SPS and LHC Transverse Feedback Parameter Extraction: An Alternative Approach G. Kotzian, D. Valuch LBOC, 08. December 2015 https://indico.cern.ch/event/467428/

Slides:



Advertisements
Similar presentations
M.Gasior, CERN-AB-BIBase-Band Tune (BBQ) Measurement System 1 Base-Band Tune (BBQ) Measurement System Marek Gasior Beam Instrumentation Group, CERN.
Advertisements

8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Development of a Chromaticity measurement application using Head-Tail phase shift technique.
IU e-Cloud Feedback Workshop March 13, 2007 LA-UR Review of the e-p feedback experiments Rod McCrady Los Alamos National Lab.
Observations with the Transverse Damper at High Intensities G. Kotzian for the Damper Team BE-RF-FB, 23. February 2015LIU-SPS intermediate internal scrubbing.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Impedance measurements at SLS E. Koukovini-Platia CERN, EPFL TIARA mid-term meeting, Madrid, 13 th June 2012 Many thanks to M. Dehler, N. Milas, A. Streun.
“What you get” Transverse damper system (ADT) F. Dubouchet W. Höfle G. Kotzian D. Valuch Special thanks to: A. Boucherie, A. Butterworth, S. Calvo, G.
AC dipole for LHC Mei Bai Collider Accelerator Department Brookhaven National Laboratory.
W. LHC Studies WG Day Review MDs Transverse Damper from Run1 to Run2 reported by W. Hofle for ADT & friends LHC MSWG Special Meeting.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, N.Kazarinov.
March 2, 2007ELC Experience with clearing voltages and solenoids at SPS damper pick-ups W. Hofle Acknowledgements PS-OP, SL-OP, SL-BI LHC-VAC, SL-HRF.
M.Gasior, CERN-BE-BIBE-KT Innovation Day, 3 June Base Band Tune (BBQ) measurement systems - observing beam oscillations with sub-micrometre amplitudes.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Basic BPM Hardware Theory Jim Steimel. Wall Current Charge in a cylindrical perfectly conducting pipe produces an equal and opposite image charge at the.
Elias Métral, APC meeting, 02/02/2006 1/35 E. Métral, G. Arduini and G. Rumolo u Observations of fast instabilities in the SPS (1988 and 2002/3) and PS.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Mathilde FAVIER Fellow in BE/BI/QP Mathilde FAVIER BE/BI-QPSCHOTTKY STATUS - BI DAY - December 6th
RF Cavity Simulation for SPL
Luminosity expectations for the first years of CLIC operation CTC MJ.
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
Summary of Booster Dampers Systems Dave McGinnis December 7, 2010.
ADT re-commissioning after LS1 A. Butterworth, W. Höfle, F. Killing, G. Kotzian, T. Levens, D. Valuch with many thanks to BE/OP LBOC, ADT re-commissioning.
Status from the collimator impedance MD in the LHC Collimation team:R. Assmann, R. Bruce, A. Rossi. Operation team:G.H. Hemelsoet, W. Venturini, V. Kain,
Interplay of transverse damper and crab cavities W. Hofle BE/RF/FB W. Hofle, 4th Crab Cavity Workshop16-Dec-10 Acknowledgements: RF group, G. Arduini,
ADT Tune Measurement F. Dubouchet, W. Hofle, D. Valuch Acknowledgement: R. Calaga, F. Roncarolo, E. Bravin, shift crews New developments and tests on August.
● 08h00: Adjust mode for end-of-fill study. Scraping test for determining transverse beam profile (beam 2, vertical). As expected, beam dumped with BLM.
CERN F. Ruggiero Univ. “La Sapienza”, Rome, 20–24 March 2006 Measurements, ideas, curiosities beam diagnostics and fundamental limitations to the performance.
