels Rad-hardness, b-field immunity of electronics components demonstrated soon (in-situ tests suggested for rad-hard) Think cost and especially schedule contingency is probably too small, especially if take into account suggestions throughout the review Urgency on Lvl-1 – Not completely clear what this meant. After some questioning, they said the urgency was to find funding (not necessarily to do any particular studies of performance)