Fermilab 1 SNUMI Civil Issues September 18, 2006Dixon Bogert SNUMI Civil Design & Site Considerations; Issues and FESS work Dixon Bogert SNUMI Meeting,

Slides:



Advertisements
Similar presentations
CEM-512 Value Engineering Highway Project: South Interchange.
Advertisements

Muon Campus Projects Mary Convery 1. Background on Muon Campus plan Earlier Plan had 5 Common Projects:  MC1 Building (GPP)  MC Beamline Enclosure (GPP)
Electron Cooling in the Accumulator McGinnis Electron Cooling in the Accumulator Dave McGinnis.
NuMI Radiation and Environmental Protection NBI th International workshop on Neutrino Beams and Instrumentation September 5-9, 2006 Mike Martens.
Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys.
ANU Cooling Systems Karl Williams Fermilab Accelerator Division CD-2/3a DOE Review of NO A October 23-25, 2007.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
Fermilab Implementation of DOE Critical Decision Process FRA Project Management System Presentation by L Edward Temple Jr Head, Office of Project Management.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Opportunities for Experiments Based on Stored Muon Beams at Fermilab Milorad Popovic Jean-Francois Ostiguy Fermilab August, 2014.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Fermilab 1 AP Dept. Activities Report September 20, 2006Dixon Bogert AP Dept. - Activities Report Dixon Bogert - AP Dept. Meeting September 20 th, 2006.
Proton Plans at Fermilab Robert Zwaska - Fermilab Science and Engineering at Henderson- DUSEL Capstone Workshop Stony Brook University May 5, 2006 Outline.
SNuMI: Phase I & Phase II Nancy Grossman Phase I: $33.4M FY06$ (no contingency, no G&A) 41% contingency Phase II: $53.7M FY06$ (no contingency, no G&A)
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
Mu2e WBS 2 Accelerator Progress Report Mu2e WGM 6/15/2011 Steve Werkema L2 Manager for the Accelerator Systems.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
SNuMI (>1MW) SNuMI 1 Motivations for SNuMI The neutrino experimental program for the next decade –NOνA (long baseline νμ→νe search) –MINERνA (Main Injector.
Figure 2 gives an overview of the hardware components of the upgraded Main Injector BPM system. The figure shows 2 signal channels which produce one position.
F Project X Overview Dave McGinnis October 12, 2007.
Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
ORKA Preservation Task Force ORKA Preservation Task Force first meeting Wednesday, February 8, Notes by Peter H. Garbincius Notes from meeting are.
F 1 MW Proton Beam for Neutrinos Dave McGinnis AAC Meeting May 10, 2006.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Overview: Primary Sensitivities Nov S. Childress Page 1 NuMI Overview: NuMI Primary Beamline Sensitivities NuMI requirements are for a very large.
Main Injector Lambertson Aperture Scans David Johnson and Ming-Jen Yang March 17, 2006.
MINU GPP WBS 1. Main Injector Neutrino Upgrades - Infrastructure Project Dixon Bogert APD Department Report – March 7, 2007 Russ Alber - FESS Engineering.
Conventional Construction Working Group Meeting Tom Lackowski L2 Conventional Facilities Mu2e Working Group.
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
Mu2e, August 15, 2007 E Prebys 1 The Steering Group and mu2e Eric Prebys.
1 BROOKHAVEN SCIENCE ASSOCIATES EFAC Review Conventional Facilities Update Marty Fallier Director for Conventional Facilities May 10, 2007.
Proton Plan PMG 7/7/05 E Prebys 1 Proton Plan Status June Report Eric Prebys.
Fermilab Proton Driver and Muons David Johnson Fermilab Neutrino Factory Muon Collider Collaboration Meeting March 14, 2006.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Proton Plan Expectations Eric Prebys AD/Proton Source.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
REPORT 2 Estimating the population size of mobile organisms – Mark Recapture methods There are two parts to this practical. In the first (PART ONE), you.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
F Possible Proton Capabilities at Fermilab Dave McGinnis April 16, 2007.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
July 29, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Trying to.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Proton Plan 1/10/07 E Prebys 1 Proton Plan Meeting Agenda:  Project/campaign reorganization: Prebys  Status updates: all  Booster Water Proposal: Cooper.
WBS Experiment Infrastructure: Design Status Discussion Dixon Bogert Prepared for the MicroBooNE Collaboration Meeting 6/17/11.
WBS – 30 Straight Section Reconfiguration g-2 Accelerator – 30 Straight Section Reconfiguration D. Still Fermilab Muon g-2 IDR, June 5-7.
Maximum Credible Beam Loss in the Main Injector D. Capista January 26, 2012.
1 Target Introduction Chris Densham STFC/RAL Mu2e Target, Remote Handling, and Heat & Radiation Shield Review Nov
8 GeV Linac (Project X) and mu2e Chuck Ankenbrandt Fermilab Mu2e Collaboration Meeting August 1, 2007 My Preferred title: Linac & Recycler & Accumulator.
Siting/Conventional Facilities Jonathan Hunt PIP-II Machine Advisory Committee 9 March 2015.
Head, Office of Project Management Oversight (OPMO)
CLIC Civil Engineering Update
Potential Use of PEP-II Magnets by Project X
Presentation transcript:

Fermilab 1 SNUMI Civil Issues September 18, 2006Dixon Bogert SNUMI Civil Design & Site Considerations; Issues and FESS work Dixon Bogert SNUMI Meeting, Fermilab September 18 th, 2006 Reporting Work by FESS – Elaine McCluskey And Chuck Federowicz, Paul Lahn Last week’s work shown in red headers and text. (9/11) This week’s work shown in magenta headers and text. (9/18)

Fermilab 2 SNUMI Civil Issues September 18, 2006Dixon Bogert Phase 1 Elements of Construction SNUMI is planned to occur in two phases. The first phase, for which the items are identified with φ1 in the left margin, is required for the use of the Recycler Ring to slip stack 12 Booster batches of protons into six slots and then single turn transfer them into the Main Injector. The Main Injector will then spend minimal time at 8 GeV and the Main Injector cycle is reduced to about 1.33 seconds. The power on the NuMI Target is then about 700 kilowatts. A discussion of the development of civil definitions and preliminary cost and schedule estimates was held between Elaine McCluskey and Dixon Bogert on August 11, 2006.The basic outline was written down by Dixon on the Engineering Note shown below.

Fermilab 3 SNUMI Civil Issues September 18, 2006Dixon Bogert MI-14(?) Kicker Building at MI-10

Fermilab 4 SNUMI Civil Issues September 18, 2006Dixon Bogert MI-14(?) Location Near MI-10 MI-14(?) MI-10 MI-11

Fermilab 5 SNUMI Civil Issues September 18, 2006Dixon Bogert Proposed MI-14 Site Near MI-10 During the week FESS developed a detailed site plan for the MI-14 kicker building, based upon discussions with staff from AD/Electrical Support. To avoid setting the MI-14 building in the Indian Creek flood plain, the proposed building was turned around with entrance from the top of the FMI shielding berm. Discussions included the power required for the kickers, and the power required if an addition to house beamline power supplies is required. In this orientation, the kicker ducts cross under the proposed building. Shielding sections (not shown) were also made.

Fermilab 6 SNUMI Civil Issues September 18, 2006Dixon Bogert Proposed MI-14 Site Near MI-10

Fermilab 7 SNUMI Civil Issues September 18, 2006Dixon Bogert Proposed MI-14 Site Near MI-10

Fermilab 8 SNUMI Civil Issues September 18, 2006Dixon Bogert Proposed MI-14 Site Near MI-10 As of 9/18/06

Fermilab 9 SNUMI Civil Issues September 18, 2006Dixon Bogert Section thru MI-14 Site Near MI-10 MI-14 As of 9/18/06

Fermilab 10 SNUMI Civil Issues September 18, 2006Dixon Bogert MI-39(?) Kicker Building at MI-40

Fermilab 11 SNUMI Civil Issues September 18, 2006Dixon Bogert MI-39(?) Location Near MI-40 This location was suggested in the original memo. It is in wetlands, and access is poor. A possibly better choice is shown next, but the cable runs will be longer, although acceptable (<200’).

