Central Valley Flood Protection Board Meeting – Agenda Item No. 8A Informational Briefing Presented By Board Staff and CH2MHill Consultants Model Funded.

Slides:



Advertisements
Similar presentations
18 October 2012 WATERSHED Science & Engineering WEST Consultants Chehalis River Basin Hydraulic Modeling and Flood Relief Alternatives Evaluation.
Advertisements

Central Valley Flood Protection Board Meeting – Agenda Item No. 5C Central Valley Flood Protection Board.
ENVIRONMENTAL UNIT IN AN ICS STRUCTURE. EU Mission Statement The Environmental Unit is established to provide technical and scientific expertise and capabilities.
15 March 2012 WATERSHED Science & Engineering WEST Consultants.
Metropolitan Council Environmental Services A Clean Water Agency Presented to the Environment Committee November 9, 2010 Information Item Master Water.
Draft Action Plan Update – Agenda Item No. 5D Central Valley Flood Protection Board.
Council Bluffs Value Engineering Workshop
Central Valley Flood Protection Board Meeting – September 27,
TRLIA Certification of Environmental Impact Report and Selection of Project for Feather River TRLIA Board Meeting: February 6, 2007 Briefer: Paul Brunner,
Agenda Item 9 Sutter Bypass CVFPB Meeting April 17, 2009.
California’s Central Valley Flood System Improvement Framework California Levees Roundtable March 27, 2009 California Levees Roundtable March 27, 2009.
Hydraulic Screening and Analysis Needed for USACE Review
Acquisition of Flood Control Easements Triangle High-Ground Area City of West Sacramento, Yolo Co. Meeting of the Central Valley Flood Protection Board.
Nam Songkhram model application and field work National consultation with TNMC 20th of April 2006, Bangkok MRCS WUP-FIN.
Briefing to the Central Valley Flood Protection Board on Status of the FCSA July 12, 2013 Central Valley Integrated Flood Management Study.
1 Delta Levees Investment Strategy Delta Stewardship Council Central Valley Flood Protection Board Levees Workshop July 10, 2015.
Proposed Benefit Assessment District Overview Three Rivers Levee Improvement Authority (TRLIA) TRLIA.ORG March 10,
Three Rivers Levee Improvement Authority (TRLIA) Briefer: Mary Jane Griego, TRLIA Board Member Three Rivers Levee Improvement Authority March, 2007.
Unimpaired connectivity between active channel and floodplain Eliminated connectivity between active channel and floodplain Impaired connectivity between.
Department of Water Resources California Levee Database (CLD) An ongoing Initiative to Collect and Catalog Data for California’s Levees and Flood Control.
Central Valley Flood Protection Board Meeting – December 20,
Central Valley Flood Protection Board August 9, 2013 Presented by: Michael Mierzwa California Department of Water Resources DWR’s Involvement in Flood.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines January 19, 2010 Daniel Hall, Solid Waste Section Chief.
CALIFORNIA DEPARTMENT OF WATER RESOURCES Preparations for Flood Season DFM Flood Maintenance Office Presented By: Noel Lerner, Former Chief Flood.
Integrated Regional Watershed Management Plan Presentation – March 12, 2013 HLVRCD.
North Carolina CTS Committee Meeting #4 January 16, 2001.
Hydraulic and Hydrologic Considerations in Planning Course FLOOD RISK MANAGEMENT Chuck Shadie Mississippi Valley Division.
September 4, 2012 California Department of Water Resources Central Valley Floodplain Evaluation and Delineation (CVFED) Program Presented for the FMA 2-D.
Briefing to the Central Valley Flood Protection Board June 28, 2013 Status of State-Led Basin-Wide Feasibility Studies.
WATERSHED INVENTORY AND ASSESSMENT Module 7, part A – Issues and Description.
August 28, 2015 Meeting of the Central Valley Flood Protection Board Dave Wheeldon, Chief Flood System Sustainability Branch FMO, Division of Flood Management.
PROSPECT ISLAND RESTORATION& THE FISH RESTORATION THE FISH RESTORATION PROGRAM AGREEMENT Dan Riordan Department of Water Resources.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Assembly Bill Local Agency Annual Summary Report Flood Project Integrity & Inspection Branch Division of Flood Management Hydrology and Flood.
Central Valley Flood Protection Board Meeting – Agenda Item No. 6B APPLICATION NO
September 23, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council 1.
Melinda Terry, Executive Director CA Central Valley Flood Control Association 1.
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
Presented to: Central Valley Flood Protection Board August 23, 2013 Sacramento Area Levee Accreditation Key Results from Encroachment Analysis.
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
Central Valley Flood Protection Board November Board Meeting Understanding the Sacramento River Valley Before Levees and Dams René Leclerc, P.E. Central.
Tracey Ferguson Project Manager, Integrated Water Resources ATKINS.
1 September 13, 2007 North-of-the-Delta Offstream Storage ACWA Regions 9 and 10 Carlsbad Water Summit North-of-the-Delta Offstream Storage ACWA Regions.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
Central Valley Flood Protection Board Meeting – Agenda Item No. 7D Methylmercury Open Water Workplan.
1 Delta Levees Investment Strategy Delta Levees Investment Strategy Delta Plan Implementation Committee Cindy Messer, Deputy Executive Officer, Planning.
2 West Sacramento, California Project General Reevaluation Report Letter of Support for the West Sacramento General Reevaluation Report Agenda Item 4G:
Central Valley Flood Protection Board October 25, 2013 Presented by: Michael Mierzwa, P.E. Chief of the FloodSAFE Program Management Office California.
2 American River Common Features General Re-evaluation Report Request for Board Approval of Letter Requesting Consideration of Locally Preferred Plan (LPP)
CVFPB Executive Committee Meeting – Agenda Item No. 8A Central Valley Flood Protection Board.
1 Economic Analysis Steven Blum Alan T. Monji Environmental Scientist Region 9.
CVFPB Executive Committee Meeting – Agenda Item No. 4C Central Valley Flood Protection Board.
The Sustainable Groundwater Management Act and DWR’s Role in Sustainable Groundwater Management California Irrigation Institute 2016 Conference January.
APPLICATION NO LEVEE DISTRICT No. 1 Of SUTTER COUNTY STAR BEND SETBACK LEVEE SUTTER COUNTY April 17, 2009.
Fish Migration Improvement Opportunities in CVFPP Conservation Strategy Planning Areas Department of Water Resources A. Marc Commandatore Senior Environmental.
A Framework for Assessing Needs Across Multiple States, Stakeholders, and Topic Areas Stephanie Wilkerson & Mary Styers REL Appalachia American Evaluation.
Experience ∙ Innovation · Results CALCASIEU PARISH – SABINE RIVER AND BAYOU LACASSINE BASINS STORMWATER MASTER PLAN Engineers ∙ Surveyors · Environmental.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
EASTERN MUNICIPAL WATER DISTRICT San Jacinto Groundwater Basin Numerical Flow Model Update Brian Powell Director of Planning March 17,
Yolo Bypass Salmonid Habitat Restoration & Fish Passage Environmental Impact Statement Environmental Impact Report Information Presentation to YBFEPT July.
June 24, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council.
June 13, 2013 Presented by: California Department of Water Resources Flood Management Programs Status and Interactions.
Sustainable Management in the Lower American River
Planning & Environmental Compliance HYDRAULIC MODELING UPDATE
Presented By: Fran Borcalli, P.E. Program Manager
9/16/2018 The ACT Government’s commitment to Performance and Accountability – the role of Evaluation Presentation to the Canberra Evaluation Forum Thursday,
Ten Tribes Partnership Tribal Water Study
Hydraulics Updates to the IndianaDesign Manual
Sacramento Environmental Commission January 2019.
Presentation transcript:

Central Valley Flood Protection Board Meeting – Agenda Item No. 8A Informational Briefing Presented By Board Staff and CH2MHill Consultants Model Funded by CVFPB, DWR, USF&WS March 22, 2013

Central Valley Flood Protection Board Meeting – Agenda Item No. 8A  Board Resolutions in 2008 and 2009 established initial goals  Analysis of carrying capacity of the “1957 design flow”  What capacity existed in 1950’s?  What capacity exists today?  Impact of the Sutter National Wildlife Refuge (SNWR) on capacity  Model type, geographic extent, boundary conditions  Development, calibration and verification  Initial conveyance and freeboard results for “1957 design” flows  How has available freeboard at 1957 flows changed since the 1950s?  Sensitivity runs demonstrate capabilities for CVFPP Regional and Basinwide planning analyses  Final reviews to publish a User Manual, Final Report, and Technical Memo  Turnover to DWR FloodSAFE Library of Models

Central Valley Flood Protection Board Meeting – Agenda Item No. 8A  Resolution :  Work with DWR and USACE to develop model to ascertain impacts of vegetation and structures on carrying capacity  Confer with DWR and USACE to determine applicable design flows  Resolution :  Coordinate with DWR, USACE and USFWS to assess effect of SNWR on carrying capacity  Determine if stated goals of flood management and stakeholder interests are achievable in the Bypass  How does vegetation impact capacity?  Do bridges and other structures impact capacity?  Are there areas of compromised flood protection? If so what?

