AE Senior Thesis 2009 U.S. Pharmacopeia Headquarters Consolidation Rockville, MD Analysis and Design of a Mild Reinforced One way slab with Post Tensioned.

Slides:



Advertisements
Similar presentations
8621 Georgia Avenue Silver Spring, MD
Advertisements

ASHA National Office Building 2011 AE Senior Thesis Ryan Dalrymple 5 th year Structural Option BAE/MAE Advisor: Dr. Thomas Boothby Photo Courtesy of Boggs.
Reinforced Concrete Design-8
Lecture 9 - Flexure June 20, 2003 CVEN 444.
Lecture 33 - Design of Two-Way Floor Slab System
Overview Waffle Slab.
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Reinforced Concrete Flexural Members
ONE-WAY SLAB. ONE-WAY SLAB Introduction A slab is structural element whose thickness is small compared to its own length and width. Slabs are usually.
Section 3 design of post-tensioned components for flexure Developed by the pTI EDC-130 Education Committee lead author: trey Hamilton, University of.
CTC 422 Design of Steel Structures
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
Pennsylvania College Of Technology Dauphin Hall Williamsport, Pennsylvania Aubert Ndjolba Structural Option AE Senior Thesis Thesis Advisor: Dr.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
George Read Hall The University of Delaware
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
The Odyssey Condominium Aaron Snyder Arlington, Virginia
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.
Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Nicholas Reed Structural Option Seneca Allegany Casino Hotel Addition AE Senior Thesis 2013 Courtesy of Jim Boje, PE.
Christopher Simmons l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Dr. Ali M. Memari Baltimore Hilton Convention Center Baltimore.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Senior Thesis 2006 The Pennsylvania State University
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
N EW Y ORK, N EW Y ORK 100 Eleventh Avenue © Tyler E. Graybill | Structural Option AE Senior Thesis Presentation | April 12, 2010 Faculty.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
Computer Associates International, Regional Office
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
 Building Background  Building Structural System  Problem Statement  Proposed Solution  Structural Investigations  Architectural Impact  Sustainability.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
Shear Stresses in Concrete Beams
The Executive Tower NW Washington DC Sean T Howard Structural Emphasis Advisor: Dr. Linda Hanagan æ Class of 2006 (Roof of the Federal Building, Chicago.
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
John Pillar Hampton Inn & Suites National Harbor, Md Advisor: Dr. Memari Distinguished Speaker Series, Spring 2007.
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Lecture 2 Structural System Overview CVEN Structural Concrete Design January 15, 2003.
Structural Systems Design of the Lincoln Fire Department Headquarters Michelle Burback Structural Engineering Capstone and Senior Honors Project.
Prof. Shrikant M. Harle Asst prof. Dept of Civil Engg PRMCEAM
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Pearl Condominiums Philadelphia, PA
786 Design of Two Way floor system for Flat Plate Slab
Advisor: Professor M. Kevin Parfitt
Agricultural Hall and Annex Easting Lansing, MI
Lecture 39 - Design of Two-Way Floor Slab System
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
North Shore at Canton The Pennsylvania State University
RiverView Condominiums II Chicago, IL
Presentation transcript:

AE Senior Thesis 2009 U.S. Pharmacopeia Headquarters Consolidation Rockville, MD Analysis and Design of a Mild Reinforced One way slab with Post Tensioned Beams Jeffrey L. Rothermel Jr. The Pennsylvania State University Department of Architectural Engineering Structural Option

Discussion Topics Background Information Existing Structure Design Goals Project Stages and Process Structural Design Mechanical Ductwork Redesign AE Senior Thesis 2009 | U.S. Pharmacopeia Headquarters | Jeffrey L. Rothermel Jr. | Structural Option

U.S. Pharmacopeia Headquarters AE Senior Thesis 2009 | U.S. Pharmacopeia Headquarters | Jeffrey L. Rothermel Jr. | Structural Option Owner: U.S. Pharmacopeia Architect: Hellmuth, Obata + Kassabaum (HOK) Structural: Cagley & Associates Inc. MEP: R.G. Vanderweil Engineers Construction: DPR Construction Inc. 6 stories - 91’ 191,000 ft 2 of new office and lab space New 19,000 ft 2 conference center Houses chemical and biological labs $69 million

U.S. Pharmacopeia Headquarters AE Senior Thesis 2009 | U.S. Pharmacopeia Headquarters | Jeffrey L. Rothermel Jr. | Structural Option Showcase laboratory spaces Large open office plans Kitchenettes for employees at every floor Curtain wall, metal paneling, and beige split face CMU Conical auditorium with curtain wall skin Enclosed outdoor plaza space

Existing Conditions AE Senior Thesis 2009 | U.S. Pharmacopeia Headquarters | Jeffrey L. Rothermel Jr. | Structural Option Two way mild reinforced concrete flat slab with drop panels 22’x22’ column grid 14’ floor-to-floor heights (Typ.) Reinforced concrete moment frames Steel framed conference center Truncated, conical concrete auditorium Photo courtesy of HOK Inc.

