15 Oct 2008CLIC Workshop1 CTF3 Commissioning and Operation Simona Bettoni, Caterina Biscari, Roberto Corsini, Anne Dabrowski, Steffen Doebert, Andrea Ghigo,

Slides:



Advertisements
Similar presentations
Matching Injector To Linac. Caveats This is all loose and fuzzy – sort of religion We dont have real tight control over and knowledge of the machine –
Advertisements

S TEERING ALGORITHM EXPERIENCE AT CTF3 Davide Gamba 14 November 2013 The International Workshop on Future Linear Colliders LCWS13.
Commissioning August & September. 2 Agenda 11:20 Coffee 11:30 Introduction Sue S 11:35 Controls (an overview) Brian M 10:55 Controls & Data Acquisition.
Frank Tecker - BE/OP for the CTF3 Team IWLC 2010, Frank Tecker Critical Review of CTF3 performance Introduction Beam phase Improved operation.
Measurements on phase stability at CTF3 Giulio Morpurgo / CERN IWLC 2010.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Frank Tecker CTF3 Committee Last two months’ chronology Wed 23/03:first beam to end of TL1 Mon 28/03:beam to CR + factor 4 combination Thu 31/03:“near.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Update on CTF3 Operations and schedule This time I will try to give a more complete.
Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Proton beams for the East Area The beams and their slow extraction By : Rende Steerenberg PS/OP.
Eric Prebys USPAS, Knoxville, TN, Jan , 2014.
CTF3 ORBIT : TOOLS AND AUTOMATIC TUNING Davide Gamba 4 February 2014 CLIC Workshop CERN.
Injector Setup/Mini-phase  Description of injector setup  sources of drift  Mini-phase procedure for injector  Checking the rest of the machine. Stephen.
Drive Beam Linac Stability Issues Avni AKSOY Ankara University.
Transfer Line -2 Optics Design For CTF3 Amalendu Sharma, Abdurrahim, A.D.Ghodke, Gurnam Singh and V.C. Sahni Raja Ramanna Centre for Advanced Technology.
CTF3 BPMs October 18-22/2010 IWLC2010 CTF3 BPMs Lars Soby 1.
IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini1 CTF3 Probe Beam Status 1.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
#3191, 14 Oct 2012 Cabling installed to allow fast BPM electronics on injector BPMs System is flexible enough to allow different INJ-BPMs to be used (not.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
B EAM STEERING EXPERIENCE AT CTF3 Davide Gamba 14 June 2014 Americas Workshop on Linear Colliders Fermilab.
Design of an Isochronous FFAG Ring for Acceleration of Muons G.H. Rees RAL, UK.
Drive Beam Status and Issues Drive beam quality Dispersion tuning Emittance Combination issues Piotr Skowroński Ben Constance Javier Barranco … 10 October.
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
Design of the Turnaround Loops for the Drive Beam Decelerators R. Apsimon, J. Esberg CERN, Switzerland.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
1 General Status of Commissioning Piotr Krzysztof Skowroński CTF3 Collaboration Technical Meeting 27 January 2009.
1 R. Corsini – CLIC Project Meeting CTF3 Update CTF3 Update R. Corsini for the CTF3 Team 1.
… Work in progress at CTF3 … Davide Gamba 01 July 2013 Study and Implementation of L INEAR F EEDBACK T OOLS for machine study and operation.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
Beam Based Optics Measurements CTF3 Collaboration meeting CERN Yu-Chiu Chao, TJNAF.
P. Urschütz - CTF3 Collaboration Meeting 2007 CTF3 commissioning & operation in 2006 P. Urschütz for the CTF3 operations team  Commissioning of the Delay.
Principals of fast injection and extraction R. Apsimon.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
Ground motion studies at ATF2 June 11, 2014 Orbit jitter source identification via ground motion studies at ATF2 (Results of the June run) Marcin Patecki,
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
CTF3 Drive Beam studies results & Program Piotr Skowroński for the CTF3 team 30 December 2013 CLIC Workshop
Oleksiy Kononenko CERN and JINR
Tools in CTF3 Simona Bettoni for the CTF3 operation team.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
2014 Issues & Strategy execution Piotr Skowroński 18 January 2016 CLIC Workshop
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
What is needed for the operation, the resources, infrastructure issues and plans for 2009 and beyond. Impact of short shutdown in 2010 Piotr Krzysztof.
Status of CTF3 G.Geschonke 1CTF3/CLIC Collaboration Board
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
CLIC Frequency Multiplication System aka Combiner Rings Piotr Skowronski Caterina Biscari Javier Barranco 21 Oct IWLC 2010.
Beam Commissioning Adam Bartnik.
Phase Feed-Forward Piotr Skowroński (CERN)
Piotr Skowroński for the CTF3 team
First Year of Operation at the Two-beam Test Stand
Steering algorithm experience at CTF3
Slice Parameter Measurements at the SwissFEL Injector Test Facility
S. Bettoni for the CTF3 commissioning team CTF3 commissioning status
Have a chance to operate your own beam at CERN
Coupling Correction at the Australian Synchrotron
Drive Beam Status and Issues Drive beam quality Dispersion tuning Emittance Combination issues Piotr Skowroński CTF3 Meeting 9 February 2012.
Strip-line Kicker R&D at KEK-ATF
Beam-Based Alignment Results
CLIC Feasibility Demonstration at CTF3
Evaluation of 1GHz vs 2GHz RF frequency in the damping rings
Presentation transcript:

15 Oct 2008CLIC Workshop1 CTF3 Commissioning and Operation Simona Bettoni, Caterina Biscari, Roberto Corsini, Anne Dabrowski, Steffen Doebert, Andrea Ghigo, Seyd Hamed Shaker, Piotr Skowroński, Frank Tecker CLIC Workshop CERN 15 October 2008

CTF3 base line programme 15 Oct 2008CLIC Workshop2 CTF3 – R&D Issues - where fully loaded acceleration recombination x 2 phase-coding bunch length control recombination x 4 bunch compression PETS on-off two-beam acceleration structures 12 GHz structures 30 GHz Deceleration stability

15 Oct 2008CLIC Workshop3 CLIC Test Facility 3 3 TL1 & CRM commissioned fall 2006 Linac: commissioned with beam Delay Loop: commissioned with beam DL TL1 CRM CR TL2 CLEX CR commissioning since 2007 TL2 and TBTS commissioning started August 2008

15 Oct 2008CLIC Workshop4 Main Points of 2006 Delay Loop Commissioned  7A after DL  1400 ns pulse length TL1 and CR injection Commissioned  3.2A in TL1, 3A in CRM  RF injection to CR 1 2 3

15 Oct 2008CLIC Workshop55 Main Points of 2007 TL1 and CR Transfer Line 1 relatively quickly commissioned No major problems with establishing injection to CR Long and painful CR commissioning being finished only now  Fast Vertical Instability caused by the deflectors  Bad cabling of quadrupoles  Wrongly calibrated BPMs  Unstable gun  Inaccurate model of the ring current Vpos Hpos

15 Oct 2008CLIC Workshop6 Main Points of 2007 CR results Besides all the problems  We have managed to recombine the train factor 4 OK, almost 4, but the principle was shown to be valid  Perform the optics studies which enabled gradual debugging and validation of the machine model

Operations The machine is operated in two modes  PETS beam for 30GHz structures tests From Friday to Monday morning Setup is done by CTF3 team Night and weekend supervision from CCC by PS operators  Commissioning beam From Monday to Thursday Two overlapping shifts (volontary),  From 8AM to 4PM  From 2PM to 8PM PhD students tend to extend it voluntarily till 3AM 15 Oct 2008CLIC Workshop7

