Greg Hyde Raymond Zheng Joseph Rojano Katie Bentley Lori Liebman P14414 P3 ARBORLOO WIND RESISTANCE TEST STAND 1.

Slides:



Advertisements
Similar presentations
Washington County Public Schools / Voluntary State Curriculum VSC CO 2 Car Project 1.B.7 Explain that requirements involve the identification of the criteria.
Advertisements

AERODYNAMICS & THE FOUR FORCES
Experiment #5 Momentum Deficit Behind a Cylinder
Chapter 9 Solids and Fluids 1. Introduction 2. Fluids at Rest 3. Fluid Motion.
Air Muscle Robotic Tiger P Presentation Agenda Specs and Customer Needs Concept Summary Design Summary System Testing Results Successes and Failures.
Title: Intro to Water Bottle Rockets
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only Publisher The Goodheart-Willcox Co., Inc. Tinley Park, Illinois.
M.E. 462 Capstone Design I.U.P.U.I. Spring 2007 Bishop Steering: 1970 Lotus Europa Front Axle Re-design Aaron Emmons Phil Palmer Brad Holtsclaw Adam Spindler.
Computer Simulations of Wind Tunnel Experiments
Greg Hyde Raymond Zheng Joseph Rojano Katie Bentley Lori Liebman P14414 P3 ARBORLOO WIND RESISTANCE TEST STAND DETAILED DESIGN REVIEW 1.
P11228 Week 2 Japh Learn Joseph Corea Tim Monahan Bryan Reinheimer Ed Gliss.
06411 Micro Nucleating Bubble Engine Team Members Steven Nathenson Joseph Pawelski Joaquin Pelaez Andrew Pionessa Brian Thomson Project Sponsors Dr. Crassidis.
Hydraulic Power Units Eric Bornemann Fall Power Unit Basics Uses Uses Open and closed center systems Open and closed center systems Parts Parts-Pump.
Hybrid Fuel Cell Vehicles Followup Bob Thomas, Stephen Ha, Walter Kondratko IIT RET team This material is based upon work supported by the National Science.
Principles of Liquid Flow through Pipelines
Fluid mechanics 3.1 – key points
Friction Hard to Live With It, Can’t Live Without It Mu Coefficient of Friction FnFn What’s Stopping You?
Basic Hydraulics Irrigation.
“HEAR IT AND FORGET IT, SEE IT AND REMEMBER IT, DO IT AND UNDERSTAND IT” R12310: ME and ChemE Lab and Demo Hardware Development DPM – Spring 2012.
GARLOCK EXPANSION JOINT (MSDI-P13671) Systems Design Review January 11 th, 2013 Friday, January 11, 2013P Garlock Expansion Joint 1.
Illinois Space Society Tech Team USLI FRR Presentation.
P14474: Hydrostatic Test Apparatus Jake Manley Anushka Kalicharan Mitchell Sedore Brian Benner Kyle Abbott.
Force Analysis – Spur Gears
From Left to Right: Katie Bentley(ME), Greg Hyde(IE), Lori Liebman(ME), Joe Rojano(ME), Ray Zheng(ME) What is an Arborloo? An arborloo is a simple and.
Conservation of Mass, Flow Rates
UAV Research International “Providing integrated consultation to MAV project engineers at Eglin AFB” Chris McGrath Neil Graham Alex von Oetinger John Dascomb.
Greg Hyde Raymond Zheng Joseph Rojano Katie Bentley Lori Liebman P14414 P3 ARBORLOO WIND RESISTANCE TEST STAND 1.
Understanding Principles of Fluid Power Transmission
Week 1 Unit Conversions Conservation of Mass Ideal Gas Newtonian Fluids, Reynolds No. Pressure Loss in Pipe Flow Week 2 Pressure Loss Examples Flow Measurement.
Pumps and Lift Stations. Background Fluid Moving Equipment Fluids are moved through flow systems using pumps, fans, blowers, and compressors. Such devices.
POWER AND EFFICIENCY Today’s Objectives: Students will be able to:
Four Forces of Flight Rocket Project Day 1. Aerodynamic Forces Act on a rocket as it flies through the air Lift & Drag Lift Force – Acts perpendicular.
