Research and development of Micromegas detector and related devices (Project N° 4304-1) Updated progress report and second extension request (up to March.

Slides:



Advertisements
Similar presentations
A Brief Report on Characteristic Studies of Micromegas Applied Nuclear Physics Division Saha Institute of Nuclear Physics, Kolkata, India RD51 Collaboration.
Advertisements

Amsterdam, March 31, 2003 P. Colas - European R&D for gaseous trackers 1 European gaseous tracking hardware HistoryHistory GEM and MicromegasGEM and Micromegas.
Beijing, August 18, 2004 P. Colas - Micromegas for HEP 1 Recent developments of Micromegas detectors for High Energy Physics Principle of operationPrinciple.
Amsterdam, April 2,2003P. Colas - Micromegas TPC1 Micromegas TPC: New Results and Prospects New tests in magnetic fieldNew tests in magnetic field FeedbackFeedback.
Chicago, January 8, 2002P. Colas - micromegas TPC1 A micromegas TPC prototype in a magnetic field Principle and advantages of a micromegas TPCPrinciple.
Research and development of Micromegas detector and related devices (Project N° ) Updated progress report and extension request P. Colas, S. Mukhopadhyay.
Practical operation of Micromegas detectors
D. Peterson, “ILC Detector Work”, Cornell Group Meeting, 4-October ILC Detector Work This project is supported by the US National Science Foundation.
Astrophysics Detector Workshop – Nice – November 18 th, David Attié — on behalf of the LC-TPC Collaboration — Micromegas TPC Large.
SLAC 7-10 Jan. 2004M. Ronan - Micromegas TPC1 Micromegas TPC Magnetic field cosmic ray tests Review of previous Micromegas studies Review of previous Micromegas.
Carleton University A. Bellerive, K. Boudjemline, R. Carnegie, A. Kochermin, J. Miyamoto, E. Neuheimer, E. Rollin & K. Sachs University of Montreal J.-P.
Practical operation of Micromegas detectors Paul Colas, CEA/Irfu Saclay CERN, Feb.17, 20091Practical operation of Micromegas.
IHEP, Bejing 9th ACFA ILC Physics and Detector Workshop & ILC GDE Meeting The preliminary results of MPGD-based TPC performance at KEK beam.
Status and outlook of the Micromegas modules D. Attié, D.S. Bhattacharya, P. Colas, S. Ganjour, et al. LCTPC Collaboration meeting DESY, 30/05/2014.
D. Attié CEA Saclay/Irfu RD51 – ALICE Workshop June 18 th, 2014 ILC-TPC Micromegas: Ion Backflow Measurements.
Snowmass, August, 2005P. Colas - Micromegas TPC beam tests1 A.M. Bacala, A. Bellerive, K. Boudjemline, P. Colas, M. Dixit, K. Fujii, A. Giganon, I. Giomataris,
Stanford, Mar 21, 2005P. Colas - Micromegas TPC1 Results from a Micromegas TPC Cosmic Ray Test Berkeley-Orsay-Saclay Progress Report Reminder: the Berkeley-Orsay-
Orsay, January 12, 2005P. Colas - Resistive anode Micromegas1 Dan Burke 1, P. Colas 2, M. Dixit 1, I. Giomataris 2, V. Lepeltier 3, A. Rankin 1, K. Sachs.
Astrophysics Detector Workshop – Nice – November 18 th, D. Attié, P. Colas, E. Delagnes, M. Dixit, M. Riallot, Y.-H. Shin, S.
EPS-HEP 2015, Vienna. 1 Test of MPGD modules with a large prototype Time Projection Chamber Deb Sankar Bhattacharya On behalf of.
Dan Peterson, Cornell University Presented at the Workshop on Detector R&D Development of a Low-Material TPC Endplate for the ILD Experiment at.
FIRST TEST RESULTS FROM A MICROMEGAS LARGE TPC PROTOTYPE P. Colas (CEA Saclay), on behalf of the LC-TPC collaboration Micromegas with resistive anode:
Micromegas TPC Results from beam tests 7-module design ILD TPC mechanics and integration D. Attié, M. Carty, P. Colas, G. De Lentdecker, M. Dixit, M. Riallot,
Beijing, Feb.6, 2007 P. Colas - Micromegas TPC 1 Micromegas TPC studies in a 5 Tesla magnetic field with a resistive readout D. Attié, A. Bellerive, K.
Micromegas TPC Beam Test Result H.Kuroiwa (Hiroshima Univ.) Collaboration with Saclay, Orsay, Carlton, MPI, DESY, MSU, KEK, Tsukuba U, TUAT, Kogakuin U,
P. COLAS, CEA/SACLAY New Results from the LC Large TPC prototype 31/10/2014 LC TPC recent results 1 Kolkata, RD51 WG1.
Experimental and Numerical studies on Bulk Micromegas SINP group in RD51 Applied Nuclear Physics Division Saha Institute of Nuclear Physics Kolkata, West.