15 Oct 2008CLIC Workshop8 30 GHz 30GHz only DL & CR RUN 1 Today Schedule 2008 v3 DL, CR, TL2 TBTS CALIFES PETS in TBTS RUN 2 RUN 3 Installation: tail clipper Today Installation: TL2, CALIFES, TBTS, new deflectors Linac only Linac, Ring area, (CLEX)

15 Oct 2008CLIC Workshop program – Run 1 Find and repair the problem with the gun Linac  establish stable & documented working point  stability studies  diagnostic consolidation Delay Loop  Beam optics measurements  Re-establish recombinations Finish the commissioning of CR  Perform set of optics measurements  Validate the machine model  tune and  function dependence of vertical instability Test new devices and techniques  EuroTeV BPMs  Bunch length measurement with RF pickup  Transient compensation  Dispersion Free Steering and other automatic algorithms

15 Oct 2008CLIC Workshop program – Installations 1 Technical break in summer for  Complete TL2 installation  Install new deflectors (!)  Complete CLEX installations When the dump after CR was removed to make place for TL2 personnel was not allowed to enter CLEX when the beam was in DL or CR (and vice versa)

15 Oct 2008CLIC Workshop program – Run 2 Run 2  Commission the new RF deflectors  Re-setup beam recombination in CR  Full recombination with DL and CR (factor 8)  Commissioning of TL2 TBTS (no PETS) First trial for CALIFES Installations 2 (beginning of Oct)  Tail clipper Run 3  Commissioning of CALIFES TBTS (wtih PETS) Coherent Diffraction Radiation tests

Machine Setup on one slide Machine setup is based on quad scans  Beam is set-up to the screen on girder 10 Phases of acc-structures up to girder 10 are adjusted to get full loading  Twiss parameters are measured and whole linac is rematched Phase adjustment for the rest of the structures Energy profile is measured at girder 10 and elsewhere is calculated  Another quad scan is made at CTS  TL1 and is matched to the CR closed solution at this given energy If something changes at given point, we must redo the setup from there DL TL1 CRM CR TL2 CLEX

15 Oct 2008CLIC Workshop13 Beam recombination in CR is made with time variable bump (a) (b) CR Injection 2 nd deflector RF deflector field o injection line septum local inner orbits 1 st deflector

Long circulating CR beam Many measurements require long ciruclating beam in CR  Tune  Closed orbit correction  Closed orbit length measurement The beam is injected to the ring RF deflectors  The klystron timing is adjusted so the RF pulse ends when the last bunch of the train leaves the deflector  Since those are travelling wave cavities with short filling time the RF is gone before the first beam of the train comes back to the deflector  This way beam makes several hundreds turns before it irradiates too much energy thru synchrotron radiation to be fitted in the acceptance

Unstable gun Already since the first run of 2007 we observe large beam jitter that originates from the gun instability  The current is slightly different from shot to shot  Since we operate in the fully loaded mode phases are adjusted so all the RF energy is transferred to the beam bunches with different current are accelerated differently  It leads position jitter in the dispersive regions What makes the setup and measurements very hard! 15 Oct 2008CLIC Workshop15 Stable Unstable

Unstable gun (cont.) Finding the problem was difficult and tedious  the system operates on high voltage ( kV) and hence specialized knowledge and equipment is needed for investigations On top of that the device is constructed by LAL and the designer is retired  It was finally found that the high voltage power converter produces chainsaw-like signal however according to the manufacturer the device itself was OK  After inspection in-situ one of resistors was found cracked connecting capacitor bank to the ground  at low voltage the resistance was 0, but when 150kV applied than it was conducting thru arcing  And later another resistor found cracked between capacitor bank and the high voltage deck  Since than (end of September 2008) the gun behaves OK However, we are not certain that it was the core of the problem and it is going to come back at some point 15 Oct 2008CLIC Workshop16

15 Oct 2008CLIC Workshop17 Optics Studies and Model Validation The main reason for extensive optics measurements is verification that the model predicted optics well agrees with the measured one, and if they don’t  Machine was not build according to the specification  There is a bug in the model  One can not back-hand the setup with the model calculations We performed the following optics measurements  Dispersion  Response Matrix  Tunes  Combiner Ring Length  Bunch length  Quadrupole current to K1 coefficient

