T. Limberg Position of the 3rd Harmonic System. Injector (with first Bunch Compression Stage) 2 European XFEL MAC May 2010 T. Limberg.

Slides:



Advertisements
Similar presentations
Nominal and no CSR (R 56-1 = 55 mm, R 56-2 = 59 mm, R 56-3 = 0) L1 phase = 21 deg, V 3.9 = 55 MV CSR OFF BC3 OFF Elegant Tracking  z1 = mm (post.
Advertisements

BC System – Review Options ● BC2 working point (energy-charge-compr.) ● 2BC (rf-rf-bc-rf-bc-rf) ● table: 2BC (rf-rf-bc-rf-bc-rf) dogleg + 2BC (rf-dog-rf-rf-bc-rf-bc-rf)
Update of RTML, Status of FNAL L-band and CLIC X-band BPM, Split SC Quadrupole Nikolay Solyak Fermilab (On behalf of RTML team) LCWS2010 / ILC 10, March.
1 Optimal focusing lattice for XFEL undulators: Numerical simulations Vitali Khachatryan, Artur Tarloyan CANDLE, DESY/MPY
Christopher Gerth, Michael Röhrs, Holger Schlarb DESY Hamburg Optics for Diagnostic Section BC1 in the European XFEL.
Tessa Charles Australian Synchrotron / Monash University 1 Bunch Compression Schemes for X-band FELs.
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
1 ILC Bunch compressor Damping ring ILC Summer School August Eun-San Kim KNU.
Commissioning August & September. 2 Agenda 11:20 Coffee 11:30 Introduction Sue S 11:35 Controls (an overview) Brian M 10:55 Controls & Data Acquisition.
ILC RF phase stability requirements and how can we demonstrate them Sergei Nagaitsev Oct 24, 2007.
Bunch compressor design for eRHIC Yichao Jing and Vladimir Litvinenko FLS2012, Newport News, VA 3/8/2012.
Juhao Wu Feedback & Oct. 12 – 13, 2004 Juhao Wu Stanford Linear Accelerator Center LCLS Longitudinal Feedback with CSR as Diagnostic.
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Linac Physics, Diagnostics, and Commissioning Strategy P. Emma LCLS FAC Meeting April 29, 2004 LCLS.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
Cecile Limborg-Deprey Injector October Injector Physics C.Limborg-Deprey Diagnostics and Commissioning GTL measurements.
FEL Beam Dynami cs FEL Beam Dynamics T. Limberg FEL driver linac operation with very short electron bunches.
Influence of the Third Harmonic Module on the Beam Size Maria Kuhn University of Hamburg Bachelor Thesis Presentation.
Review of the European XFEL Bunch Compression System Summary Torsten Limberg.
Low Emittance RF Gun Developments for PAL-XFEL
~ gun3.9 GHz cavity Bunch compressor 3 ILC cryomodules 45 deg. spectro injector main linac user area disp. area transport line Overview of.
The Overview of the ILC RTML Bunch Compressor Design Sergei Seletskiy LCWS 13 November, 2012.
TTF2 Start-to-End Simulations Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Zeuthen, 22 Jan 2004.
XFEL BC Review Meeting, 18/12/2006, Christopher Gerth Christopher Gerth, Michael Röhrs, Holger Schlarb DESY Hamburg Optics Layout of the Diagnostic Sections.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
LCLS Accelerator SLAC linac tunnel research yard Linac-0 L =6 m Linac-1 L  9 m  rf   25° Linac-2 L  330 m  rf   41° Linac-3 L  550 m  rf  0°
Undulator parameters choice/wish based on a simplified XFEL cost model Jürgen Pfingstner 29 st of July 2015.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
1 Plan and Opportunities for Migration and Integration of the Photoinjector into New Muon Lab Mike Church AAC Review - 12/5/06.
FLASH II. The results from FLASH II tests Sven Ackermann FEL seminar Hamburg, April 23 th, 2013.
16 August 2005PT for US BC Task Force1 Two Stage Bunch Compressor Proposal Snowmass WG1 “It’s the latest wave That you’ve been craving for The old ideal.
A bunch compressor design and several X-band FELs Yipeng Sun, ARD/SLAC , LCLS-II meeting.
28-May-2008Non-linear Beam Dynamics WS1 On Injection Beam Loss at the SPring-8 Storage Ring Masaru TAKAO & J. Schimizu, K. Soutome, and H. Tanaka JASRI.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Jorg Kewisch, Dmitri Kayran Electron Beam Transport and System specifications.
Awake electron beam requirements ParameterBaseline Phase 2Range to check Beam Energy16 MeV MeV Energy spread (  ) 0.5 %< 0.5 % ? Bunch Length (
Christopher Gerth & Christopher Behrens Mini-Workshop on Longitudinal Diagnostics for FELs 11/12 March 2013, PSI, Villigen TDS induced energy spread.
Construction, Commissioning, and Operation of Injector Test Facility (ITF) for the PAL-XFEL November 12, 2013 S. J. Park, J. H. Hong, C. K. Min, I. Y.
Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz,
X-band Based FEL proposal
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
LCLS2sc MAD files: Injector to Bypass Line
Cutting Beam Horns in BC1
Slice Parameter Measurements at the SwissFEL Injector Test Facility
XFEL Beam Physics 10/30/2015 Tor Raubenheimer.
Longitudinal Diagnostics for start-up
Thermal emittance measurement Gun Spectrometer
LCLS Linac Update Brief Overview L1 & BC1 Progress LTU & E-Dump Status Continuing Resolution Impact.
XFEL Bunch Compression System Tuning
Injector Beam Line Optics
Electron Source Configuration
Diagnostics overview and FB for the XFEL bunch compressors
Linac/BC1 Commissioning P
LCLS Linac Overview E. Bong Lehman Review August 10, 2004
Linac (WBS 1.2.2) Vinod Bharadwaj April 23, 2002
LCLS Tracking Studies CSR micro-bunching in compressors
Modified Beam Parameter Range
Laser Heater Integration into XFEL. Update.
Linac Physics, Diagnostics, and Commissioning Strategy P
LCLS FEL Parameters Heinz-Dieter Nuhn, SLAC / SSRL April 23, 2002
Linac Diagnostics Commissioning Experience
Operational Experience with LCLS RF systems
Current State of the Lattice Studies for the XFEL Injector
Coupler Effects in High Energy Part of XFEL Linac
XFEL Beam Dynamics Activity at CANDLE
Evgenij Kot XFEL beam dynamics meeting,
Bunch Compressor Beam Line Optics
Fanglei Lin MEIC R&D Meeting, JLab, July 16, 2015
S2E Meeting on Yauhen Kot.
Presentation transcript:

T. Limberg Position of the 3rd Harmonic System

Injector (with first Bunch Compression Stage) 2 European XFEL MAC May 2010 T. Limberg

Position of the 3rd Harmonic System Injector Hall 3 European XFEL MAC May 2010 T. Limberg Start Linac Tunnel XTIN: Length = 48m, accommodates Gun, ACC1, 3,9GHz, Laser Heater, Diagnostics, Dump Line. XSE: Length = 22.55m, accommodates Shielding, Dogleg

Position of the 3rd Harmonic System Optical Restraints 4 European XFEL MAC May 2010 T. Limberg Laser Heater Diagnostics Shielding Dogleg BC0Phase Shifter LH: - round and as stable as possible beam size required Diagnostics: - consists of TDS and 4 OTR screens - Optics at OTR screens is implemented by means of a 1.5 FODO cell with the phase advance of 76° - Fixed phase advance between TDS and OTR screens - Optics after LH is fixed. Entrance into the Diagnostics describes the boundary conditions for optics functions Shielding: - Concrete solid wall of 5.1m thickness with a spare place for the beam pipe. However two quadrupoles inside are needed to control the beta function. Dogleg: - Combination of two four cell arcs (8 cell system) - Provides a vertical displacement of the beam for a distance of 2,75m over the length of 20m. - First order momentum compaction r56 is zero. Phase Shifter: - Two 4m long FODO cells - Allows to adjust the phase advance by +-36°

Position of the 3rd Harmonic System After Chromatic Optimization 5 European XFEL MAC May 2010 T. Limberg Assumed: - ideal installation of the quadrupoles without any offsets. - Energy spread of the bunch is 2% RMS Results: - Emittance growth due to chromaticity effects over the first 80m is about 5-10% LHBC0 DOGLEG

Position of the 3rd Harmonic System Laser Heater 6 European XFEL MAC May 2010 T. Limberg HorizontalVertical , m  D, m0.030 ,  m Off-crest acceleration in ACC1  energy spread of 2% at the moment the best possible ratio Length, mm BL.1200 BL.2200 OTR, BPM300 UNDULATOR800 Total2600 Optics and beam parameters in the undulator Length of the elements in LH BL.1 BL.2 BL.1 OTR UNDULATOR 

Position of the 3rd Harmonic System MAC Proposal Avoid energy chirp in laser heater and dogleg: Shift 3 rd harmonic rf system downstream of dogleg Provide chirp for compression with 3 rd harmonic 7 European XFEL MAC January 2010 T. Limberg

Position of the 3rd Harmonic System Compression System Overview 8 European XFEL MAC January 2010 T. Limberg

Position of the 3rd Harmonic System Relation between rf sum shape and amplitudes and phases of fundamental and harmonic rf systems (normalized to beam energy) 9 European XFEL MAC January 2010 T. Limberg

Position of the 3rd Harmonic System Running fundamental on crest 10 European XFEL MAC January 2010 T. Limberg Control of third derivative (tail control) is lost For given energy a 1 in dogleg, energy p upstream of BC0 will vary for different working points (or otherwise) Beam-based rf feedbacks might get simpler

Position of the 3rd Harmonic System First checks (0.1 nC case) look o.k. 11 European XFEL MAC January 2010 T. Limberg Longitudinal phase space Current Profile

Position of the 3rd Harmonic System Effort and cost: Kryo Feedcap & endcap Knees for transfer line Tight installation (Very) rough estimate for extra kryo cost: 1 M€ 12 European XFEL MAC January 2010 T. Limberg

Position of the 3rd Harmonic System RF and LLRF Issues Klystron will be installed underneath module LLRF system will be installed close to 3 rd harmonic rf →no additional problems for these systems at the linac tunnel position 13 European XFEL MAC January 2010 T. Limberg

Position of the 3rd Harmonic System Summary for Shifting 3 rd Harmonic rf and Running First Module on Crest Plus: Relaxed conditions in dogleg and laser heater Might simplify beam-based rf feed-backs Minus: Reduced tunability of bunch compression system ~1 M€ extra cost Tight installation Independent and early commissioning not possible 14 European XFEL MAC January 2010 T. Limberg