Random ideas for discussion. Logging/storage We need to decide on the list of required variables to log and analyze for each fill For each variable, we.
SPS Transverse Damper with Crab Cavities G. Kotzian, W. Hofle BE-RF-FB, 11. January 2016 Crab Cavity SPS Tests Day I
Elias Métral, LHC Beam Commissioning Working Group meeting, 30/11/2010 /241 PRELIMINARY FINDINGS FROM INSTABILITY MEASUREMENTS DURING THE 75ns AND 50ns.
Shortened program (2 days), as decided in LMC. MD program worked very well  all MD’s on plan with ~foreseen beam time. LHC in very good shape with excellent.
Coupled-bunch oscillation feedback studies 1 H. Damerau LIU-PS Working Group Meeting 20 February 2013 Many thanks to R. Garoby, S. Gilardoni, S. Hancock,
Experience and Perspectives of Transverse Feedback Systems for Scrubbing Thanks to: SPS OP crew and colleagues from BE-ABP and BE-RF, for their support.
LHC transverse Damper Observations versus expectations W. Hofle BE/RF/FB CERN BE-RF team for ADT L. Arnaudon, P. Baudrenghien, A. Butterworth, G. Cipolla,
F. Caspers, S. Federmann, E. Mahner, B. Salvant, D. Seebacher 1.
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
LHC 8 & 9 May :10: Injection kicker B1 faulty on oil level –Check in UA and RA. Leaks fixed, to be further checked in TS1 10:30: Pre-cycle started.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Three examples of application of Sussix 1)Data from simulations  sensitivity 2)Data from measurements  frequency resolution.
ADT kickers and amplifiers in tunnel point 4 of LHC, RB44 and RB46 1 W. Hofle LHC Transverse Damper LARP CM20 Napa April 8-10, 2013 LHC Transverse Damper.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
ADT Post-LS1 16 Dec 2015 Evian 2015 / ADT Post-LS1 – G. Kotzian G. Kotzian, W. Hofle, D. Valuch Special thanks to: L. Arnaudon, A. Boucherie, A. Butterworth,
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Longitudinal Limitations of Beams for the LHC in the CERN PS 0.
W. Hofle / March 5, 2008 Extended LTC meeting 1/22 Acknowledgements: P. Baudrenghien, A. Butterworth, E. Ciapala, B. Goddard, A. Koschik, F. Killing, G.
RF acceleration and transverse damper systems
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
The SPS Transverse Damper
LEIR IMPEDANCE AND INSTABILITY MEASUREMENTS
Excitation by ADT and active bunch-by-bunch tune measurements
Update on single-collimator impedance measurements using ADT data
Summary of the dedicated MD on July 4th 50ns in SPS with nominal and low γt optics – transverse aspects T. Argyropoulos, H. Bartosik, T. Bohl, A. Burov,
ADT and ObsBox in 2016 W. Hofle, M. Jaussi, G. Kotzian, S. Rains,
Saturday 21st April 00:33 Interlock during ramp on BLM HV
LHC injection W. Bartmann, M.J. Barnes, C. Bracco, F. Burkart, E. Carlier, B. Goddard, V. Kain, R. Steerenberg, L. Stoel, F. Velotti, C. Wiesner, C. Xu.
Summary Friday h38: Ramp down and pre-cycle.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
M. Mehler1), H. Klingbeil1), B. Zipfel2)
Monday 18 October : Collimation system
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
MD#4 Progress MD Coordinators: Giulia Papotti, Frank Zimmermann
SPS Transverse Damper System
Limits on damping times
Check of filamentation time with octupoles on and damper off
LHC Morning Meeting - G. Arduini
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Daniel, Gianluca and Belen (for the Collimator team)
Presentation transcript:

SPS and LHC Transverse Feedback Parameter Extraction: An Alternative Approach G. Kotzian, D. Valuch LBOC, 08. December This is an internal CERN publication and does not necessarily reflect the views of the CERN management. 08. Dec 2015 LBOC / Feedback parameter extraction: an alternative approach – G. Kotzian

Background 08. Dec 2015 LBOC / Feedback parameter extraction: an alternative approach – G. Kotzian

Kicker Beam Transfer Function - BTF 2 Beam Position Module SUM Signal Processing Unit BPM Power Amp 2.5ns Bunches BBQ Vector Network Analyzer sinusoidal drive signal sinusoidal return signal Sinusoidal excitation: - const. power - swept frequency “The response of a beam to small […] transverse excitation defines its ‘Beam Transfer Function’ (BTF).” [1] [1] J. Borer, G. Guignard, A. Hoffmann, E. Peschardt, F. Sacherer and B. Zotter, “INFORMATION FROM BEAM RESPONSE TO LONGITUDINAL AND TRANSVERSE EXCITATION”, in IEEE Transactions on Nuclear Science, Vol. NS-26, No. 3, June Dec 2015 LBOC / Feedback parameter extraction: an alternative approach – G. Kotzian RXTX dB(RX/TX) frequency

Beam Transfer Function: Interpretation 3 Classical method with VNA (Vector Network Analyzer) − VNA excites transverse resonances (sinusoidal excitation) − Narrowband response recorded per frequency, i.e.  Eigenvalues {Magnitude(freq), Phase(freq)} − {Mag(freq), Phase(freq)} represented as POLAR plot Feedback phase and loop delay adjusted – mostly iteratively − Repeated over several frequency bands KNOB 1KNOB Dec 2015 LBOC / Feedback parameter extraction: an alternative approach – G. Kotzian

SPS’15: Semi-Auto Parameter Extraction (1) 4 o basis is the classical method with VNA(s) automation with scripts automatic data collection o Measure OL 1 MHz to 20 MHz (here: Meas39, BPCR.221.V  V2) 20 sweeps x SC period … min o Post-processing allows parameters to be extracted, e.g. Phase advance PU  Kicker Feedback COARSE + FINE delay Fractional Tune Loop phase response  Loop STABLE ( MHz) Note: measurement time >>15 min, not too practical for quick diagnostics PRELIMINARY (Meas /11/04) Open loop response (polar): 08. Dec 2015 LBOC / Feedback parameter extraction: an alternative approach – G. Kotzian

Fractional Tune 5 Open loop response: Mag(f) dB peak(Mag(f)) : Overlay of 20 measurements: from 1 MHz to 20 MHz Feature extraction: blue = q green = (1-q) PRELIMINARY (Meas /11/04) Useful tool for full-blown analysis… 08. Dec 2015 LBOC / Feedback parameter extraction: an alternative approach – G. Kotzian

Motivation Beam transfer function measurements for ADT: Carried out: − per beam = [B1, B2] − per plane = [HOR, VER] − per pickup = [Q7, Q9] + [Q8, Q10] (in 2016) − frequency bands = [0.5, 1.0, 2.0, 4.0, 8.0, 10.0, 15.0, 20.0] MHz  4 PUs x 2 planes x 2 beams = 16 units to be set-up (in 2016) Current method is rather time consuming − 20 measurements [ MHz] − 2..3 min/measurement  approx. 1 h per unit = 16 hours in total “Destructive”  sweeps are [moderately] exciting betatron resonances Requires minimum intensity (i.e. several bunches) for the VNA to accurately resolve signal Result depends on − Machine parameters and beam configurations (tunes, chromaticity, octupole settings, etc.) − Instrument setup − Expertise or “interpretation skills” to read these VNA curves … The SPS damper, with at least 40 cycles created and/or maintained during the run would as well benefit from an alternative method. 08. Dec 2015 LBOC / Feedback parameter extraction: an alternative approach – G. Kotzian

Transverse Feedback Parameter Extraction THE QUEST: “Define method to extract feedback parameters.” condition #1 -- SIMPLE (*) condition #2 -- FAST (*) condition #3 -- NON-DESTRUCTIVE (*) (*) with respect to classical method using VNA Objective:Ultimately we were looking for the universal answer to the question: “Can you please check if the damper is working … ?” 08. Dec 2015 LBOC / Feedback parameter extraction: an alternative approach – G. Kotzian

Outline o An alternative approach - the method: Reconstructing transverse phase space Filter kernels: time domain signal processing o Passive Observation  during injection processes Injection damping Fractional tune o Active Excitation Feedback phase Feedback delay o Potential for offline and online analysis LHC Injection kicker waveform SPS Extraction kicker waveform Advanced Feedback Controller 08. Dec 2015 LBOC / Feedback parameter extraction: an alternative approach – G. Kotzian This presentation is not aimed at finding correct feedback parameters. --- It rather tries targeting on providing an efficient/ op(era)tional tool.