15 Oct 2008CLIC Workshop18 Response Matrix Register the orbit position in all BPMs Change one of the correctors Look into orbit position change (difference) Compare with the model predicted change If they do not agree, the model does not describe the machine correctly  It is relatively easy to localize the element that is badly modeled Between the element the discrepancy occurs first and the previous one or two  Even if there are more errors we still can find them If the kick is applied after the first error the pattern should agree The measurements are automatized with a MatLAB script 21 Jan 2008

15 Oct 2008CLIC Workshop19 The Response Matrix Study Already during 2007 runs response matrix study allowed to find few problems with the CR model  Current to gradient coefficient for J type magnets (5%)  Wiggler focusing Some discrepancies were still present  They were not localized in a precise location  Large statistical uncertainties originating in the gun instability did not allow to find the subtle problems quickly

15 Oct 2008CLIC Workshop20 High precision Response Matrix measurement For each corrector we performed larger set of measurements with different values of the kick, starting with very small values  Response should be linear with the kick Points that do not lay on the line defined by the majority of the (low amplitude) points are not concidered Fit to the remaining points defines the matrix element much more precisely.  The is way we reduce uncertainty of the measurement

15 Oct 2008CLIC Workshop21 Tunes We measure tunes doing FFT of a pickup analog signal using a scope  More about it in the next presentation

15 Oct 2008CLIC Workshop22 Dispersion Dispersion is measured with „line scaling” technique  All magnetic elements are scaled by some small factor This makes the beam energy mismatched to the line setup  Easier for us comparing to energy change  Allows to measure dispersion section-wise, starting at any given element  More about it in the next talk by Simona CR

15 Oct 2008CLIC Workshop23 Measurement of the ring length BPR: RF Phase Monitor Gives sum of the beam induced signal and internal frequency (3GHz) If beam has also 3GHz it measures phase offset between the two signals Simulated signal Combination factor 4 Combination factor 4 with + 5  error 1 st turn 2 nd turn 3 rd turn 4 th turn

15 Oct 2008CLIC Workshop24 BPR measurement Short pulse for many turns FFT of the BPR signal gives the ring length  f rev gives total ring length L R = (N – 1/CF) RF   f gives fractional part of ring length 1/CF RF  f = (A - B) / 2 A B Suppressed revolution frequency f REV =(A + B) / 2 BPR signal FFT

15 Oct 2008CLIC Workshop25 BPR measurement: f rev Do the measurement for different values of the wiggler current A f REV =(A + B) / 2 Theoretical f REV B f REV =(A + B) / 2 Theoretical f REV Measured LR = c  / f REV Theoretical LR = ( ) RF LR = ( ) RF

15 Oct 2008CLIC Workshop26 BPR measurement:  f expected measured Measured Lfrac = - 1/CF RF CF 5, - 1/5 RF CF 4, - 1/4 RF Expected ring length for nominal wiggler current About 1.5 mm C. Biscari

15 Oct 2008CLIC Workshop27 Linac Model Validation Current Status and Remaining Problems

There is some optics error in the area of girder 7 and 8  We see it as phase slippage in response matrix  But also when we rematch the linac, the twiss parameters measured afterwards are very close The magnetic fields on the pole surfaces where verified and are consistent with all the other magnets of this family More work is needed to nail down the problem  Additional data, for example response matrix with different quad families off, would certainly help  However, in principle we have already sufficient data to be able to find it with off-line analysis and systematic analysis should reveal the problem 15 Oct 2008CLIC Workshop28

TL1 Model Validation Discovered Bugs 15 Oct 2008CLIC Workshop29 The measured dispersion pattern in TL1 always was showing slight (just outside the error-bar) but systematic discrepancy at the last BPM Finally with the high precision response matrix measurement we found  wrong current to gradient coefficient for CT.QDF0720  Wrong drift length because of the same variable name used in CR