Central Valley Flood Protection Board Meeting – Agenda Item No. 8A  Hired CH2M HILL consultants  Assisted by MBK Engineers  Peer reviewed by David Ford Engineers  Use RMA2 2D model (USACE)  Calibrated to 2006 event  Verified against 1997 event  Evaluate capacity for a range of design conditions  1957 design profile  O&M manual flows  100-year event  200-year event  Conduct sensitivity runs to determine capabilities to evaluate a variety of potential management practices and remedial measures Feather River Sutter Buttes Yuba City YOLO BYPASS SR 20 Bridge LOWER LIMITS Sacramento River at Fremont Weir

Central Valley Flood Protection Board Meeting – Agenda Item No. 8A  Surface represented by a grid  Over 43,000 elements  Average size 1/2 acre (about 150 x 150 square feet)  Each element assigned unique characteristics  Ground cover/land use (assigned to unique friction “n” values)  Current elevation data based on CVFED LiDAR surveys (accuracy of +/- 0.3 feet)  Can modify element characteristics to evaluate c hange in land use, vegetation type, elevation, etc.

Central Valley Flood Protection Board Meeting – Agenda Item No. 8A  Allows us to simulate impacts of vegetation, land forms and structures in considerable detail

Central Valley Flood Protection Board Meeting – Agenda Item No. 8A  Allows us to simulate impacts of vegetation, land forms and structures in considerable detail  Model resolution allows assignment of site-specific features to determine localized impacts

Central Valley Flood Protection Board Meeting – Agenda Item No. 8A  Once delivered to DWR’s FloodSAFE Library of Models, it will provide a common platform to support the Basin-wide and Regional planning studies for the 2017 CVFPP update  Assess impacts of potential management actions including changes in land use, vegetation type and pattern, sediment removal, structural changes, etc.  Assess impacts of future maintenance practices  Determine if existing top of levee profiles are sufficient to achieve current and future design standards

Central Valley Flood Protection Board Meeting – Agenda Item No. 8A

SNWR (2010 land use)

Central Valley Flood Protection Board Meeting – Agenda Item No. 8A SNWR (2010 land use)

Central Valley Flood Protection Board Meeting – Agenda Item No. 8A

 Three Initial Vegetation Scenarios  2006 vegetation (baseline)  vegetation after thinning of 25 acres in the SNWR (existing conditions)  Fully vegetated condition (120 % of baseline “n” values)  A range of conditions representing various maintenance and management activities were simulated to determine model capabilities

Central Valley Flood Protection Board Meeting – Agenda Item No. 8A 3.2 feet max. reduction in WSEL. SNWR (2006 Land Use) with Vegetation Management

Central Valley Flood Protection Board Meeting – Agenda Item No. 8A 0.75 feet max reduction in WSEL SNWR (2010 Land Use) with Vegetation Management

Central Valley Flood Protection Board Meeting – Agenda Item No. 8A 0.19 feet max reduction in WSEL. SNWR (2010 Land Use) with Sediment Removal

Central Valley Flood Protection Board Meeting – Agenda Item No. 8A SNWR 1.5 feet max reduction in WSEL.

Central Valley Flood Protection Board Meeting – Agenda Item No. 8A  A robust model has been developed  Capable of evaluating changes in land use, vegetation type, sediment removal, levee and channel alignment, location and size of structures  Model results indicate that flows equivalent to the 1957 design WSEL can be conveyed by the Bypass without overtopping, but with less than the original design target of 5 to 6 feet of freeboard  Board staff will deliver the model and a final report, technical memo, and user guide to DWR’s FloodSAFE Library of Models for use by agencies, organizations and consultants  Board staff will also make documentation available on our website  Model will support the Basin wide and Regional flood planning processes to support the 2017 Central Valley Flood Protection Plan update  Board staff will inform Bypass landowners regarding the Board’s existing flowage easements

Central Valley Flood Protection Board Meeting – Agenda Item No. 8A Electronic copies of the Report and User Guide will soon be available via our website Board Staff Dr. Sungho Lee, Engineer, Water Resources (916) , David Williams, PE, Project Section Chief (916) , Eric Butler, PE, Projects and Environmental Branch Chief (916) , CH2M Hill Mark Glidden, PE (720) ,