© 2009 Factory Strategies Group LLC. All rights reserved. Hoshin Kanri Lean Enterprise Series.

Slides:



Advertisements
Similar presentations
Leon County Schools Performance Feedback Process August 2006 For more information
Advertisements

Providing Feedback to Employees
The Management Process
A BPM Framework for KPI-Driven Performance Management
Hoshin Kanri Strategic Planning Sustainability. Deployment
CHAPTER 11 MANAGING INTERNAL OPERATIONS: ACTIONS THAT PROMOTE GOOD STRATEGY EXECUTION.
Slide 4.1 Chapter 4 Managing for Quality and High Performance.
© 2009 Factory Strategies Group LLC. All rights reserved. Lean Sales Lean Enterprise Series.
Improving Your Business Results Six Sigma Qualtec Six Sigma Qualtec Six Sigma Qualtec – All Rights Reserved June 26, 2002 BEYOND SIX SIGMA: A HOLISTIC.
System Office Performance Management
HOSHIN KANRI - HK An Investigation of Policy Management in a Japanese Subsidiary in Thailand: Concept, Key Success Factors and Barriers PATEE TINTAVEE.
7 Chapter Management, Leadership, and the Internal Organization
Lean Enterprise Transformation Lean Global Network November 2014.
Planning Ch. 5 Management A Practical Introduction
ORGANIZATION MANAGEMENT
Building and Sustaining Total Quality Organizations
Leadership and Strategic Planning
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
System Office Performance Management
Strategic Planning Process
Developed by Cool Pictures & MultiMedia PresentationsCopyright © 2004 by South-Western, a division of Thomson Learning. All rights reserved. Organizational.
Workplace Wellness Peer Group Goal Setting REVIEW
Roles and Responsibilities QMS Infrastructure. All Rights Reserved, Juran Institute, Inc Performance System.v1 1.PPT Learning Objectives 1.Become.
Foundations of Business 3e
Total Quality Management
Kinicki/Williams, Management: A Practical Introduction 3e ©2008, McGraw-Hill/Irwin Management A Practical Introduction Third Edition Angelo Kinicki & Brian.
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
© 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Encouraging Lasting Change With Your Successfully Completed Complex Project “A Division of TOTAL QUALITY CONTROL”
[Organization Name] [Date] In consultation with:.
Chapter 3 Performance Excellence, Competitive Advantage, and Strategic Management.
QBASE Engineering © QBASE Engineering Sdn Bhd Measurement System Analysis – MSA Course Description Total Quality Management ( TQM) is being pursued by.
Hoshin Kanri: A Strategic Planning and Deployment Methodology
Simplified Strategic Planning Taking Control, Involving Employees & Linking Systems Joseph Raible Senior Consultant 1The Millennium Group International,
So You Are Now A Manager! Now that you have been promoted to "Manager" what lies around the corner? This course centers on the major challenges of managing.
Focusing Performance Reviews On Future performance
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 5 Leadership and Strategic Planning.
Sustaining Improvement & Maintaining the Spirit Grace Duffy Public Health Foundation quality improvement consultant ACTION Campaign Webinar July 9, 2008.
AFM The Balanced Scorecard By Isuru Manawadu B.Sc in Accounting Sp. (USJP), ACA.
Cultures & Commitment Imran Hussain. TQM Core Customer/Supplier Chain Inputs Process Outputs.
Team Charters Tools & Techniques.
WINNING STRATEGIES.  The Present – Financials  The Present – Sales & Stocks  Market Report  Chosen Strategy  Hoshni Kanri  Catch Ball  Vision 
PLANNING How To Best Meet Your Mission We must plan for the future, because people who stay in the present will remain in the past. Abraham Lincoln.
Part Chapter © 2009 The McGraw-Hill Companies, Inc. All rights reserved. 1 McGraw-Hill Planning and Strategic Management 2 Chapter 5.
Component 8 Installation and Maintenance of Health IT Systems Unit 4 Structured Systems Analysis and Design This material was developed by Duke University,
TRANSFORMING CAPABILITY SUPPORT MATERIALS LEADING VISION CREATION Hoshin Kanri Introduction Hoshin Kanri is a method of strategic quality management. Developed.
Strategic Planning in the Baldrige Criteria
Chapter Sixteen Control: Techniques for Enhancing Organizational Effectiveness.
Implementing Strategy Chapter 7. Objectives Upon completion of this chapter, you should be able to:  Translate strategic thought to organisational action.
Copyright © Process Management International Ltd. All Rights Reserved. 0 Copyright © Process Management International Ltd. All Rights.
Bell Ringer Activity For each of the following functions, relate them to your own lives. –Planning –Organizing –Leading –Controlling.
Functions of Management
Encouraging Lasting Change With Your Successfully Completed Complex Project “A Division of TOTAL QUALITY CONTROL”
IT-465 Introduction to Lean part Two. IT-465 Lean Manufacturing2 Introduction Waste Walks and Spaghetti Charts Outcomes Understand what a waste walk is.
MGT-555 PERFORMANCE AND CAREER MANAGEMENT LECTURE NO
Read to Learn Describe the overall purpose of management. Discuss the four functions of management.
Management Functions Tevin Pinkett.
MANAGEMENT BY OBJECTIVES. OBJECTIVE SETTING S S specific M M measurable A A achievable R R result oriented (realistic) T T time-related WORK HAVESUCCESS.
BUSINESS 7e Copyright 2004 Prentice Hall, Inc.1 PART 2 UNDERSTANDING THE BUSINESS OF MANAGING.
Top lean six sigma consulting strategies for businesses Lean Six Sigma Manufacturing Consulting By: Group50.com.
Preparing and Planning to Manage 1 Discuss the difference between the entrepreneurial role and the management role of a new business owner. Identify the.
Focusing Performance Reviews On Future performance
Hoshin Planning Al Maaref University, Faculty of Business Administration Seminar Series Hussin Jose Hejase, Dean Faculty of Business Administration, Al.
Overview – Guide to Developing Safety Improvement Plan
Overview – Guide to Developing Safety Improvement Plan
Managing For Daily Improvement
Management, Leadership, and Internal Organization
Module 3 Part 2 Developing and Implementing a QI Plan: Planning and Execution Adapted from: The Health Resources and Services Administration (HRSA) Quality.
Cascading Strategic Objectives – Hoshin Planning Template
Presentation transcript:

© 2009 Factory Strategies Group LLC. All rights reserved. Hoshin Kanri Lean Enterprise Series

2 © 2009 Factory Strategies Group LLC. All rights reserved. Outline 1.Definition of Hoshin Kanri 2.History of Hoshin Kanri 3.Introduction to Hoshin Kanri 4.Implementing Hoshin Kanri 5.Summary

3 © 2009 Factory Strategies Group LLC. All rights reserved. Hoshin Kanri Hoshin Kanri is a step-by-step planning, implementation and review process for managed change. It is a systems approach to the management of change in critical business processes. Hoshin Kanri is a proven technique that helps organizations focus efforts and achieve results.

4 © 2009 Factory Strategies Group LLC. All rights reserved. History of Hoshin Kanri After World War 11, Japan was faced with the difficult task of rebuilding its economy and infrastructure without out allowing the military to be rebuilt. Hoshin Kanri is a planning process that was developed in Japan but it is based on the US techniques of Management by Objectives and the classical Plan-Do- Check-Act (PDCA) improvement cycle. Hoshin Kanri is used to communicate company policy to everyone in the organization Its primary benefit is to focus activity on the key things necessary for successes. Japanese Deming Prize winners credit Hoshin as being a key contributor to their business success.

5 © 2009 Factory Strategies Group LLC. All rights reserved. Introduction: Process Top Management sets the overall vision and the annual high-level policies and targets At each level down, managers and employees participate in the definition, from the overall vision and their annual targets, of the strategy and detailed action plan Each level pass on targets to the next level. Each level under top management is, in turn, involved with the level above it to make sure that its proposed strategy corresponds to requirements. Regular reviews take place to identify progress and problems, and to initiate corrective action.

6 © 2009 Factory Strategies Group LLC. All rights reserved. Critical Behaviors People seem to need either a crisis or goals to achieve extraordinary outcomes. Research shows that performance-focused management practices can increase performance by at least 30-40%* Hoshin combines long and short-term planning methods with quality and objective management methods to produce a plan-to-do-act cycle. Leadership must take steps to close the gap between today’s performance and an organization’s vision. *Julia Graham: “Developing a Performance-based Culture” – The Journal for Quality and Participation, 2004

7 © 2009 Factory Strategies Group LLC. All rights reserved. Fundamental Systems Daily Management System deals with the operation and monitoring of micro work processes supports identification of task level work, creation and improvement of task level work processes, supports subject matter experts provides communication to management and cross functional work team encourages participation and involvement Cross-Functional Management System The improvement of processes spanning the entire organization Addressing issues such as product or service quality Lean Six Sigma is one example Critical to the management of an organization’s vision and mission, identification and management of cross-functional work processes, and issues and cross-functional work process improvements There are two management systems fundamental to Hoshin: daily and cross-functional management systems.

8 © 2009 Factory Strategies Group LLC. All rights reserved. Breakthrough Performance Plans The gap between the long-range plan and business fundamentals plan provides motivation for change The long-range plan is the basis for the annual plan which identifies what must be accomplished this year to move the organization along the path to the future as specified in the long-range plan It is very detailed and lays the foundation for what must be accomplished in the way of improvement (change) and how success will be measured Unlike the long-range plan, the annual plan likely will change significantly year to year Annual Plan