U.S. Army Corps of Engineers (USACE) AEC Utility Monitoring And Control Systems and Electronic Security Systems (UMCS)(ESS) Prepared for: Energy Huntsville.

Slides:



Advertisements
Similar presentations
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
Advertisements

Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
GPA Renewable Energy Resource for Guam Power Authority
1. 2 RE Case Study What was the Project Objective? When did it all Start? What was the Plan? How did Negotiations take place? What were the Benefits of.
Systems Analysis and Design in a Changing World
Chapter 8: Evaluating Alternatives for Requirements, Environment, and Implementation.
Striving to exceed customer demands by delivering the best.
How to Hit a Homerun Saving Energy and Updating Facilities Presented by Shirley McNutt.
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Alternative Project Delivery
1 BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Procurement Methodology David Dale NLSL II Procurement Manager.
Smart Grid - Cyber Security Small Rural Electric George Gamble Black & Veatch
DoD Information Technology Security Certification and Accreditation Process (DITSCAP) Phase III – Validation Thomas Howard Chris Pierce.
REQUEST FOR PROPOSALS RFP #08-56 Project Management and Procurement Assistance Consultant for an Intelligent Transit System Solution (I.T.S.S.) October.
Fundamentals of Information Systems, Second Edition
1 Purchasing and Procurement Processes Module Four Revision Date: 2/06/2015.
Best Procurement Practices and Helpful Information August 2011.
Federal Acquisition Service U.S. General Services Administration Facilities Management Solutions 2010 GSA Caribbean Training Conference March 2010 Donald.
J.B. Speed School of Engineering University of Louisville KEEPS Energy Management Toolkit Step 2: Assess Performance & Opportunities Toolkit 2A: KEEPS.
GENERAL SERVICES ADMINISTRATION USAContact Program Multi-channel Contact Center Services Pre-solicitation Conference Robert H. Corey Contracting Officer.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
AASHTO Subcommittee on Construction 2010 Annual Meeting Summary of C&T Section Work Plan Surveys August 16–20, 2010 Summary of C&T Section Work Plan Surveys.
© 2010 Chevron A Day in the Life of a Project Manager Presented by Nancy Grossman, Project Manager Presented to Chabot College Engineering Class September.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
1 Billing, Metering CRM/CIS America 2004 Transition Strategy: Manual Field Data Collection to AMR Implementation Chuck Session Manager, Cinergy Meter Reading.
Phoenix Convention Center Phoenix, Arizona A Review of the Current DOE IDIQ Track 5: Project Financing Session 3: ESPC Large and Small: The Basics of ESPC.
1 Report Tile Training & Management Assistance Branch UNITED STATES OFFICE OF PERSONNEL MANAGEMENT Task Order Competition (TOC) Process.
Reserve Study A Short and Long Term Budgetary Planning Vehicle
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Energy Huntsville Opportunity Report November 2012 Steve Reed
Energy Huntsville Opportunity Report and Government Collaboration September 2015.
US Army Corps of Engineers BUILDING STRONG ® Networking & Teaming Conference Fort Bliss Replacement Hospital Projects Jim Bales & John Rodgers Fort Worth.
FAR Part 10 Market Research. FAR Part 10 - Prescribes policies and procedures for conducting Market Research.
Acquisition Overview for Johnson Space Center Grounds Maintenance and Pest Control Services (GMAPS) July 18, 2013 The information provided is pre-decisional1.
Energy Huntsville Opportunity Report and Government Collaboration August 2015.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Phoenix Convention Center Phoenix, Arizona Life-Cycle Cost Analysis for large projects Agency Energy ManagerLife-Cycle Cost Methodology Jeanette Fiess,
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Fundamentals of Information Systems, Second Edition 1 Systems Development.
U.S. General Services Administration WITS 3. 2 Background A Cornerstone in the Nationwide Local Service Program Largest Metropolitan Area Acquisition.
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
Dr. John MacCarthy UMBC CMSC 615 Fall, 2006
1 Comprehensive Tactical Infrastructure Maintenance and Repair (CTIMR) Area 3 Pre-Proposal Site Visit HSBP1015R0040 Sectors EL PASO / BIG BEND, TX
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
Chapter 8 Final Construction Final construction in the SDLC Construct and test programs Construct and test the database Obtain additional hardware Prepare.
MARINE CORPS INSTALLATIONS EAST CONTRACTING DIVISION DEFINING REQUIREMENTS.
Request for Information & Capability Statements Richland Acquisitions Post-FY 2018 November 17-19, 2015.
Energy Huntsville Opportunity Report and Government Collaboration February 2016.
Outreach for the On-Call Hazardous Waste Site Investigation and Design Services Contract Caltrans D9 February 17, 2016.
April 5, 2005 PPD Informal FLARE Review T. Lackowski 1 FLARE Conventional Civil Construction.
Construction Management At Risk Process
Energy Huntsville Opportunity Report and Government Collaboration April 2016.
Energy Huntsville Opportunity Report and Government Collaboration June 2016.
USAID Afghanistan Engineering Support Program (ESP) Pre-Bid Meeting July 14, 2015.
PRE-PROPOSAL CONFERENCE RFP - VA R-0039 AMARILLO VA HEALTH CARE SYSTEM Building 34 Room Amarillo Blvd West Amarillo, TX /18/2012.
Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016.
Energy Huntsville Opportunity Report August 2016
Fort Stanwix National Monument Energy Audit Contract
Post Award Peer Review Briefing Slides
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Energy Huntsville Opportunity Report October 2016
Management of Placement Area at Bayport Container Terminal (RFQ-147)
Business System Development
9/18/2018 Bids CONTRACTING Khamis…..
Energy Huntsville Opportunity Report March 2017
Lockheed Martin Canada’s SMB Mentoring Program
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Brieana Reed-Harmel, Broadband Project Manager
Post Award Peer Review Briefing Slides
Presentation transcript:

U.S. Army Corps of Engineers (USACE) AEC Utility Monitoring And Control Systems and Electronic Security Systems (UMCS)(ESS) Prepared for: Energy Huntsville Prepared by: Go-to-Market Solutions Date: January 19, 2016 Opportunity Session Competition Sensitive

2 Opportunity Session: Energy Huntsville Agenda: 1.Demo: Energy Huntsville Opportunity Report 2.Opportunity Analysis: Overview of the Utility Monitoring and Control Systems (UMCS) Electronic Security System (ESS) Contract a.Current UMCS ESS Contract i.Spending ii.Incumbents b.Upcoming UMCS ESS Contract 3.Potential Bidders: Geographic depiction of potential UMCS ESS Contractors 4.Program Overview: USACE UMCS Program 5.Requirements Overview: Upcoming requirements for the Utility Monitoring and Controls (UMCS) Electronic Security System (ESS) Contract 6.Networking: Find Teammates!

Competition Sensitive Demo

Competition Sensitive 4 Opportunity Session: Demo

Competition Sensitive 5 Opportunity Session: Demo Energy Huntsville Member Login

Competition Sensitive 6 Opportunity Session: Demo Energy Huntsville Member Login

Competition Sensitive 7 Opportunity Session: Demo Energy Huntsville Opportunity Report

Competition Sensitive 8 Opportunity Session: Demo Energy Huntsville Opportunity Spreadsheet

Competition Sensitive 9 Opportunity Session: Demo Energy Huntsville Opportunity Spreadsheet

Competition Sensitive 10 Opportunity Session: Demo Energy Huntsville Opportunity Spreadsheet Filters

Competition Sensitive 11 Opportunity Session: Demo Energy Huntsville Opportunity Spreadsheet Filters

Competition Sensitive 12 Opportunity Session: Demo Energy Huntsville Opportunity Spreadsheet Filters

Competition Sensitive 13 Opportunity Session: Demo Energy Huntsville Opportunity Spreadsheet Filters

Competition Sensitive Opportunity Analysis

Competition Sensitive 15 Opportunity Session: UMCS ESS Current UMCS ESS Opportunity Summary Customer U.S. Army Corps of Engineers Huntsville Support Center Value $35M RFP 7/13/2011 Award Date 3/27/2012 Period of Performance 1 year base plus 4x1 year(s) option(s) Competition Type Full and Open / Unrestricted Primary Requirement Architecture and Engineering Services NAICS (size standard) ($15M) Place of Performance United States (Primary) Contract Type Firm Fixed Price IDIQ MATOC Number of Incumbents 7

Competition Sensitive 16 Opportunity Session: UMCS ESS Reported Spending by Year ($K)