Fermilab 12 SNUMI Civil Issues September 18, 2006Dixon Bogert MI-39(?) Alternate Location Near MI-40

Fermilab 13 SNUMI Civil Issues September 18, 2006Dixon Bogert Proposed MI-39 Site Near MI-40 During the week FESS developed a detailed site plan for the MI-39 kicker building, based upon discussions with staff from AD/Electrical Support. The proposed building was set as shown last week outside of the FMI shielding berm. Discussions included the power required for the kickers. In this orientation, the kicker ducts enter the FMI berm directly from the back of the building.

Fermilab 14 SNUMI Civil Issues September 18, 2006Dixon Bogert Proposed MI-39 Site Near MI-40

Fermilab 15 SNUMI Civil Issues September 18, 2006Dixon Bogert Proposed MI-39 Site Near MI-40

Fermilab 16 SNUMI Civil Issues September 18, 2006Dixon Bogert Proposed MI-39 Site Near MI-40 As of 9/18/06

Fermilab 17 SNUMI Civil Issues September 18, 2006Dixon Bogert Section thru MI-39 Site Near MI-40 MI-39 As of 9/18/06

Fermilab 18 SNUMI Civil Issues September 18, 2006Dixon Bogert F17 is a model for these Buildings These drawings are taken from Project 6-6-8A

Fermilab 19 SNUMI Civil Issues September 18, 2006Dixon Bogert 4 th Anode Supply Room at MI-60

Fermilab 20 SNUMI Civil Issues September 18, 2006Dixon Bogert 4 th Anode Supply Room Location at MI-60 Possible blast/fire wall is required here. Additional 4-bay switch almost certainly required MI-60 Hi-Bay MI-60 Lo-Bay

Fermilab 21 SNUMI Civil Issues September 18, 2006Dixon Bogert 4 th Anode Supply Room Location at MI-60 FESS further developed the concept of locating the additional anode supply room in the area immediately north of the MI-60 high bay. A blast/fire wall was developed that could be placed immediately north of the high bay wall and made part of the MI-60 high bay wall.

Fermilab 22 SNUMI Civil Issues September 18, 2006Dixon Bogert 4 th Anode Supply Room Location at MI-60

Fermilab 23 SNUMI Civil Issues September 18, 2006Dixon Bogert 4 th Anode Supply Room Location at MI-60

Fermilab 24 SNUMI Civil Issues September 18, 2006Dixon Bogert Buss Bar Insertion at MI-60

Fermilab 25 SNUMI Civil Issues September 18, 2006Dixon Bogert Buss Bar Insertion at MI-60 Note interference with roof purlin beam

Fermilab 26 SNUMI Civil Issues September 18, 2006Dixon Bogert Additional Cooling Pond at MI-60 Ponds A/B

Fermilab 27 SNUMI Civil Issues September 18, 2006Dixon Bogert Additional Cooling Pond Location at MI-60 Pond A Pond B Pond “X” MI-60

Fermilab 28 SNUMI Civil Issues September 18, 2006Dixon Bogert Phase 2 – Accumulator Connections

Fermilab 29 SNUMI Civil Issues September 18, 2006Dixon Bogert Phase 2 – Accumulator Connections (Cont.)

Fermilab 30 SNUMI Civil Issues September 18, 2006Dixon Bogert Phase 2 – Accumulator Connections (Sketch)

Fermilab 31 SNUMI Civil Issues September 18, 2006Dixon Bogert Phase 2 – Accumulator Connections (Utilities)

Fermilab 32 SNUMI Civil Issues September 18, 2006Dixon Bogert Phase 2 – AP-4 Connection - 8 GeV Exit Point

Fermilab 33 SNUMI Civil Issues September 18, 2006Dixon Bogert Phase 2 – AP-4 Connection - 8 GeV Exit Point

Fermilab 34 SNUMI Civil Issues September 18, 2006Dixon Bogert FESS Deliverables

Fermilab 35 SNUMI Civil Issues September 18, 2006Dixon Bogert Remaining FESS Phase 1 work is only for the recycler

Fermilab 36 SNUMI Civil Issues September 18, 2006Dixon Bogert FESS forwarded to SNUMI Management comments on DOE Space Offsets