The Design Management Team Framing the Scope of Work and Learning the Roles for the LCC Team.

Slides:



Advertisements
Similar presentations
MONITORING OF SUBGRANTEES
Advertisements

Gaining Senior Leadership Support for Continuity of Operations
Organizing a Site Visit Here Christine King Director, Research Development Services OVPR January 18, 2012.
Radiopharmaceutical Production
Implementation Council Meeting Structure and Resources Background: The Implementation Council (Council) roles and responsibilities are described in the.
Ensure Vendor/Engineer of Choice Product Quality
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
4.5 Multimedia Production
Green Roof Action Project 綠頂行動 Our scheme is not just about physical implementation of green features on top of school buildings, it is about the knowledge.
Project Plans CSCI102 - Systems ITCS905 - Systems MCS Systems.
MULTIMEDIA Development Team.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
PROGRAM KICK-OFF Program Name See Notes for Program Kickoff Guidelines.
QUALITY ASSURANCE PROJECT Conducting Effective Meetings The purpose of this module is to enhance participants’ knowledge and skill in observing team meetings.
Most business meetings include from two to six people and can be held in a private office or in a department conference room. When more than six participants.
L545 Systems Analysis & Design Week 4: September 23, 2008.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
Recap from last week Understand organizations, including the four frames, organizational structures. Explain why stakeholder management and top management.
สถานการณ์ ท่านดูรับผิดชอบเรื่องการ เตรียมการและตอบโต้ภาวะฉุกเฉิน ของหน่วยงาน ขณะนี้ท่านได้ จัดทำแผนเผชิญเหตุของ หน่วยงานเสร็จเรียบร้อยแล้ว ท่าน ได้รับคำสั่งจากหัวหน้าหน่วยงาน.
Introduction to Interactive Media The Interactive Media Development Process.
Chapter 13– Strategies for Effective Oral Presentations The goal of the presentation is to communicate, clearly and concisely, the results and implications.
Applied Project Management MGT 461 Lecture #2 Ghazala Amin.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Lessons Learned Workshop
Getting Started Conservation Coaches Network New Coach Training.
CHAPTER TWO THE MAKING OF MULTIMEDIA: AND MULTIMEDIA DEVELOPMENT TEAM
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
Creating Pathways for Education, Career and Life Success Webinar: Developing a Pathways Plan January 18, 2013 Facilitated by Jeff Fantine, Consultant.
7-1 Project Management from Simple to Complex. 7-2 This work is licensed under the Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported.
Stakeholder consultations Kyiv May 13, Why stakeholder consultations? To help improve project design and implementation To inform people about changes.
D1.HGE.CL7.01 D1.HGA.CL6.08 Slide 1. Introduction Design, prepare and present reports  Classroom schedule  Trainer contact details  Assessments  Resources:
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AND COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
Project Kick-off Meeting Presented By: > > > > Office of the Chief Information Officer.
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by This session will look at how to prepare Shelter Training for.
Administering a Griffiths Course Mrs Rebecca Shearer Postgraduate Administrative Co-ordinator, Edinburgh.
Copyright  2005 McGraw-Hill Australia Pty Ltd PPTs t/a Australian Human Resources Management by Jeremy Seward and Tim Dein Slides prepared by Michelle.
STAKEHOLDER MEETING Selecting Interventions to Improve Utilization of the IUD City, Country Date Insert MOH logoInsert Project logoInsert USAID logo (Note:
M253 Team Work in Distributed Environments Week (3) By Dr. Dina Tbaishat.
Principles and Methods of Team Teaching
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Communicating Marketing Research Findings
Lesson 3-Multimedia Skills. Overview Members of a multimedia team. Roles and responsibilities in a multimedia team.
1A FAST EXCELLENCE THROUGH FACILITATION Gary Rush The FAST Process MGR Consulting
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AMD COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
Quality Assurance. Define Quality (product & service) Exceeds the requirements of the customer. General excellence of standard or level. A product which.
Writing A Grant—From Start To Finish Workshop 4: Three (Not So) Little Words: Document, Collaborate, Evaluate Educational Resource Development LCC Foundation.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
1 Multimedia Development Team. 2 To discuss phases of MM production team members Multimedia I.
Welcome to the Zone-Level District Trainer Program Helping you to plan and conduct training meetings that support effective Rotary clubs.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
The Project Management Process Groups
AGRO PARKS “The Policy Cycle” Alex Page Baku November 2014.
1 Functional Area Owners Preparation for Primary Working Session.
Project Management PTM721S
Pre-planning Planning to plan (and adapt) Implementation starts Here!
Project Management Processes
The Writing Process.
TechStambha PMP Certification Training
Project Charter <Project Name>
Project Charter I want to design a project
Project Management Processes
Supporting SEACs across the Province:
PRODUCTION PHASES CHANGES
Project Management Method and PMI ® PMBOK ® Roles
{Project Name} Organizational Chart, Roles and Responsibilities
Radiopharmaceutical Production
Program Kick-off Program Name Purpose of Program Kick off
Presentation transcript:

The Design Management Team Framing the Scope of Work and Learning the Roles for the LCC Team

Key Distinction on Roles: Design management teams (DMTs) are groups of process experts with the complementary skills that are needed to implement the Cogniscope process for managing a complex design project. This team of process experts is distinct from the gathering of designers/stakeholders themselves. Designers are content experts, and the DMTs are process experts responsible to create and sustain a productive environment for collaborative team design.