University of Arkansas Senior Project- When Pigs Soar.
Lesson 21 Laminar and Turbulent Flow
University of Florida Rocket Team Critical Design Review Presentation.
Chapter 6.1 Notes Power. The time it takes to complete an activity is as important as the work required. Compare running up stairs to walking up stairs.
Introduction to Engineering Systems Copyright ©2000, University of Notre Dame Module 1: Mechanical Systems Professor Flint O. Thomas Department of Aerospace.
Gravity Fed System Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O’Connell, Sarah Salmon, James Brinkerhoff Group Number: P
General Energy Equation. Chapter Objectives Identify the conditions under which energy losses occur in fluid flow systems. Identify the means by which.
Unit 1: Fluid Dynamics An Introduction to Mechanical Engineering: Part Two Fluid dynamics Learning summary By the end of this chapter you should have learnt.
So Far: Mass and Volume Flow Rates Reynolds No., Laminar/Turbulent Pressure Drop in Pipes Flow Measurement, Valves Total Head, Pump Power, NPSH This Week:
P Magnetically Levitated Propeller Group Members: Eli, Zach, Mike, Joe, & Bernie.
P16453 Subsystem Design Loading, Measurement, Control, and Test of a Journal Bearing Test Platform Kris Kidder | John Dolan | Shay Stanistreet | Anthony.
P16221 – FSAE Shock Dynamometer Problem Definition Review.
P16081: SYSTEMIC CIRCULATION MODEL Jacob Zaremski – Lead Engineer Mallory Lennon – Project Manager John Ray – Communications Manager Fabian Perez – Purchasing.
P – , TOW TANK FOR TETHERED HYDROFOIL TEAM MEMBERS: Hope Alm (ME)Tim Buckner (ME) William Lentlie (ME) Andres Santizo Matheu (ISE) Shauna.
Wind damage and mechanics of flying debris Wind loading and structural response Lecture 2 Dr. J.D. Holmes.
Rishitha Dias (IE): Team Manager Kevin Klucher (ME): Technical Lead John Hayles (ME): Design Engineer Reme Meck (ME): Turbomachinery Expert P09454.
Motor Assisted Wheelchair Design Review 10/01/15.
Aerodynamic Design of a Light Aircraft
Chapter 4.1 Notes Resistance (is futile!). ► Newton’s 1st law - Every object in motion stays in motion; Every object at rest stays at rest unless acted.
SUGGESTED MINIMUM KNOWLEDGE OF FLUID MECHANICS AND FOR FE EXAM
MAE 494/598 Group 3: Fabian Gadau Lucas Jaramillo Myrtle Lin Bryce Thompson Racetrack Optimization.
Click to edit Master subtitle style Fluid Power Introduction All Images reprinted with permission of National Fluid Power Association.
Chapter 3.
HYDRAULICS & PNEUMATICS
Hydraulic lift with the aid of energy storage (accumulators)
Kris Kidder | John Dolan | Shay Stanistreet | Anthony Miuccio
Pumps and Lift Stations
Stress Analysis on SunSiphon Rack Design
Control volume approach (검사체적 방법)
Tub Lift Rev. 2 Dom Group
POWER AND EFFICIENCY Today’s Objectives: Students will be able to:
Team P15441 Mini Air Sub-System Design Review
POWER AND EFFICIENCY Today’s Objectives: Students will be able to:
P14414Arborloo Wind Resistance Test Stand
Antonio Crispin Chester Hawkins Huy Le
P15611: Digital Microfluidics Packaging
POWER AND EFFICIENCY Today’s Objectives: Students will be able to:
Presentation transcript:

Greg Hyde Raymond Zheng Joseph Rojano Katie Bentley Lori Liebman P14414 P3 ARBORLOO WIND RESISTANCE TEST STAND 1

 Team Introductions  Project Statement  Customer & Engineering Requirements  Functional Decomposition  Morphological Chart  Benchmarking  Concept Generation & Selection  Risk Analysis  Project Plan  Summary OVERVIEW 2

