E. SzpindorFrontEnd System and FeedCone PDR 12-13 FEB 2002 1 Manufacturing and Test Feeds and Polarizers.

Slides:



Advertisements
Similar presentations
Chapter 4 Air-Conditioning Components
Advertisements

30 th September 2004 High Power RF Couplers James Rogers High Power RF Couplers ELSRF Daresbury Laboratory.
Welding of Roll cage products Assembly Welding / Required machinery or capabilities Single, double or triple head robot welding machine equipment, with.
1 SCHOOL OF COMPUTER & COMMUNICATIONS ENGINEERING EKT 341/4 ANTENNAS AND PROPAGATION Lecturer: En. Rosmizi bin Abd Rahim Dr. Mohd Faizal Bin Jamlos PLV:
2001 APCO/NENA State Training Conference January 19, 2001.
Lisa LockeEVLA Front-End CDR – S, X & Ku-Band Receivers April 24, EVLA Front-End CDR Plans for S (2-4), X (8-12) & Ku (12-18 GHz) Receiver Bands.
Team Air Liquide Senior Design Project 2007 Process Improvement of Resin Application System Phase IV Group Presentation Pete John Adam Willoughby-Knox.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
ATA Antennas Feeds and Systems NSF Review 8/05/08 Jack Welch.
Antenna, Feed, and LNA Integration S. Weinreb, May 7, 2009, LAX Antenna Working Group Meeting 1.Issues 2.Feed Summary 3.LNA Summary 4.Differential LNA’s.
E. Szpindor, J. Ruff Advisory Committee Briefing June 10-11, Antennas and Feeds.
Offset Quadruple-Ridge Orthomode Transducer, Mode Splitter/Combiner
AuthorMeeting Title Date 1 EVLA Systems PDR Receivers/Feeds Daniel (Mert) MertelyEVLA System PDR:Receivers/Feeds 28 November, 2001.
Production of Compactainer Capabilities Required for the production of KHW Compactainer  Tube processing, including cutting, bending  Wire processing,
Design Comparison Selection of OMT Design for the EVLA X-band Receiver Bob Hayward Senior Engineer.
FAA/NASA Joint University Program for Air Transportation Research Jeff Dickman Chris Bartone June 20, 2003 A New Anechoic Chamber for Nearfield Antenna.
Mark Bowen Acting Theme Leader – Technologies for Radio Astronomy CSIRO Astronomy and Space Science 14 October 2010 Australia Telescope Users Committee.
Tenth Summer Synthesis Imaging Workshop University of New Mexico, June 13-20, 2006 Antennas in Radio Astronomy Peter Napier.
Trasmission lines.
R. HaywardEVLA Feeds CDR - System Requirements 17 Feb EVLA Feeds CDR System Requirements.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
Linac R&D Update May 15, L-Band Source Consists of a LLRF system (VME/Epics based), a SNS High Voltage Converter Modulator (on loan), a Thales 2104C.
Photo-detector Tube Construction Laboratory Considerations Dean Walters Argonne National Laboratory.
Dan MertelyEVLA Front-End CDR – C-Band Receiver April 24, EVLA Front-End CDR C-Band (4-8 GHz) EVLA Receiver.
R. HaywardEVLA Front-End CDR – EVLA Front-End Schedule 24 April EVLA Front-End CDR EVLA Front-End Schedule.
Bob Hayward Receiver Engineer Feed & Front End PDR Feb Feed & Front End PDR Q, Ka, K, Ku & X-Band Receivers Backup Slides.
S. SrikanthEVLA Feed/FE PDR February 12-13, 2002 EVLA FEEDS DESIGN S. Srikanth NRAO/Charlottesville.
Dan MertelyEVLA Feeds CDR 17 February RFI Concerns Relating to EVLA Feeds Dan Mertely.
Hollis DinwiddieEVLA Front-End CDR – Feed Circle & Rx Mounting April 24, EVLA Front-End CDR Feed Circle & Receiver Mounting.
ISTC Project #3888 Development, manufacture and experimental investigation of a unique pilot CCDTL accelerating section in the energy range of MeV.
1.3GHz Input Coupler for ILC
EVLA Advisory Committee Meeting, March 19-20, 2009
1 EM COMPONENTS UPDATE & PERFORMANCE RESULTS S. Srikanth Critical Design Review GBT K-Band Focal Plane Array January 30-31, 2009.
VLVnT11 - Erlangen 12-14/10/ Giorgio Cacopardo NEMO Phase2 mechanical design G. Cacopardo on behalf of NEMO collaboration.
Paul Harden VLA Veteran EVLA LO-IF PDR 22 January EVLA IF/LO EVLA “LOW BAND” CONVERTERS For 4/P/L/S/C and Ku Bands.
Author EVLA Feed & FE PDR 12/13 Feb, EVLA Receivers PDR (4m, P,) L, S, C BAND RECEIVERS Daniel (Mert) Mertely.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
R. HaywardEVLA Feeds CDR – Feed Radomes 17 Feb EVLA Feeds CDR Feed Radomes.
Q, Ka, K, Ku & X-Band Receivers
MASCOT, ROSETTA,… Examples of CNES activity in Proximity Links.
MWO – Application of EM Structure in Filter Design Soh Ping Jack Sabarina Ismail.
PART TWO Electronic Color & RGB values 1. Electronic Color Computer Monitors: Use light in 3 colors to create images on the screen Monitors use RED, GREEN,
R. HaywardEVLA Feeds CDR – Project Budget & Schedule 17 Feb EVLA Feeds CDR Project Schedule & Budget.
Rick PerleyEVLA Front-End CDR – On the Sky Tests April 24, EVLA Front-End CDR On the Sky Tests.
10 June 2002 Paul Lilie Advisory Committee1 EVLA Front Ends.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
RF Module Integration Colin Whyte University of Strathclyde on behalf of the MICE collaboration 1RF Review 9th & 10th Sept '15 Abingdon.
Quality Control and Troubleshooting Arista Biologicals Inc.
Cosmic Microwave Technology, Inc.
Introduction Thermoguard.
Chromatography- TLC & HPLC
EVLA Spectral-Line Science Below 1200 MHz
LARP Phase II Secondary Collimator RC1
PIN DIODE.
F.Marcellini, D.Alesini, A.Ghigo
Choice of Cassegrain Geometry
iALMA WP4 – ALMA band 2 passive components
iALMA WP4 – ALMA band 2 passive components
EVLA – Polarizers for X, Ku, K and Ka Bands
Water Vapor Radiometer
LO/IF Switches Doug Scott
EVLA Receivers PDR Transition Planning Author Daniel (Mert) Mertely
PDR Guidelines The purpose of the PDR of an EVLA Subsystem is principally to review 3 questions:   Are the top level performance requirements for the subsystem.
IMPEDANCE MATCHING & SMITH CHART
Subject Name: Microwave and Radar Subject Code: 10EC54
Feed & Front End PDR—Sys. Reqts
Ka-Band Feed Design and Prototype Tests
EVLA Advisory Panel Mtg. System Overview
g3 Alternative Gas Solutions
Power Leads for Test Stands
Presentation transcript:

E. SzpindorFrontEnd System and FeedCone PDR FEB Manufacturing and Test Feeds and Polarizers

E. SzpindorFrontEnd System and FeedCone PDR FEB Outline Scope Manufacturing Machining Electroforming Plating Moisture & Corrosion Control Window & Radome Testing

E. SzpindorFrontEnd System and FeedCone PDR FEB Scope

E. SzpindorFrontEnd System and FeedCone PDR FEB OMTs Quad-ridge Bøifot Symmetric Junction

E. SzpindorFrontEnd System and FeedCone PDR FEB Phase Shifter and Transitions

E. SzpindorFrontEnd System and FeedCone PDR FEB Manufacturing Top Level Plan –Update Existing Drawings (K & Q Band) Dimensions Solid Models –Feeds L, S, & C Band (Ruff) X-Q Band (Szpindor) –Polarizers (Szpindor)

E. SzpindorFrontEnd System and FeedCone PDR FEB Machining Prototype Options –CV/Green Bank –VLA –NMT –Albuquerque Production –Mexican Partner (Primary) –VLA, CV/Green Bank, NMT, Albuquerque (Secondary)

E. SzpindorFrontEnd System and FeedCone PDR FEB Electroforming Prototypes –CV –AJ Tuck Brookfield, CT (VLBA L-band OMT) Production –Mexican Partner (Primary) –CV –AJ Tuck –Custom Microwave Inc. (Longmont, CO)

E. SzpindorFrontEnd System and FeedCone PDR FEB Plating Plating thickness and galvanic issues Prototypes –CV –Albuquerque (10 shops) Production –Mexican Partner (Primary) –New Mexico (18 shops)*

E. SzpindorFrontEnd System and FeedCone PDR FEB Moisture & Corrosion Control Feeds –Chromate Conversion –Sealed Junctions –Dry Environment Desiccant Pressurized Dry Air Nitrogen Polarizers –Minimized by putting all components in dewars –Minimize galvanic voltages

E. SzpindorFrontEnd System and FeedCone PDR FEB Window & Radome Design for minimum reflections and losses at up to 2:1 BW K/Q Band Model –Radome: environmental protection, non- absorbent, good UV characteristics –Feed Window: moisture seal, protect against insect/rodent access and nesting –Vacuum Window: Interface feed to receiver

E. SzpindorFrontEnd System and FeedCone PDR FEB Testing Feeds and Polarizers Prototypes –Full amplitude and phase characterization –RF Leakage –CV –Green Bank Production –SWR and Patterns –Min. every 3 rd to 5 th unit –Monitor process variation and personnel turnover

E. SzpindorFrontEnd System and FeedCone PDR FEB Testing Resources & Options AOC Test Equipment upgrades for S-parameter measurements for 1-50 GHz Pattern Measurement Options –Develop Socorro Range (existing HW + acquire surplus HW) –In State Ranges Sandia/AFRL, Albuquerque New Mexico State University, Los Cruces Army/ Air Force, WSMR –Out of State Ranges Green Bank JPL, Pasadena –Cost Evaluation (Equipment, Travel, Shipping, Range Time)