June 22, 2009 P. Colas - Analysis meeting 1 D. Attié, P. Colas, M. Dixit, Yun-Ha Shin (Carleton and Saclay) Analysis of Micromegas Large Prototype data.
Toward the final design of a TPC for the ILD detector D-RD9 P. Colas, K. Fujii et al. TYL-FJPPL Okinawa 2015.
29/09/2010 1Wenxin.Wang_EUDET annual workshop D. Attié, P. Colas, M. Dixit, M. Riallot, YunHa Shin, S. Turnbull, W. Wang and all the LC-TPC collaboration.
IHEP, Beijing 9th ACFA ILC Physics and Detector Workshop & ILC GDE Meeting The preliminary results of MPGD-based TPC performance at KEK beam.
A TPC for ILC CEA/Irfu, Apero, D S Bhattacharya, 19th June Deb Sankar Bhattacharya D.Attie, P.Colas, S. Ganjour,
R&D by LCTPC collaboration Last week: DESY PRC review: Status report:
Plans for a Simulation Study of the Magnetic Field Requirements of the LC TPC February 2006, ILC TPC Analysis Jamboree, DESY Christian Hansen University.
TPC Studies at University of Victoria ALCPG meeting SLAC, January 2004 Dean Karlen University of Victoria / TRIUMF.
Wenxin Wang 105/04/2013. L: 4.7m  : 3.6m Design for an ILD TPC in progress: Each endplate: 80 modules with 8000 pads Spatial Resolution (in a B=3.5T.
P. Colas on behalf of LCTPC. Strategy for Micromegas The Micromegas option is studied within the same (EUDET) facility as the other options (see R. Diener’s.
January 10, 2008MiPGD TPC resolution and gas1 Micromegas TPC addendum on measurements P. Colas, Saclay Lectures at the TPC school, Tsinghua University,
Wide-frame view on Saclay LCTPC activities P. Colas.
Wenxin Wang On behalf of LCTPC 01/11/2012W.Wang_ IEEE Conference Nuclear Science Symposium, Medical Imaging Conference & workshop on Room-Temperature.
Numerical Studies on IBF of BULK Micromegas RD51.
Tracking in a TPC D. Karlen / U. Victoria & TRIUMF for the LCTPC collaboration.
On behalf of the LCTPC collaboration VCI13, February 12th, 2013 Large Prototype TPC using Micro-Pattern Gaseous Detectors  David Attié 
Astrophysics Detector Workshop – Nice – November 18 th, David Attié — on behalf of the LC-TPC Collaboration — Beam test of the.
D. Attié, P. Colas, K. Fujii,T. Matsuda, M. Riallot, A. Sugiyama, W. Wang Thanks to M. Dixit, Yun-Ha Shin, S. Turnbull,Yulan Li Construction and tests.
Wenxin Wang (D. Attié, P. Colas, E. Delagnes, Yuanning Gao, Bitao Hu, Bo Li, Yulan Li, M. Riallot, Xiaodong Zhang)
Durham, Sep 3, 2004P. Colas - Micromegas TPC1 Micromegas TPC Berkeley-Orsay-Saclay Progress Report Reminder: the Berkeley-Orsay- Saclay cosmic setupReminder:
Gaseous Tracker R&D ILC Detector Test Beam Workshop Fermi National Accelerator Laboratory January 17-19, Madhu Dixit Carleton University & TRIUMF.
Vienna Conference on Instrumentation – February 27, D. Attié, A. Bellerive, K. Boudjemline, P. Colas, M. Dixit, A. Giganon,
CERN, May 9, 2001P. Colas - TPC, kick-off meeting1 Present and future TPC work at LBL-Orsay-Saclay Principle and advantages of a micromegas TPCPrinciple.
TPC for ILC and application to Fast Neutron Imaging L. An 2, D. Attié 1, Y. Chen 2, P. Colas 1, M. Riallot 1, H. Shen 2, W. Wang 1,2, X. Wang 2, C. Zhang.
Beam test Analysis Micromegas TPC by Wenxin Wang.
A Micromegas TPC for the ILC. 2 Introduction: Micromegas & TPC I. Micromegas ILC-TPC ILC & LP-TPC Beam test with Micromegas modules Test bench Ion backflow.
Large Prototype TPC using Micro-Pattern Gaseous Detectors
The Micromegas TPC: achievements and plans for future beam test
Micromegas modules achievements and plans
Large TPCs for HEP ILC-TPC & Fast Neutron detector
Test of a new anode resistive coating for a Micromegas TPC
Potential Ion Gate using GEM: experiment and simulation
Micromegas module for ILC-TPC
Recent test results from a fully integrated Micromegas TPC prototype
Toward the final design of a TPC for the ILD detector
Recents Analysis Results From Micromegas TPC
TPC Paul Colas Technical meeting, Lyon.
Dan Burke1, P. Colas2, M. Dixit1, I. Giomataris2, V. Lepeltier3, A
Paul Colas, CEA Saclay, Akira Sugiyama, Saga U.
a TPC with resistive Micromegas
D. Attié, P. Colas, K. Fujii,T. Matsuda,
Large TPCs for HEP RD51 P. Colas Lanzhou U., Saclay, Tsinghua U.
Covering a Large Area ILC-TPC endplate
Presentation transcript:

Research and development of Micromegas detector and related devices (Project N° ) Updated progress report and second extension request (up to March 2016) P. Colas, S. Mukhopadhyay CEFIPRA Scientific Council, Nice, France, May 29, 2015

Updated report Introduction : ILC, Micromegas and TPC Small prototypes The Large prototype The PhD student Deb Sankar Bhattacharya Recent achievements :analysis, cooling, new resistive material Plans 29/05/2015CEFIPRA SC, Nice, Micromegas2

History of the project First meeting in Saclay in December 2008, discussing possible collaborations First travel from France to India in January Application to CEFIPRA. Started April 1, 2011, due to end on March 31, 2014, extended to September 30, Documents written : detailed project March 2009, annual report from April 2011 to March 2012, mid-term report presented on Nov. 17, 2012 at the CEFFIPRA S.C. in Aurangabad, updated progress report April 2014 and extension request, this updated progress report (April 2015) and extension request to March /05/2015CEFIPRA SC, Nice, Micromegas3

Micromegas: How does it work? Y. Giomataris, Ph. Rebourgeard, JP Robert and G. Charpak, NIM A 376 (1996) 29 S1 S2 Micromesh Gaseous Chamber: a micromesh supported by m insulating pillars, and held at V anode – 400 V one stage Multiplication (up to 10 5 or more) takes place between the anode and the mesh and the charge is collected on the anode (one stage) transparency Funnel field lines: electron transparency very close to 1 for thin meshes fast Small gap: fast collection of ions S2/S1 = E drift /E amplif ~ 200/60000= 1/300 29/05/2015CEFIPRA SC, Nice, Micromegas4

529/05/2015CEFIPRA SC, Nice, Micromegas TPC: -Long conversion and drift region -Measurement of drift time gives transverse coordinate

The new context of the ILD TPC 29/05/2015CEFIPRA SC, Nice, Micromegas6 Triggered by H(125) discovery in 2012 Detailed site studies are going on in Japan The XFEL is being assembled at DESY (March 2015) This calls for realism in the design En route for one of the possible locations of the Interaction Region (Sept. 2014)

TPC Large Prototype at DESY 29/05/2015 GEMs Micromegas March 2015 CEFIPRA SC, Nice, Micromegas7

The Large prototype Built by LCTPC collaboration Magnet and cooling plant by KEK, Tsukuba Equipped by Saclay with resistive anode Micromegas. Cooling tested in February 2014 at DESY 29/05/2015CEFIPRA SC, Nice, Micromegas8

New Micromegas data taking in March 2015 at DESY New modules with new (japanese) resistive anode: Diamond-like Carbon rather than Carbon- loaded kapton. More robust, easier to achieve the wanted resistivity, easier to procure 29/05/2015CEFIPRA SC, Nice, Micromegas9