TEAM INTRODUCTIONS 3 MemberMajorRole Greg HydeIndustrial Engineer Project Manager Raymond Zheng Mechanical Engineer Lead Engineer Joseph RojanoMechanical Engineer Secretary Katie BentleyMechanical Engineer Engineer Lori LiebmanMechanical Engineer Engineer

4 Create test rig & procedure for scale testing No current test rig for arborloo Simulate Type I hurricanes Measure wind speed, forces Create test procedure for full size testing Recommendations for future design of arborloos PROJECT STATEMENT

5 CUSTOMER REQUIREMENTS Customer Need #ImportanceDescription CN19Demonstrate reliability and repeatability CN29Simulate wind speeds and forces of a Class 1 hurricane CN39Protect users and bystanders while testing CN49Protect other infrastructure and equipment from damage CN53Allow for different shapes and materials to be tested and compared CN63Allow for different weights and centers of gravity to be tested and compared CN71Utilize existing equipment while keeping current set-ups intact CN83Be creative in a manner for compact storage CN93Provide easy to read instructions on how to assemble and use in a safe manner CN103Is low cost (Budget <800) CN111Can be set up by 2 people CN121Can be set up and taken down quickly CN131Long lifespan CN149Be able to withstand projectile due to hurricanes

6 ENGINEERING REQUIREMENTS Spec Number SourceSpecificationDirection Units of Measure Marginal Value Ideal Value S1CN1, CN2Fluid speed rangemaximizemph3095 S2CN1, CN2Record time rangemaximizeminutes1360 S3CN1, CN2 Measure range of forces at base/tie downs maximizeNewtons40300 S5CN8Storage volumeminimizem^2tbd S6CN12Set up time of test rigminimizemin4020 S7CN11Required technicians to set upminimizepersons42 S8CN3, CN4 Safely contain all flying debris that may occur maximizepercent of mass90100 S9CN10Cost of entire systemminimize$ S10CN10Cost of most expensive componentminimize$ S11CN13Lifespan (hours of operation)maximizeyears210 S12CN9 Percent of students that can safely assemble the test rig maximizepercent85(for now)100 S13CN14,CN2Measure range of forces of projectilesmaximizeNewtons40300 S14CN5Size/shape compatibilitymaximizem^215 S15CN6Weight compatibilitymaximizeNewtons40150 S16CN7Can use existing RIT equipmentbooleann/aFALSETRUE

7 HOUSE OF QUALITY Most Important Requirements Safely contain all flying debris that may occur (15.8%) Measure forces at base/tie downs(11.2%) Record fluid speed range (11.0%)

8 FUNCTIONAL DECOMPOSITION

9

10 FUNCTIONAL DECOMPOSITION

11 FUNCTIONAL DECOMPOSITION

12 MORPHOLOGICAL CHART

13 MORPHOLOGICAL CHART Our ideas for the test environment were not feasible and we needed to do in depth concept generation

14 Information about wind pressure at various points of "yaw“ Modeling equations and data that can be modified to apply Up to 50mph, gives us some data points to compare BENCHMARKING

15 BENCHMARKING

16 Important point of "critical wind speed“, speed at which forces overcome the static friction which leads to failure BENCHMARKING

17 PROCESS MAP

18 SYSTEM ARCHITECTURE

19 RIT Wind Tunnel CONCEPT GENERATION: EXISTING EQUIPMENT Scale Speeds – 1/6 Model Required Wind Tunnel fluid speed: ~570 mph Wind tunnel maximum fluid speed: ~120 mph Using a model that’s one sixth as small, Mimicked wind speed: ~20 mph ~40 mph for a 1/3 model

20 RIT Tow Tank CONCEPT GENERATION: EXISTING EQUIPMENT Scale Speeds – 1/6 Model Required Tow Tank fluid speed: ~40.5 mph Tow Tank maximum fluid speed: ~2.2 mph Using a model that’s one sixth as small, Mimicked wind speed: ~5.2 mph ~10.5 mph for a 1/3 model