AE Senior Thesis 2009 | U.S. Pharmacopeia Headquarters | Jeffrey L. Rothermel Jr. | Structural Option

Design Goals AE Senior Thesis 2009 | U.S. Pharmacopeia Headquarters | Jeffrey L. Rothermel Jr. | Structural Option Lower floor-to-floor heights from 14’ to 13’ Increase column grid from 22’ to 44’ Eliminate moment frames Reduce ductwork sizes Maintain existing ceiling height

Design Stages AE Senior Thesis 2009 | U.S. Pharmacopeia Headquarters | Jeffrey L. Rothermel Jr. | Structural Option Investigate 3 alternatives Choose optimum system Design chosen floor system Design matching lateral system Resize ductwork mains

AE Senior Thesis 2009 | U.S. Pharmacopeia Headquarters | Jeffrey L. Rothermel Jr. | Structural Option Possible Solutions Staggered Steel Truss system Taken From AISC Design Guide 14: Staggered Steel Truss Framing Two way post tensioned slab One way slab with post tensioned beams

AE Senior Thesis 2009 | U.S. Pharmacopeia Headquarters | Jeffrey L. Rothermel Jr. | Structural Option Structural Depth Design Design Process 1.Lay out beams 2.Design slab system 3.Design post tensioned beams 1.Size 2.Tendon quantity 3.Drape 4.Column check 5.Design shear walls 1.Shear reinforcement 2.Flexural reinforcement 3.Coupling beams

AE Senior Thesis 2009 | U.S. Pharmacopeia Headquarters | Jeffrey L. Rothermel Jr. | Structural Option One way slab with PT beam design New Beam Layout

AE Senior Thesis 2009 | U.S. Pharmacopeia Headquarters | Jeffrey L. Rothermel Jr. | Structural Option One way slab with PT beam design Slab Design One way reinforcing 7” slab typ. 7-1/2” slab at 250 psf loading #5 bars T&B 24” for shrinkage and temperature parallel to beams

AE Senior Thesis 2009 | U.S. Pharmacopeia Headquarters | Jeffrey L. Rothermel Jr. | Structural Option One way slab with PT beam design Designed with RAM Concept per ACI Spans extended to 44’ Shallow wide beams Existing column size kept (24”x24”) F ’ c = 6000 psi Class T Transitional T-Beam properties #6 Bottom at ρ min = #5 Top with no minimum reinforcement 0.6f ’ ci compression limit (18.4.1(a)) 7.5√f ’ c ≤f t ≤ 12√f ’ c tensile stress limit (18.3.3)

AE Senior Thesis 2009 | U.S. Pharmacopeia Headquarters | Jeffrey L. Rothermel Jr. | Structural Option One way slab with PT beam design Design Process 1. Size the beams 2. Add tendons 3. Check stresses 4. Adjust profile 5. Schedule

AE Senior Thesis 2009 | U.S. Pharmacopeia Headquarters | Jeffrey L. Rothermel Jr. | Structural Option One way slab with PT beam design Interior beams typically 48”x14” Edge beams typically 30”,32”x14” tendons interior typically tendons in edge typically

AE Senior Thesis 2009 | U.S. Pharmacopeia Headquarters | Jeffrey L. Rothermel Jr. | Structural Option One way slab with PT beam design Transfer Girders 16-30” deep at transfers 48-56” wide at transfers Same depth as existing transfers 20-50% more post tensioning

AE Senior Thesis 2009 | U.S. Pharmacopeia Headquarters | Jeffrey L. Rothermel Jr. | Structural Option One way slab with PT beam design Load Balancing Load Balancing (% DL) Span FloorCol Line FirstA B C D E F G SecondA B C D E F G ThirdA B C D E F G FourthB C D E F G PenthouseB C D E F G Balance % of dead load Target balance 60-90% Target met in most beams A few beams overbalanced Some underbalanced