Transverse Phase Space 08. Dec 2015 LBOC / Feedback parameter extraction: an alternative approach – G. Kotzian POSITION SLOPE xnxn x n+1 2πq2πq Analytic signal (time domain = complex valued): Z n = x n + i y n = A n exp(jα n ) Z n+1 = x n+1 + i y n+1 = Z n r exp(j2πq) Z n = A n exp(j2πq * n + φ 0 ) In general: “damping”, “decoherence” fractional tune “feedback phase” Decay factor r: r < 1 … stable r > 1 … unstable r = 1 … steady Need to know also y n …

Phase Space Reconstruction 08. Dec 2015 LBOC / Feedback parameter extraction: an alternative approach – G. Kotzian Phase Shift 1 Phase Shift 2 Analytic signal (complex valued time sequence):

Filter Kernels 08. Dec 2015 LBOC / Feedback parameter extraction: an alternative approach – G. Kotzian

08. Dec 2015 LBOC / Feedback parameter extraction: an alternative approach – G. Kotzian Time domain …

Damping Times per bunch [1] “EMITTANCE GROWTH AT LHC INJECTION FROM SPS AND LHC KICKER RIPPLE“, G. Kotzian, EPAC’08, 2008 Witness bunches low gain  inc. damping Trains with 72 bunches/batch, nominal gain  nom. damping Factor 2 between bunches in the centre an the edge of trains > 12 bunches B2 All bunches excited coherently during one turn. Transverse deflection by ADT << 1 mm.  expected blow-up less than 1 %. Damper was originally designed to counteract maximum injection errors of 3.3sigma corresponding to 4 mm at beta=185m, with an estimated emittance blow-up better than 2% [1]

Pathological Case: Over-Damping 08. Dec 2015 LBOC / Feedback parameter extraction: an alternative approach – G. Kotzian [1] “TOO MUCH LOVE WILL KILL YOU”, Queen, in ‘Made in Heaven’, 6 Nov See also: “MARGINS TO INCREASE ADT GAIN AT INJECTION”, W. Hofle, LBOC 49, 6 Oct

08. Dec 2015 LBOC / Feedback parameter extraction: an alternative approach – G. Kotzian Initial condition

Witness bunches Fractional Tune per Bunch 08. Dec 2015 LBOC / Feedback parameter extraction: an alternative approach – G. Kotzian Trains with 72 bunches/batch, nominal gain  nom. damping All bunches excited coherently during one turn. B2

Kick by ADT: Feedback Phase (1) 08. Dec 2015 LBOC / Feedback parameter extraction: an alternative approach – G. Kotzian Initial condition NB: bunch3 oscillating in counter-phase due to bipolar excitation waveform (kick) All bunches excited coherently during one turn. The kick waveform in use is a bipolar pulse (50% duty cycle) for DC suppression.

Kick by ADT: Feedback Phase (2) 08. Dec 2015 LBOC / Feedback parameter extraction: an alternative approach – G. Kotzian Values in GRAD. Measured for injection tunes. This list is not exhaustive. H1B1V1B1V2B1H1B2V2B2 Q7Q9Q7 Q9Q7Q Feedback Phase as measured with transverse kick and analyzed in time domain (26-Jun-2015, injection tunes): H1B1V1B1V2B1H1B2V2B2 Q7Q9Q7 Q9Q7Q Feedback Phase as set up (26-Apr-2015, injection tunes): To be noted: 28 measurements < 10 min (!) Values in GRAD. Measured for injection tunes. This list is not exhaustive.

Kick by ADT: Loop Delay (1) 08. Dec 2015 LBOC / Feedback parameter extraction: an alternative approach – G. Kotzian Batches of 24 bunches COSINE, or in-phase term N = 2 periods per revolution ADTmDSPUVerM2B1 Acquisition date: 26-Jun :48: SINE, or quadrature term N = 2 periods per revolution ADTmDSPUVerM2B1 Acquisition date: 26-Jun :50: Two consecutive measurements: 1)COSINE, N periods per revolution, 1 turn excitation + record oscillation 2)SINE, N periods per revolution, 1 turn excitation + record oscillation

Loop Delay (2) 08. Dec 2015 LBOC / Feedback parameter extraction: an alternative approach – G. Kotzian DELAY ADTmDSPUVerM2B1 Acquisition date: 26-Jun :48: Jun :50: Measurement and analysis: 1)COSINE, N periods per revolution, 1 turn excitation + record oscillation 2)SINE, N periods per revolution, 1 turn excitation + record oscillation 3)Polar plot of data in the same turn  Loop Delay 0