Roles of Members of the DMT The Sponsor role The Broker role Project Coordinator role The Dialogue Manager(s) role CogniScope™ Operator role Recorders role Report Writer/Editor role Video Camera Operator (optional)

The Sponsor Role Establish and assure continuity to the design project. Collaborate in jointly framing the “triggering question” guiding the deliberations of the group. Make an opening statement at the workshop to orient the participants about the context of the problem situation and the importance of the group work. Explain the meaning of the triggering question to the satisfaction of the participants.

The Broker Role Ensure that All the designers participate in the entire design session. Ensure that the variety of perspective in the definition of the problem situation is not violated. Maintain a frequent and transparent communication with the Executive of the sponsor. Maintain a frequent and transparent communication with the Project Coordinator.

The Project Coordinator Role Meet with the Broker to: a) Determine dates, location, and scheduling of the session. b) Identify the nature of the project deliverables, including dates promised, quantity, etc. c) Delineate contractual arrangements such as fees and payment schedule, and administrative expectations such as lunch, dinner, snacks, etc. d) Establish the number of participants and observers, including names and addresses. e) Designate the individuals to fill the roles of the Dialogue Manager, CogniScope™ Operator, Recorder, and the Report Editor. Note that an individual may serve a dual role such as Recorder and Report Editor. f) Coordinate meetings between the Broker and the Dialogue Manager to agree on “triggering questions” and expected outcomes from the group work.

Project Coordinator (cont) Provide Report Writer/Editor with report printing information, i.e., quantity, delivery date, and any special requirements for the reproduction of the report. Establish the client files for the project. These files are: a) proposal, b) budgets, and other pertinent financial materials, c) internal and external correspondence, d) background information, and e) the report. Make arrangements for catering food and drinks. Let the Broker know what plans have been made. Assist with the miscellaneous needs of the participants and observers, such as transportation, lodging, food, etc.

The Primary Dialogue Manager Role Establish the agenda for the session and discuss its implications with the CogniScope™ Operator, Recorder, and Coordinator. Prepare appropriate flip-charts, slide presentations, handouts, etc. Prepare a workshop plan for the Team, with a copy to the Broker, spelling out in detail the triggering question(s) and generic question(s), and expected products such as tables and figures for the workshop. Establish CogniScope™ team caucuses during the session to reassess and redirect the group work.

Secondary Dialogue Manager Establish an understanding of when, where, and who is involved with a session. Determine from the Primary Dialogue Manager when the transitions will be made from a plenary session to small groups and assist in facilitating the small group work. Understand how to pace the small group work (in accordance with the established agenda.) Prepare flip-charts, handouts, visuals, etc., as needed for the Secondary Dialogue Manager work. Provide necessary back-up support to the Primary Dialogue Manager during the conduct of the group work.

Cogniscope Operator Be knowledgeable and facile, before a session, in the operation of the computer equipment, computer programs, and associated equipment such as a LCD projector, room lighting, protected cabling, etc. Meet with the Dialogue Manager to clarify the needs for the computer, approximate schedule, triggering and generic statements, display needs, etc. Enter the statements into the computer during the generation by the stakeholders. Print the statements and display them on the wall of the facility. Operate the computer to produce the Root Cause Map. Prepare a Root Cause Map graphic for distribution and interpretation by the workshop participants. Display the graphic on the wall or the screen.

Recorder Record and edit the statements and explanations during the discussion for clarification. Check for spelling and organization. Print tables as directed by the Facilitator for distribution to participants after the clarification portion of the workshop is completed. During the mapping keep track of any editorial changes in statements or participants’ comments as directed by the Dialogue Manager. Any amendments made during a session will be added to the appropriate tables as produced by the CogniScope™ software.

Report Writer/Editor Be thoroughly familiar with the established format for client reports. Determine from the Project Coordinator the dates which draft and final reports have been promised to the client and schedule writing, assembling, proofreading and editing time accordingly. Write a narrative, which describes the conduct of the session, and incorporate the figures and tables provided by the Recorder. Assemble a draft version of the client report following established format and proofread the draft and give it to the Project Coordinator for review. Prepare final version of the client report, which incorporates any revisions or corrections by the Primary Facilitator.

Video Camera Operator Setup equipment and test video and audio quality. Always replace the batteries in both the table microphones and camera microphones before every workshop. Determine ultimate usage of tape in conjunction with the Broker and Project Coordinator. Label tapes and let Project Coordinator know where they are placed after a workshop.