SoLID Pre-R&D List SoLID Collaboration Meeting September 11-12, 2015.

Slides:



Advertisements
Similar presentations
General Considerations Jian-ping Chen SoLID-SIDIS Collaboration Meeting.
Advertisements

GEM Detectors for AnDY Nilanga Liyanage University of Virginia 1 Outline GEM chamber concept Large area GEM chamber projects Proposed GEM configuration.
GEM/MRPC/Chinese Collaboration
T2K – Canada Accelerator & Detector Status D. Karlen University of Victoria & TRIUMF ACOT meeting, May 12, 2007.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS7: Electronics and Data Acquisition  Overview (this talk): D. Casper  Front-end.
DCal Meeting
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS 7.2 & 7.3: Data Acquisition D. Casper (UC Irvine)
Polarized 3 He Target System Overview Design Vertical Polarization Spin-Flip Oven/Ladder/Enclosure/Access Laser/Optics/Cells Polarimetry Safety/Documents.
23 July, 2003Curtis A. Meyer1 Milestones and Manpower Curtis A. Meyer.
Overview of SoLID Jian-ping Chen, JLab SoLID Director’s Review
Wang Yi, Tsinghua University Joint meeting of HALL A and HALL C, SoLID status and Chinese contribution 1 Wang Yi Department of Engineering.
1 Ring Imaging Cherenkov Counter (RICH) Program Management Plan RICH Project Review September 5-6, 2013 Patrizia Rossi.
1 Update on GEMs (Chinese Collaboration) University of Science & Technology of China Yi Zhou SoLID Collaboration Meeting, Jlab, USA, Sep. 14 ~ Sep.15,
Proposed SoLID Organization Structure Chair EB GEM-US Magnet GEM-China Heavy Cherenkov Light Cherenkov Calorimeter Large Angle Calorimeter Forward Reconstruction/
Update on APV25-SRS Electronics Kondo Gnanvo. Outline Various SRS Electronics Status of the APV25-SRS UVa Test of the SRU with multiple.
SoLID: large acceptance, capable of handling high luminosity (up to~10 39 with baffle, up to ~10 37 without baffle)  Ideal for precision Inclusive-DIS.
Original plan for secondary line installation. Hadron hall beamlines in Phase1 Hadron hall secondary beamlines ① ② ③ ④.
Update from SoLID (Solenoidal Large Intensity Device) Zhihong Ye Duke University & SoLID Collaboration Hall-A Winter Meeting 10/09/2014.
GEM chambers for SoLID Nilanga Liyanage University of Virginia
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
GEM/MRPC/Chinese Collaboration Haiyan Gao Duke University March 25, 2011.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
Comments from Physics Division Rolf Ent Associate Director for Experimental Nuclear Physics SOLID collaboration meeting, February 03, 2012 Thomas Jefferson.
Muon trigger upgrades, missing since not aimed towards DOE funding PHENIX upgrades: view presented to DOE R&D $3.5M Construction $16.6M Au-Au p-p 200 Si-Si.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
GEM R&D Update Kondo Gnanvo. Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype  Plans.
GEM foil and Simulation work at CIAE Xiaomei Li Shouyang Hu, Jing Zhou, Chao Shan, Siyu Jian and Shuhua Zhou Science and Technology Science and Technology.
SoLID HGC Update Zhiwen Zhao,Weizhi Xiong, Gary Swift Haiyan Gao,Garth Huber 2015/09/12 1.
GEM Trackers for Super BigBite Spectrometer (SBS) in Hall JLab The Super Big Bite Spectrometer (SBS) is one of the major new equipment in hall A in.
Thia Keppel 6/4/13 Hall A Update. Near term accelerator schedule – same as last meeting Accelerator Run II: Beam in hall 3/2014, or maybe as early as.
HBD Update (brief!) TK Hemmick. Spring Test: VERY few tracks  Avoiding the shadow of the local beam dump and other obstacles moved HBD out to about 40.
1 Collaboration Meeting JLAB January 2008 Project Status Update E.C. Aschenauer.
Overview of SoLID Jian-ping Chen, JLab SoLID Collaboration Meeting July 9-10, 2014.
Kondo GNANVO University of Virginia (UVa) Update on GEM Activities for the 12 GeV Program in Hall A at JLab.
Vina Punjabi Norfolk State University Hall A Collaboration Meeting June 10-11, 2010 GEp-V Experiment to Measure G Ep /G Mp.
SoLID review DAQ recommendations Alexandre Camsonne.
Overview of SoLID Jian-ping Chen, JLab SoLID Collaboration Meeting Nov. 7-8, 2014.
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  WBS’s  WBS 1  Funding profile  Schedule  Critical.
Early Career Internal Review Upgrade and development for calorimetry for Deeply Virtual Compton Scattering Alexandre Camsonne November 18 th 2011 VI. Nuclear.
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  Schedule  Funding profile  Risk management  EH&S.
StatusUpdate Jian-ping Chen, JLab SoLID Collaboration Meeting September 11-12, 2015.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Modifying the PMP (remove some GEM’s add a scintillator coordinate detector) -JJL (8/29/2012)
The 12 GeV equipment Hall D – Hall D – GLUEx detector for photoproduction experiments Hall B – Large acceptance detector CLAS12 for high luminosity measurements.
Front Tracker: main technical solutions 40x50 cm 2 module Front Tracker Chamber: 40x150 cm 2  Use COMPASS approach: 3xGEM, 2D readout - one significant.
SoLID DAQ A.Camsonne SoLID collaboration meeting November 8 th 2013.
GEM R&D updates from Chinese groups Yuxiang Zhao University of Science and Technology of China May 24,
Status of KOPIO Subsystems 2005 RHIC & AGS Users ’ Meeting Brookhaven National Laboratory June 20, 2005 Steve Kettell.
Uva GEM R&D Update –Part I Kondo Gnanvo, Nilanga Liyanage, Vladimir Nelyubin, Kiadtisak Saenboonruang, Taylor Scholz and Adarsh Ramakrishnan In Collaboration.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
Update/Overview of SoLID Jian-ping Chen, Jefferson Lab SoLID Collaboration Meeting Dec , 2012.
The Alberta Centre for Advanced Micro and Nano Technology Products Speeding the Path From Prototype to Commercial Product Ken Brizel CEO, ACAMP
Overview of Onsite Progress Jian-ping Chen g 2 p /G ep Collabroation Meeting.
Update on SoLID Jian-ping Chen, Jefferson Lab SoLID Collaboration Meeting November 8-9, 2013.
GEM DAQ-Chamber Integration Test Stand for GE2/1 & ME0 at Florida Tech
SoLID Simulation Zhiwen Zhao 2016/08/27.
Alexandre Camsonne August 27th 2016 SoLID collaboration meeting
CMS Goal of the experiment
EIC Tracking Meeting, March 26, 2012
Alexandre Camsonne January 12th 2016 SoLID collaboration meeting
SoLID SIDIS He3 Detection
Upgrade of the GlueX Spectrometer for Physics with Strange Final States Nuclear Physics Yi Qiang Nov. 13, 2011.
SoLID HGC Update Zhiwen Zhao 2016/01/13.
Alexandre Camsonne September 12th 2015 SoLID collaboration meeting
General Update Jian-ping Chen, JLab SoLID Collaboration Meeting
DAQ for SBS GEM SBS collaboration meeting August 6th 2019
TDIS mTPC update Nilanga Liyanage and Kondo Gnanvo UVa
Presentation transcript:

SoLID Pre-R&D List SoLID Collaboration Meeting September 11-12, 2015

Pre-R&D list (cost/manpower) for SoLID sub-systems: A)EC (including SPD): simulation/design, testing critical components (fibers, MAPMT, fine-mesh PMT, radiation hardness) and establish capability to produce modules Year 1: procurement $122K, manpower: 1 postdoc, 1 grad student, 3 summer undergraduates, 0.1 physicist, 0.15 engineer Year 2: procurement $ 84K, manpower: 0.25 postdoc, 0.75 grad student, 0.33 physicist, 0.25 engineer Total procurement $206K + manpower  Shandong U funding. B)Software: 2 postdoc x 3 years (one for simulation, one for tracking/analysis framework)  Update from Ole + Seamus C) DAQ: Y1: procurement $65.5K, manpower: 0.5 postdoc, 0.5 student Y2: procurement $53K, manpower: 0.5 postdoc, 0.5 student Y3: procurement $33K, manpower: 0.5 postdoc, 0.5 student Total $151.5K  JLab DAQ/FastElectronics Group List Discussed with Physics Division (June)  Update

D) LGC: procurement $48K, manpower 1.5 FTEY  See Michael’s slide E) HGC: procurement $154K (in addition to expected $74K contribution from Canada and already purchased $42K for 16 MAPMTs) manpower: 1 FTEY postdoc, 0.75 FTEY engineer (in addition to expected contribution from Duke side of 0.5 postdoc, 1 grad student, and 0.25 engineer)  Will know Canadian funcing in October? F) MRPC electronics R&D support: procurement $66K, manpower 0.5 FTEY  Needs update G) GEM support: procurement $190K (including $50K for APV 25 FEEs), manpower 2.35 FTEY  See Nilanga’s slide  Slow Control? List Discussed with Physics Division (June) (cont)

Michael Paolone

5 SoLID GEM R&D activities requiring funding at UVa and TU Small investments in pre R&D pay big dividends at final R&D and production. While a significant progress towards SoLID GEMs accomplished within the EIC R&D program some SoLID specific funding needed. Following is a rough estimate for the first year of SoLID GEM pre-R&D UVa $ 20 k : Components and manpower for a Solid prototype design. TU $ 20 k: Design and fabrication costs for SoLID specific GEM foils and chamber components. UVa/TU $ 40 k: Funds to host Chinese collaborators for extended visits. Purchase single mask foils from CIAE and build and characterize prototypes. Nilanga Liyanage