21 CONCEPT GENERATION: CIRCULAR TOW TANK

22 Maximum of 30 hp engine is feasible within our budget Assuming 10 ft track and 1/3 scale Power=30 hp=22,370 N*m/s Power=156.8*v 3 Max Velocity=5.22 m/s ~ 60% of desired speed Max simulated speed= 57 mph Max Feasible Simulated Wind Speed: Assuming 10 ft diameter track 1/3 Scale: Water speed= 8.7 m/s Drag Force= 11,868 N Power 8.7 m/s=103,251 N*m/s Horsepower Needed= 138 hp 1/6 Scale: Water speed= 17 m/s Drag Force= 11,282 N Power 17 m/s=191,794 N*m/s Horsepower Needed= 257 hp Simulating 95 mph Wind Speed (42.47m/s ) : CONCEPT GENERATION: CIRCULAR TOW TANK

23 CONCEPT GENERATION: WATER PUMPS

24 Areas that need to be covered: – 1/3 model - 186,050mm^2 – 1/6 model – 46513mm^2 The areas needed to are too small and too many pumps would be needed to cover the area of each model – Number of pumps needed: 1/3 model – 447 pumps 1/6 model – 284 pumps Simulating 95mph (42.47m/s) CONCEPT GENERATION: WATER PUMPS Reynold’s number of a full size model is approximately 5.5*10^6 – ρ=1.225kg/m^3, V=42.47m/s, L=1.83m, μ=1.73*10^-5Ns/m^2 Velocity of a model 1/3 the size in water is 8.07m/s – ρ=1000kg/m^3, L=0.61m –, μ=8.94*10^-4Ns/m^2 Velocity of a model 1/6 the size in water is 16.13m/s – ρ=1000kg/m^3, L=0.305m, μ=8.94*10^- 4Ns/m^2 If a pump has a volumetric flow rate of 50gpm ( m^3/s) – V = 8.07m/s: A = 390mm^2 – V = 16.13m/s: A = 195mm^2

25 1/3 model: gpm pumps x $ = $60, /6 model: gpm pumps x $ = $38, CONCEPT GENERATION: WATER PUMPS

26 CONCEPT GENERATION: TOW TANK HYBRID Equations

27 CONCEPT GENERATION: TOW TANK HYBRID Required power obviously not feasible If v = 40mph, Vreq = 7.36m/s Fd = 2145N Preq = ~21hp Maximum testable wind speeds would be around 50mph with a 30hp engine assuming 2m/s lazy river velocity Simulating 95mph (42.47m/s) 1/6 Scale Required velocity of the system to be ~17.5m/s Drag force would be ~ N Required motor would need to be ~250hp 1/3 Scale Required velocity of the system to be ~8.75 m/s Drag force would be ~12124N Required motor would need to be ~140hp

28 1/3 model: ~140hp → Chrysler ECC 2.0L I4 (150hp) ~$600 Commonly found in Dodge Neons 1/6 model: ~250hp → Nissan VQ35DE 3.5L V6 (286hp) ~$1500 Commonly found in Infiniti G35 or 350Z 40mph winds: ~21hp → Small engine (25hp) ~$550 CONCEPT GENERATION: TOW TANK HYBRID

29 CONCEPT GENERATION: PISTON

30 What if we could replicate the aerodynamic force felt by the wind with just pressure? Main downside is there is no longer an aerodynamic effect CONCEPT GENERATION: PISTON Scale Speeds – 1/6 th Model Required Piston Force: ~830 lbs. Required Piston Pressure: ~12psi Using a model that’s one sixth as small, Mimicked wind speed: ~95 mph

31 CONCEPT SELECTION- 1 ST ITERATION

32 CONCEPT SELECTION-2 ND ITERATION

33 RISK ANALYSIS

34 PROJECT PLAN

35 Select scale model testing concept Expand design for selected concept Create test plan Acquire necessary test equipment Contact area specialists MOVING FORWARD

 Team Introductions  Project Statement  Customer & Engineering Requirements  Functional Decomposition  Morphological Chart  Benchmarking  Concept Generation & Selection  Risk Analysis  Project Plan SUMMARY 36

37 QUESTIONS?