AE Senior Thesis 2009 | U.S. Pharmacopeia Headquarters | Jeffrey L. Rothermel Jr. | Structural Option One way slab with PT beam design Existing Column Properties Checked using PCA Column Moments from RAM Concept at column Interior columns sufficient Exterior columns require increased rebar Required for increased moment 8#9 12#9

AE Senior Thesis 2009 | U.S. Pharmacopeia Headquarters | Jeffrey L. Rothermel Jr. | Structural Option Shear Wall Design Existing reinforced concrete moment frames

AE Senior Thesis 2009 | U.S. Pharmacopeia Headquarters | Jeffrey L. Rothermel Jr. | Structural Option Shear Wall Design

AE Senior Thesis 2009 | U.S. Pharmacopeia Headquarters | Jeffrey L. Rothermel Jr. | Structural Option Shear Wall Design Taken From ASCE 7-05 Load Determination Method 2 per ASCE wind cases investigated Seismic loads using Equivalent Lateral Force Method 18” trial thickness 1.6W vs. 1.0E

AE Senior Thesis 2009 | U.S. Pharmacopeia Headquarters | Jeffrey L. Rothermel Jr. | Structural Option Shear Wall Design Shear reinforcement as required per Sec Each wall/segment designed for shear and flexure separately Minimum shear reinforcing used None needed for shear strength #4s Typ. Moment controlled reinforcing designs #8s Vert. for flexure

AE Senior Thesis 2009 | U.S. Pharmacopeia Headquarters | Jeffrey L. Rothermel Jr. | Structural Option Shear Wall Design Deflections in SAP 8” Membrane Self mass included 24” mesh Full I values for all members F ’ c = 3000 psi Wind limitation H/400 Seismic limitation 0.02h xn

AE Senior Thesis 2009 | U.S. Pharmacopeia Headquarters | Jeffrey L. Rothermel Jr. | Structural Option Shear Wall Design Coupled shear wall design SAP Member self weight included 8” Membrane Coupling beams extend into wall face 2’ Rigid end offset 48” deep beams Coupling beams as deep beams per Sec Designed per Sec Shear reinforcement per Sec. 11.7

AE Senior Thesis 2009 | U.S. Pharmacopeia Headquarters | Jeffrey L. Rothermel Jr. | Structural Option Mechanical Ductwork design Design Goals Keep loss under.25” WC/100’ Keep fpm flow under 2500 in mains over occupied spaces Reduce height and increase width

AE Senior Thesis 2009 | U.S. Pharmacopeia Headquarters | Jeffrey L. Rothermel Jr. | Structural Option First Floor Mechanical Ductwork Redesign

AE Senior Thesis 2009 | U.S. Pharmacopeia Headquarters | Jeffrey L. Rothermel Jr. | Structural Option Mechanical Ductwork Redesign Vertical mains shrunk 8-20” per side Maximum horizontal run that travels under beams is 20” Minimum ceiling height is 8’10” Average ceiling height can be +10’6”

AE Senior Thesis 2009 | U.S. Pharmacopeia Headquarters | Jeffrey L. Rothermel Jr. | Structural Option Façade Savings Floorsf curtain wallsf split face CMUsf metal panel 4th rd nd st Total $/sf Savings$4,309.92$3,933.80$1, Total Savings$9, Cost of New Ductwork Total Weightx1.15*xCost (installed) ($/lb)=Total Cost 42,263.2x1.15x6.79=$330,012 Cost of Existing Ductwork Total Weightx1.15*xCost (installed) ($/lb)=Total Cost 53,749.2x1.15x6.79=$419,700 Savings From Changes$89,688 *15% added for brackets and supports Some Quick Costs Savings on façade and ductwork More expense on structure

AE Senior Thesis 2009 | U.S. Pharmacopeia Headquarters | Jeffrey L. Rothermel Jr. | Structural Option Project Summary Post tensioned beam system provides optimal performance Wide shallow beams incorporate desired attributes into floors 48”x14” for most interior beams and 30”x14” for most exterior 8” shear walls designed for moment Mechanical ductwork redesigned to obtain project goals Savings on façade and mechanical ducts, more cost in structure All goals reasonably attained

AE Senior Thesis 2009 | U.S. Pharmacopeia Headquarters | Jeffrey L. Rothermel Jr. | Structural Option Questions/Comments