Events in the Large Prototype 29/05/2015CEFIPRA SC, Nice, Micromegas10

Pad multiplicity 29/05/2015CEFIPRA SC, Nice, Micromegas11 m=2. 6 m=3. 6 Npad / hit Need to spread the charge to improve resolution. ‘Black diamond’ spreads better the charge than Carbon-loaded kapton BD CLK

Analysis now in the same framework for MM and GEM 29/05/2015 CEFIPRA SC, Nice, Micromegas 12 PRELIMINARY Resolution 80 µm in r and 200 µm in z at zero drift distance Drift dependence follows expectation from diffusion

Work with small prototypes Full equipment of the SINP lab for small detector studies, and procuration of Micromegas detectors by the Saclay team Study of various gaps and geometry and comparison with simulation 4 publications (NIM and JINST) 29/05/2015CEFIPRA SC, Nice, Micromegas13

High-standards equipment at SINP 29/05/2015CEFIPRA SC, Nice, Micromegas14 Digital imaging Microscope Residual gas analyser

Work with small prototypes Ion backflow measurements in Saclay with the Indian team, followed by complementary measurements at SINP. 29/05/2015CEFIPRA SC, Nice, Micromegas15 Now published in JINST

Work with small prototypes Detailed simulations at SINP to understand the operation of Micromegas. (example : effect of pillars sustaining the mesh on the electron endpoint) 29/05/2015CEFIPRA SC, Nice, Micromegas16 Published in NIMA

New small TPC built at SINP 29/05/2015CEFIPRA SC, Nice, Micromegas17

The student Deb Sankar Bhattacharya Joined SINP in January 2013 Registered in PhD at Jadavpur University, with advisors S. Mukhopadhyay, A. Bhattacharya and P. Colas. PhD to be defended in Kolkata, in January-March Fully payed on CEFIPRA funds SINP Saclay 29/05/2015CEFIPRA SC, Nice, Micromegas18

Analysis and software ‘Software week’ in Saclay, where we work on the track reconstruction and analysis. 29/05/2015CEFIPRA SC, Nice, Micromegas19

Distortions from the Large Prototype 29/05/2015 CEFIPRA SC, Nice, Micromegas 20 O(mm) distortions can be corrected down to the 20 µm level

Distortions from the Large Prototype Inhomogeneity of the Electric field near the edges of the modules induces distortions (even at B=0) Also induces ExB effects Changes in E also changes the drift velocity Add up to mechanical misalignment Detailed module edge layout 29/05/2015CEFIPRA SC, Nice, Micromegas21

Distortions from the Large Prototype Inhomogeneity of the Electric field near the edges of the modules induces distortions (even at B=0) Also induces ExB effects Changes in E also changes the drift velocity Add up to mechanical misalignment Calculations by S. Mukhopadhyay 29/05/2015CEFIPRA SC, Nice, Micromegas22

29/05/2015CEFIPRA SC, Nice, Micromegas23 D.S. Bhattacharya carried out thermal simulation of the gas volume and of the endplate modules Thermal inhomogeneities cause changes in drift properties in the gas, hence distortions. Needs simulations.

Warming up and cooling down of a module. Good agreement with data 29/05/2015CEFIPRA SC, Nice, Micromegas24

Recent achievements October 2014: Visit of French team to SINP, Kolkata: organization of IWAD (International conference on Advanced Detectors), Lectures, and RD51 MPGD meeting Outreach event for CEFIPRA in November Papers in progress 29/05/2015CEFIPRA SC, Nice, Micromegas25

Outreach poster for CEFIPRA event, Kolkata, Nov /05/2015CEFIPRA SC, Nice, Micromegas26

Conclusion Lots of achievements after 3 years. French funds not yet spent, but just enough remains to pay salary and expenses of D.S. Bhattacharya through 2015, mainly to study distortions in the Large Prototype TPC 2 weeks in Kolkata for the French team, end of October 2014: MPGD workshop and teaching. Last installment + travels necessary to ‘wrap up’ nicely the project (and DSB thesis) 29/05/2015CEFIPRA SC, Nice, Micromegas27

Funding on French side SalariesRecurring expLeft to be spent Received25,00020,1434 mo (5,600) spent11,60014,150Travels ~4,300 total36,60034,2939,900 29/05/2015CEFIPRA SC, Nice, Micromegas28 Travels : PC to Kolkata 900, MT to Kolkata 1,400, thesis defence ~2,000 X : DSB to EPS conf. 1,500 Last instalment as foreseen should be fine Same on Indian side, plus 2 more travels if possible