June 19, 2003James T Volk F0 Lambertson Liner review J Volk WBS for Liner –Liner fabrication –Liner installation Liner installation tests at MI-60 Vacuum.

Slides:



Advertisements
Similar presentations
Antti Piirto The first EPR under Construction in Finland International Nuclear Forum 2008 ”Bulgarian Nuclear Energy – National, Regional and.
Advertisements

Training Guide. `
Over 50 Years of Regional Service and World-Class Quality United Air Conditioning is a client-focused, family-owned air conditioning company serving.
D-Cal production preparations in Japan Dec. 16, 2009, D-Cal meeting at CERN Tatsuya Chujo (Univ. of Tsukuba) for the D-Cal Project 1.
19 Jun 031 Lamberston Removal and F0 Straight Section Vacuum Upgrade Mike McGee FNAL.
Tank 85 Foundation  View of poured auger pile.  Setting up for next pile.  This process repeated itself 310.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
Specialty Steel Products ESP Specialty Steel Products Commitment to our Customers.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
There are two types of waterjet cutting
Status of KEK production July 11, 2008 at SLAC KEK T. Higo et al., Accelerator div. T. Takatomi et al., Mech. Eng. Center.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Vacuum System Elements for BESSY II Vacuum Equipment All vacuum elements are produced at BINP in accordance to the European standards and satisfy the.
XFD – XF Engineering Group November 15-th, 2004LCLS Undulator Final Design Review1 Undulator for the LCLS project – from the prototype to the full scale.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
FABRICATION OF BLOCKS OWNERS REQUIREMENT DESIGN CLASSIFICATION SOCIETY
CIEMAT CONTRIBUTION TO TBL PETS (January 2009) David Carrillo on behalf of the Accelerators Team.
Reseller Program 3 Tiers Platinum Higher sales quota, value-added resellers, custom sales system integration, 30-50% margin Gold Sales quota, proactively.
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
MICE Coupling Coil Update Steve Virostek for Allan DeMello Lawrence Berkeley National Laboratory MICO January 23, 2013 January 23, 2013.
© 2011 Pearson Education, Inc. All Rights Reserved Automotive Technology, Fifth Edition James Halderman ENGINE CLEANING AND CRACK DETECTION 29.
Presented To You By BELT MAINTENANCE GROUP The Project THE WORLD’S LONGEST SINGLE FLIGHT CONVEYOR SYSTEM 40.6 KM OF 36” WIDE ST900 STEEL CORD CONVEYOR.
SC Project Review of NCSX, April 8-10, 2008 Central Controls and Computing WBS51 & 52 P. Sichta WBS5 Work Package Manager.
Automotive Engines: Theory and Servicing, 7/e By James D. Halderman Copyright © 2011, 2009, 2005, 2001, 1997 Pearson Education, Inc., Upper Saddle River,
2014 AWA Experiments managed by Jing --- updated on 2/25/2014 Experiment 1: 11.7GHz metallic DL Experiment 2: 91GHz metallic Experiment.
1 Progress of IR Vacuum Chambers Chen Peng May 11,2007.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 23 May 2012 Notes on A8 transport 2 ShockLog malfunction: fresh batteries consumed.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
Concepts for New Recycler Lambertons GW Foster Dec 2000.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
2/17/2016 Recycler -Gattuso Recycler Shut Down Status  Flying Wire Status  Wire Vacuum Certified  Tunnel Bake Prep status Disconnection of BPM, Correctors,
Procurement and Manufacture of LCLS Undulators FY 04 Activity: Complete design of Second Prototype Undulator This will include field control comb Procure.
LTI no 37: Cook cuts off finger 18/Aug/00 A cook was preparing lunch for a camp in Fahud. He was cutting chicken with a large kitchen knife.
7-Sep-2011 CLIC RF Structure Development Meeting «BE/RF» TD26 WITH COMPACT COUPLER FOR CLEX (TD26 CC SiC) ENGINEERING DESIGN this structure will be used.
EMCal Meeting Nantes – July J-F Muraz  Grenoble Status  Assembly and test Hall.
Shop Safety Safety in the shop is the MOST important aspect.
DOE-QRT Review 12 Feb2004 Joseph Rasson LHC Project Update1 Joseph Rasson LBNL DOE LHC Quarterly Status Meeting at FNAL 12 February 2004 US LHC ACCELERATOR.
Technology Department MKP status L. Sermeus, L. Ducimetière TCM 18 November 2014.
Beampipe Installation Status Ray Veness For the Beampipe team in AT/VAC and TS-MME.
Update: Puck and Gun Magnet March 1, Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
Magnetized Beam LDRD: Design Tasks February 19, 2016.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
09/21/07Shutdown’07 Week 7 F.G. Garcia1 MTA beam line installation Weekly Report September 21, 2007 Period covered: September 14 th September 21 th (Week.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
LANL Cost and Schedule Review 02/11/05 1 Cryostat (lower half) WBS 3.1, 3.5, 3.6, 3.7, 3.8, 3.10 Paul Huffman, Chris O’Shaughnessy North Carolina State.
MI/RR Shutdown 2012 Dec Gev Lines/Injection region: Staging equipment, cleaning and prepping new part to start vacuum work. Preparing to modify the.
1 Workshop on Vacuum System Design for Synchrotron light Source ALBA - Barcelona, Sept New trends in the vacuum design and technology.
21 Curtis Court Building 1 Cartersville, GA Phone: Web Site:
LCWS11 WG4 Fully featured accelerating structure engineering design
News and Introduction from CERN June 15th, 2005
QXF Coil Fabrication & Tooling Reaction / Impregnation
Mississippi Space & Technology Center
ENGINE CLEANING AND CRACK DETECTION
CLEAN UP & INSPECTION.
STATUS OF CIEMAT CONTRIBUTION TO CTF3 ( )
Implementation of a School-based Payroll Preparation
Installation of an Instrument on a CERN machine
on behalf of the RF group
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
Stainless Steel Water Well Casing.
ScaleBuster Installation Guide
WELCOME TO OTTOMMO Casting. ABOUT US Ningbo OTTOMMO Casting is a China casting metal foundry with investment casting, die casting, sand casting and full.
Atlantic Duct Cleaning
PS magnet status D Bodart 25/06/2019.
Change Management E2E Roadmap
Presentation transcript:

June 19, 2003James T Volk F0 Lambertson Liner review J Volk WBS for Liner –Liner fabrication –Liner installation Liner installation tests at MI-60 Vacuum tests at MI-60

June 19, 2003James T Volk F0 Lambertson Liner Fabrication Jul 8 Expect first liner Jul 21Approve making next 6 Aug 13 all liners ready

June 19, 2003James T Volk F0 Lambertson Liner installation Sep 2 magnet mover To MI-60 Aug 29 2 liners installed Sep 14 Pump out begins Sep 3 all liners installed

June 19, 2003James T Volk Lambertson at MI-60 Field Free region Field Region Ledge

June 19, 2003James T Volk Liner Installation ES&H issues with Copper Beryllium –Be training for techs –No sanding, cutting, grinding, machining, ect. –Clean up afterward Support of liner during installation Push, Pull, or vacuum through the liner? Ledge at entrance Use of Stainless Steel strips to guide liner Any special tools we may need

June 19, 2003James T Volk Vacuum Tests Current vacuum at F0 on the order of Need to bake out Lambertson with liner to assure that vacuum is good with the liner If vacuum worse than we can’t install liners at F0 We are working with Bruce Hanna to get equipment at MI-60 to do full vacuum test Also measure impedance after vacuum bake out

June 19, 2003James T Volk Conclusions We have schedule for preparation and installation that fits with time constraints We will test installation and vacuum before we commit to installation There is slack time to make up for delay caused by any problems