COARSE Loop Delay 08. Dec 2015 LBOC / Feedback parameter extraction: an alternative approach – G. Kotzian ADTmDSPUVerM2B1 Acquisition date: 26-Jun :48: Jun :50:  Coarse Delay OK For this measurement N=2. By increasing N, i.e. the number of excitation periods per revolution the time resolution can be further refined.  FINE DELAY

FINE Delay Measurement (1) 08. Dec 2015 LBOC / Feedback parameter extraction: an alternative approach – G. Kotzian If we excite with N = 891 then every other bunch should be kicked, i.e. 10 MHz (Note that the excitation frequency is locked to the RF frequency/10 or 40 MHz): However: increasing N results in a reduced excitation due to limited BW of the ADT power amplifier + kicker (fc = 1 MHz). COSINE, or in-phase term N = 891 periods per revolution:  Exciting EVEN bunch numbers SINE, or quadrature term N = 891 periods per revolution:  exciting ODD bunch numbers  The combination of the two results in a 4-QAM, a.k.a. QPSK

FINE Delay Measurement (2) 08. Dec 2015 LBOC / Feedback parameter extraction: an alternative approach – G. Kotzian Evaluate the damping evolution:  During the damping the excitation pattern (SIN + COS) is preserved Shown in this example are the subsequent 25 turns after excitation with N=2 Oscillation damping after excitationFootprint (I/Q) ADTmDSPUVerM2B1 Acquisition date: 26-Jun :48: Jun :50:

FINE Delay Measurement (3) 08. Dec 2015 LBOC / Feedback parameter extraction: an alternative approach – G. Kotzian  Make use of information content in subsequent decay turns Subsequent turns after excitation with N=891 (10 MHz) Each circle = average over 72 bunches Results of two Pickups (blue Q7, red Q9) ADTmDSPUVerM1B1 Acquisition date: 26-Jun :10: Jun :50:

Potential for offline analysis 08. Dec 2015 LBOC / Feedback parameter extraction: an alternative approach – G. Kotzian Injection steering Incoming batch 12x2 bunches (Ions) Circulating bunch being “tickled” at injection Reconstructed transverse phase space at MKI as seen by the damper:

Potential for offline analysis 08. Dec 2015 LBOC / Feedback parameter extraction: an alternative approach – G. Kotzian “LHC COMMISSIONING STATUS – MKI”, L. Stoel et.al., LHC Injection and Beam Dump Meetings (LIBD), 9 June 2015 Injection steering

08. Dec 2015 SPS  LHC BEAM1 SPS  LHC BEAM2 SPS Extraction B1 LHC Injection B1 SPS Extraction B2 LHC Injection B2 FOR DISCUSSION LBOC / Feedback parameter extraction: an alternative approach – G. Kotzian

Advanced Feedback Controller 08. Dec 2015 LBOC / Feedback parameter extraction: an alternative approach – G. Kotzian POSITION SLOPE xnxn x n+1 2πq2πq TUNE LINE Kick 1 Kick 2 "So much for theory.“  SPS Test bed 2016

Summary and Conclusions Alternative method for feedback parameter extraction − Single transverse excitation, generated by ADT − Data acquisition provided by ADT BeamPos Modules − Analysis carried out solely in time domain – no FFT-ing − Impact on emittance marginal Tests can be carried out as routine health checks − Measure all PUs at once (notifications scheduled in parallel) Ready-to-use for ObsBox data processing (single PU) Allows data processing for − Feedback parameters (gain, phase, delay) − Beam parameters (tune, damping time/decoherence time) − Kicker waveforms (SPS extraction / LHC injection kickers) Novel ideas for alternative feedback controllers − New inputs: tune, oscillation amplitude, phase advance 08. Dec 2015 LBOC / Feedback parameter extraction: an alternative approach – G. Kotzian

THANK YOU 03. Dec 2015 SPS Damper - Gerd Kotzian30 Questions? Many thanks to: W. Hofle, E. Jensen, V. Kain, M. Kuhn, F. Velotti, for fruitful discussions