TL1 Model Validation Current Status and Remaining Problems We consider TL1 commissioned and its model quite well validated, although some small discrepancies remain 15 Oct 2008CLIC Workshop30

CR Model Validation Discovered Bugs 15 Oct 2008CLIC Workshop31 Already in 2007 we found  Cross-cabled control units for quadrupole’s power converters  Wrong current to gradient coefficient for J type quads Further higher precision measurements were needed to nail down the remaining discrepancies

Insufficiently precise modeling of combined function magnets for magnetic lengths for quadrupolar component is shorter then for dipolar one  We inherited the model of those magnets from EPA in which the 3 rd way of the magnet modeling was chosen However EPA had 16 of them in the ring, and CR has 12 Although all parameters were scaled accordingly and it should work for CR equally well as for EPA The modeling with the straight forward (1 st ) way give slightly better results Lowering k1 by 10% compares better with the model 15 Oct 2008CLIC Workshop32 CR Model Validation Discovered Bugs

15 Oct 2008CLIC Workshop33 CR Model Validation Current Status and Remaining Problems Response matrix  Lowering 10% quadrupolar strength for combined function magnets gives better agreement between the model and RM data for the second half of CR  But the first half still does not agree well Presumably we have more than one optics error Hopefully now machine will be more stable so we can get large range of high quality measurements with the constant conditions

K1 measurement We have attempted to measure fucusing strength of combined function magnets  We look for the magnet current that gives 180° phase advance between kicker and bpm Knowing energy and distances we get k1 Unfortunately when we did it the gun was still unstable and the result was not precise enough kicker quad bpm

15 Oct 2008CLIC Workshop35 Tune measurements  We see discrepancy with the model CR Model Validation Tune measurements

15 Oct 2008CLIC Workshop36 CR Model Validation Current Status and Remaining Problems Dispersion measurements  Close, but not enough

CR Orbit Closure

Orbit corrections Successful application of orbit correction in CR  See the next talk for more details 15 Oct 2008CLIC Workshop38 Before the correction After the correction

Steering Algorithms We have successfully, but not without problems applied following steering techniques  dispersion free  one-to-one  all-to-all 15 Oct 2008CLIC Workshop39 Comparison between results of Dispersion Free Steering and All-to-All Linac Orbit after all-to-all correction

EuroTeV BPMs We have tested the new high precision BPMs We have already tried during previous year however, we could not get full transmission thru 2nd and 3rd bpm  Turned out to be a hardware problem We have installed standard BPM after the tested triplet Measurements successfully repeated this year  See Lars talk at 4PM for the detailed results 15 Oct 2008CLIC Workshop40 Stdev 1PBPM _1.5A= 0.6µm

Bunch length measurements 15 Oct 2008CLIC Workshop41 RF pickup RF deflector + MTV screen We have two methods to measure the bunch length  Standard way with RF deflector and MTV screen  Novel non-destructive RF pickup Up to now the results are factor 2 different  See talk of Anna Dabrowski for further explanations

Combiner Ring Commissioning Instability Solved 15 Oct 2008CLIC Workshop42 Old deflectors, undamped New deflectors, damped damping loads BPM signals shoving vertical instability current BPM signals, no instability horizontal vertical

Combiner Ring Commissioning We solved many of the problems of which the most important was the instability  New deflectors were installed mid of September  Gun seems to be stable now This brought immediate effect in form of the full recombination factor 4 Now all the measurements are much easier to do and much more precise  Tune measurements  Orbit corrections Still the model does not describe the ring optics precisely enough 15 Oct 2008CLIC Workshop43

TL2 and TBTS Commissioning Strip-line kicker works well BPMs based on the new LAPP electronics work, but  30ns time jitter  Big problems with OASIS viewer The traces are digitized in-situ and analog signals are not available and we have to use this application to get them  Constant improvement in making them stably operational The beam setup was very difficult 15 Oct 2008CLIC Workshop44 Current Horizontal Vertical

