Hour Glass, Inc. Eve Fishinevich (Project Coordinator) Rondell Sinanan (Head of Research) Milestone 1 Date of Presentation: 08/99/9999 Section Z.

Slides:



Advertisements
Similar presentations
Meeting Agenda Preparation and Negative Resolution Scott Orthey.
Advertisements

Status Report Presentation. Is this initiative ahead of schedule (why – explain)? Is this initiative on schedule (why – explain)? Is this initiative.
Calista AVCP Regional Energy Plan. Preliminary Planning and Stakeholder Involvement Resource Inventory and Data Analysis Develop and Review Draft Energy.
Workshop: Preventive Maintenance
K & D DIVERSIFIED 3745 W. WAHALLA LN GLENDALE, AZ RVENG.NET Tooling & Manufacturing Engineering K & D’s capabilities consist of these.
Team #1: Brandon Fichera Dave Rabeno Greg Pease Sean Gallagher Sponsor: Dr. Stephanie Wright Delaware Aerospace Academy Advisor: Dr. Michael Keefe Mission.
NCDA: Pickle Sorter Project Proposal Project Sponsored by Ed Kee of Keeman Produce, Lincoln, DE.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2007 Progress Reports Week 4 Day 1.
Effective Meetings March 1, 2011 University Libraries.
EG1003: Introduction to Engineering and Design Milestone Presentation Format.
SMART Summit Meeting Minutes Agendas Henry Boshoff Principal Consultant 1.
Presenter | Presenter Date Month 2004 Title Sample *1 © Copyright THUS Group plc All rights reserved.
Enterprise Product Implementation Process. Components of a Successful Implementation  A detailed Scope Document for customer review and signoff  Creation.
Lecture 21 Questions.
© SYBEX Inc All Rights Reserved. Session 10 Project Control.
Robotics Kickoff Today : 1. Form teams 2. Go over Lego Golf Rules 3. Discuss Presentation due next week 4. Find and re-distribute Lego kits
Project Name Delete this tip note box: To estimate the length of your presentation multiply each slide by 3 minutes; this gives you the worst case.
Project Status Report Presenter Name Presentation Date.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter Work Day Check Robot Against Budget Work on Oral Report Work.
Intermediate 2 Critical Essay. Some tips Some tips Spread your time evenly. You have 1 hour and 30 minutes to write 2 essays. You should aim to spend.
Treasurer’s Report February 15, Section 305 Next Generation Equipment Committee Estimated Expenses January 1, 2010 to March 31, 2011 Executive Committee.
1 Managing the development and purchase of information systems (Part 3) BUS Abdou Illia, Fall 2005 (Week 12, Wednesday 11/16/2005)
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Final Demonstration Team 2A The Charles Machine Works Downhole Generator Project.
Problem Statement Expanding the capabilities of an auto repair paint drying system that uses newly developed ultraviolet (UV) light activated paint. This.
NATIONAL INSTITUTES OF HEALTH CHALLENGE GRANT APPLICATIONS Dan Hoyt Survey, Statistics, and Psychometrics(SSP) Core Facility March 11, 2009.
PRJ566 Project Planning & Management Work Breakdown Structure.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Tallinn, 13 December 2005 Syndication Adriana Baciu Finsiel Romania.
Milestone Presentation Format. Background  We have a template for lab presentations  These are guidelines for the milestone presentation.
A Breakthrough… Time Machine Evidence. Overview… VISIT TODAYVISIT TODAYVISIT.
Milestone Presentations What Goes In Them?. Background  We have a template for lab presentations  Enforces uniformity and completeness  We need a similar.
Hour Glass, Inc. Eve Fishinevich (Project Coordinator) Rondell Sinanan (Head of Research) Date of Presentation: 11/99/9999.
RHIC 56 MHz Cryomodule Informational Review RHIC Integration Cross-sectional view of 56 MHz Cavity in Vacuum Vessel.
Project evaluation Swati Mahila Vikas Sanstha, UP India ASHA Urbana Champaign.
Presented By: Aaron Goodwin Mike Pyrkosz April 15, 2004 Aquarium Wave Generator Project # A Design Review.
SMART Summit Electronic Meeting Minutes Eugene Lategan Senior Consultant 1.
Clients/Faculty Advisors Dr. Eric Bartlett May01-14 Team Members David Herrick Brian Kerhin Chris Kirk Ayush Sharma Incremental Learning With Neural Networks.
Project Proposal Doucument Project Title 2015 APEC e-Learning Training Program Name of Presenter Date, 2015.
7 - 1 Chapter 7 The Master Budget Objective 1 Explain the major features and advantages of a master budget.
WORDS DON’T COME EASY 20 th - 23 rd November 2013 Coordinators meeting.
 To provide a realistic accurate idea of the cost  Provide information about building or not.
WATER SYSTEM WORKSHOP February 27, 2012
Insert project name Project Manager: … Statnett:... 1 Project description NB! See notes under the foils for guidance! Insert picture.
Page Headline Project Management Cost & Schedule Review Rob Michnoff.
How Can I Strengthen my Sport Club Budget?
LIU Wire Scanner Milestones June 2017
Treatment List: Case # { } {List treatment and tooth numbers}
IS IT EFFECTIVE TO RUN ONLINE DATING BACKGROUND CHECKS YOURSELF?
Industrial Revolution
PROJECT CHARTER DOCUMENT
PCC Update 04/22/09 Planning Phase
Advice to Industry Panel – Contract Management Perspective
The Timeshifter Hour Glass, Inc. Eve Fishinevich (Project Coordinator)
Insert subhead here Project Status.
A B A B C D C D A B A B C D C D A B A B C D C D A B A B C D C D
February 10, 2015 University Libraries
مفهوم الموازنة العامة المقدمة
2019 Ministry & Auxiliary budget Overview
Project Title: Host Institution: <Name of Host Institution> PI:
Uncertain activity duration (P14)
SWEN 5230 Your Project Title
Machines.
Milestone Presentation Format
Heading on Sheet – Rear Window Date:
AME Programmatic Letter-of-Intent
BACKGROUND Team Members Project /Sub-Project Title :
Approach / Fund Utilization
Presentation transcript:

Hour Glass, Inc. Eve Fishinevich (Project Coordinator) Rondell Sinanan (Head of Research) Milestone 1 Date of Presentation: 08/99/9999 Section Z

Agenda Project Objective Background Information Technical Design Description Cost Estimate Project Schedule Summary

Projective Objective Petitioning for the creation of the world’s first working time machine Aiming to retrieve force field generator & saber tooth tiger Aiming to have it run at 50 years per minute

Background Information Requirements:  Retrieve one item from the past  Retrieve one item from the future NASA is soliciting designs for a time machine to find alternate energy sources

Technical Design Description Our robot uses quantum technology to warp time Travels 50 years in 5 minutes

Technical Design Description Design Sketch SKETCH

Cost Estimate Item/EmployeeQuantityUnit CostCost Item 1# $$$ Item 2# $$$ Item 3# $$$ Miscellaneous# $$$ Labor# $$$ Total$$$

Project Schedule

Summary We’re ahead of schedule  Robot built on CAD  Halfway built physically We’re on budget By Milestone 2:  Physical robot fully built  Retrieve item from the future or past (Benchmark A)

Hour Glass, Inc. Eve Fishinevich (Project Coordinator) Rondell Sinanan (Head of Research) Milestone 1 Date of Presentation: 08/99/9999 Section Z