Competition Sensitive 17 Opportunity Session: UMCS ESS Spending by Company

Competition Sensitive 18 Opportunity Session: UMCS ESS Reported Spending by Company ($K)

Competition Sensitive 19 Opportunity Session: UMCS ESS Upcoming UMCS ESS Opportunity Summary Customer U.S. Army Corps of Engineers Huntsville Support Center Value $47.5M RFP 9/2016 Award Date 3/2017 Period of Performance 1 year base plus 4x1 year(s) option(s) Competition Type Undetermined Primary Requirement Architecture & Engineering Services NAICS (size standard) ($15M) Place of Performance Huntsville, AL Contract Type Firm Fixed Price IDIQ MATOC Number of Incumbents 4 Numbers of Offers Received 11

Competition Sensitive 20 Opportunity Session: UMCS ESS Reported Spending by Company ($K)

Competition Sensitive 21 Opportunity Session: UMCS ESS Spending by Company

Competition Sensitive Potential Bidders

Competition Sensitive USACE Huntsville Center Prime Contractors – NAICS – Past 5 years Opportunity Session: UMCS ESS 23

Competition Sensitive Program Overview

Competition Sensitive 25 Opportunity Session: UMCS ESS Program Overview: UMCS The UMCS program supports the Army and other government agencies in the planning, design, procurement, installation, testing, and evaluation of utility monitoring and control systems. With respect to this requirement, the term "Utility Monitoring and Control System" or "UMCS" means an energy management system or building automation system that employs hardware and software to affect energy as well as manpower and equipment savings. UMCS A-E Work Encompasses… Services to investigate, plan, design, and test UMCS Building Automation Systems (BAS) SCADA SystemsHVAC Systems Alternative Energy SystemsOther Automated Control Systems Other Electrical / Mechanical Systems

Competition Sensitive Requirements Overview

Competition Sensitive 27 Opportunity Session: UMCS ESS Requirements Overview: Energy Projects Architect-Engineer (A-E) design services in support of the Utility Monitoring and Control Systems (UMCS) and Electronic Security System (ESS) Programs Energy projects can include: Note: Manpower savings may be accomplished by remotely monitoring and controlling equipment, meters, or systems which would otherwise require periodic visual observation or additional personnel Monitoring and Controlling … HVAC SystemsLighting WaterElectric Utilities Central Plant EquipmentAlternative Energy Sources

Competition Sensitive 28 Opportunity Session: UMCS ESS Requirements Overview: Electronic Security Systems ESS includes but is not limited to… ESS Requirements… Intrusion Detection SensorsCommunication, Display and Monitoring systems Electronic Entry Control Systems Closed Circuit Television Systems – including lighting Data Transmission Systems to support all elements of electronic security systems

Competition Sensitive 29 Opportunity Session: UMCS ESS Requirements Overview: Design, Test and Analysis For the UMCS and ESS Programs, the following capabilities, services, and support are typical of the kind of effort that may be required: Efforts Including… Design CriteriaInvestigating site conditions Investigation conditions of system inoperability and recommending solutions Preparing design packages and criteria documents Reviewing current criteria and designs Participating in factory tests, field tests, and engineering surveys Conducting state-of-the-art engineering analysis and other special studies

Competition Sensitive 30 Opportunity Session: UMCS ESS Requirements Overview: Project Design The level of detail and format of the design packages may vary dependent upon the complexity of the project. A complete design, including: Note: A draft operations and maintenance manual may be required for each project A complete design, including… Procurement ScheduleQuantity and Cost estimated Proposed Procure/Install Schedule Design Analyses and Calculations Design Document ReportEngineering Considerations and Instructions Report

Competition Sensitive 31 Opportunity Session: UMCS ESS Requirements Overview: Additional Requirements The contractor may also be required to provide… Note: Contractor must have the capability to provide Architect-Engineering (A-E) Title II (inspection) services on multiple installations simultaneously. Efforts Including… Program Management SupportConduct Investigations and Studies Comprehensive PlanningTests EvaluationsTechnical Reviews Analyze and Assess DataPrepare Reports and Manuals Develop and/or Review of Scopes of Work and Technical Requirements Survey and Map Prepare Conceptual DesignsPerform Value Engineering Construction Phase ServicesEquipment and Systems Commissioning and Re-commissioning

Competition Sensitive Networking

Competition Sensitive

Contact Information Matt Reed Opportunity Session Competition Sensitive