TL2 and TBTS Commissioning After long fight we have managed to transport the beam till the end of TBTS, however, with 50% current loss  We have some problem with the optics, which is not diagnosed yet Either incoming CR beam is terribly mismatched  Rather doubtful since the beam is able to circulate for tens of turns in CR There is some optics error in TL2 itself, but it is difficult to diagnose not having  Full transmission  Fully operational beam monitors 15 Oct 2008CLIC Workshop45

TL2 and TBTS Commissioning We have attempted to do some optics measurements, but they were not very successful mainly due to losses along the line  One have to get somehow full transmission and only then try optics measurements

15 Oct 2008CLIC Workshop47 Conclusions Up to now, 2008 runs go relatively smoothly without any major disasters like  Vacuum leaks (2 in 2007)  Klystrons down for good (2 in 2007) It seems the problem with the unstable gun disappeared for now  But we are not really sure we have found the core of the problem and that it disappeared for good New RF deflectors installed in the Combiner Ring two weeks ago  It is confirmed now that there is no sign of the instability now  Immediately managed to get recombination factor 4  There is serious chance to finish its commissioning soon

15 Oct 2008CLIC Workshop48 Conclusions The gun  Find and repair the problem that makes unstable  Consolidation program needs to be completed Linac  Establish stable & documented working point  Stability studies  Diagnostic consolidation TL1  Optics measurements and model validation Delay Loop  Beam optics measurements  Re-establish the recombination

15 Oct 2008CLIC Workshop49 Conclusions Finish the commissioning of CR  Perform set of optics measurements Model still not validated – Optics errors still present  Validate the machine model  Tune and  function dependence of vertical instability Problem disappeared with the new deflectors Commissioning  TL2  TBTS  TBL  CALIFES Test new devices and techniques  EuroTeV BPMs  Bunch length measurement with RF pickup  Transient compensation  Dispersion Free Steering and other automatic algorithms

End

Conclusions

15 Oct 2008CLIC Workshop52 Backup Slides BACKUP

15 Oct 2008CLIC Workshop53 Beam setup procedure Linac to girder 4 We start with 3GHz (more stable) beam  Traveling Wave Tubes (TWTs) off (a) Adjust  The gun (b)  Phases of klystrons 2 and 3 (c)  The compressor chicane (d) Current in bends The slit gap to get 4-5 A beam after the chicane (e) 53 (a) (b) (c) (d) (e)

15 Oct 2008CLIC Workshop54 Beam setup procedure Linac to girder 10 Adjust the phase of MKS05 Get somehow the beam up to spectrometer 10 (a)  Usually by scaling up and down all the quadruples together Beam measurements at spectrometer 10  Energy with the slit dump Vary the bend current to get maximum signal Having current-momentum coefficient for this angle one gets energy  Twiss parameters using quad scan We vary quad strengths and measure beam profiles at screen MTV (a)

15 Oct 2008CLIC Workshop55 Beam setup procedure Optics Calculation Having  The energy profile along the whole linac Having input power to each of the accelerating structures and knowing beam current one calculates acceleration in each cavity  Twiss parameters at certain location we can calculate the optics along the machine We have the design optics however the exact magnet setting depends on  Beam provided by the injector  Energy profile that depends on the klystrons power 55

15 Oct 2008CLIC Workshop56 Beam setup procedure Linac rematch 20 Jan 2008CTF3 Collaboration Meeting, CERN56 Knowing Twiss parameters at the end of the buncher rematch the whole linac up to the Delay Loop to the nominal optics Adjust  phases of klystrons from 11 to 15  bends in The stretcher chicane Delay Loop injection

15 Oct 2008CLIC Workshop57 Beam setup procedure Optics Verification Perform quad-scans at  Spectrometer 10 To verify the rematch  Beginning of TL1 Depending on the obtained results rematch whole or part of the linac Check if the obtained energy agrees with the bends settings 20 Jan 2008CTF3 Collaboration Meeting, CERN57

15 Oct 2008CLIC Workshop58 TL1 and CR optics Adjust the optics in the Combiner Ring to  The beam energy  Wiggler current Calculate isochronous optics in TL1 to match CR

15 Oct 2008CLIC Workshop59 We start with static magnetic injection using two horizontal correctors (a)  It allows for only one turn in CR Setup the septa and the orbit Switch to the injection with the RF deflector (b)  It is an iterative procedure that involves the following steps Set RF power (amplitude) Find zero crossing phase of the RF deflector  It leaves the orbit unchanged Set the phase +/- 90° and switch off the correctors If kick is too weak or to strong adjust the power  It changes the phase That is why the procedure is iterative (a) (b) Beam setup procedure CR Injection 2 nd deflector RF deflector field o injection line septum local inner orbits 1 st deflector

15 Oct 2008CLIC Workshop60 Beam setup procedure CR Injection To setup a good injection and orbit  Short train is injected (~140ns)  RF is switched off just after the last bunch is injected It allows for long lasting beam circulation in the ring  Then it is easier to find a closed orbit  It makes possible to apply orbit correction procedures more efficiently  Allows to measure the tunes precisely

15 Oct 2008CLIC Workshop61 Orbit length in CR The orbit must have the length C r = (n t ± ¼) (it is „-” in our case) so the beam arrives exactly  1 st turn: at zero crossing phase  2 st turn: at the crest But opposite amplitude than at the injection  3 st turn: at zero crossing again Adjust the length with the wiggler 1 st 2 nd 3 rd 2 nd deflector RF deflector field o injection line septum local inner orbits 1 st deflector o /4

15 Oct 2008CLIC Workshop62 Beam Setup In theory the whole procedure could be completed within a couple of weeks  If, and only if, the machine is Stable Reliable Whenever any device changes its parameters the procedure needs to be restarted from the point the device sits! 21 Jan 2008

Schedule 2008 v1 15 Oct 2008CLIC Workshop 63 DL, CR, TL2 TBTS CALIFES PETS in TBTS RUN 1 RUN 2 RUN 3 Installation: tail clipper Installation: TL2, CALIFES, TBTS, new deflectors Today Delayed 2 weeks ? Linac only Linac, Ring area, (CLEX) 30 GHz DL & CR

15 Oct 2008 CLIC Workshop64 DL, CR, TL2 TBTS 30 GHz 30GHz only CALIFES DL & CR PETS in TBTS RUN 1 RUN 2 RUN 3 Today Installation: TL2, CALIFES, TBTS, new deflectors Schedule 2008 v2 Linac only Linac, Ring area, (CLEX) Installation: tail clipper

Gun HV stability 15 Oct 2008CLIC Workshop65 Stable Unstable Stable Unstable It must be the Gun HV instability since 0290 is only after buncher, whichs phase does not play a role for bunch length

15 Oct 2008CLIC Workshop66 Bunch length Intensity Bunch length(mm) Klystron 13 Phase(degree) The bunch length achieved by measuring the intensity of a thin band at middle of screen for each RF deflector phase and fitting a Gaussian distribution. The standard deviation of this chart is related to bunch length by c/f constant. c is speed of light and f=1.5 GHz is frequency of RFD. The errors are large due to the beam jitter but is good for first measurement by this method RF Deflector Phase(degree) l b = 2.68±0.60 mm

15 Oct 2008CLIC Workshop67 We start with static magnetic injection using two horizontal correctors (a)  It allows for only one turn in CR Setup the septa and the orbit Switch to the injection with the RF deflector (b)  It is an iterative procedure that involves the following steps Set RF power (amplitude) Find zero crossing phase of the RF deflector  It leaves the orbit unchanged Set the phase +/- 90° and switch off the correctors If kick is too weak or to strong adjust the power  It changes the phase That is why the procedure is iterative (a) (b) Machine setup – 2nd slide CR Injection 2 nd deflector RF deflector field o injection line septum local inner orbits 1 st deflector