Status of LIGO Andri M. Gretarsson Livingston Observatory LIGO-G040248-00-L.

Slides:



Advertisements
Similar presentations
Laser Interferometer Gravitational-wave Detectors: Advancing toward a Global Network Stan Whitcomb LIGO/Caltech ICGC, Goa, 18 December 2011 LIGO-G v1.
Advertisements

LIGO- G M State of the LIGO Lab Stan Whitcomb LSC meeting Hanford 17 August 2004.
LIGO-G M 1 Conceptual Design Review: Initial LIGO Seismic Isolation System Upgrade Introduction Dennis Coyne April 12, 2002.
LIGO-G0200XX-00-M LIGO Laboratory1 Pre-Isolation Dennis Coyne LIGO Laboratory NSF LIGO Annual Review, at MIT 23 October 2002.
LIGO-G9900XX-00-M LIGO Status and Plans Barry Barish 5 June 2000 Gravitational Waves: A Challenge to Theoretical Astrophysics Trieste, 5-9 June 2000.
Status of the LIGO Project
LIGO-G M LIGO Laboratory1 Pre-Isolation Dennis Coyne LIGO Laboratory NSF LIGO Annual Review, at MIT 23 October 2002.
LIGO-G W Raab: Searching for Gravitational Waves w/ LIGO1 Why Has Duty Cycle Been Lower in Livingston.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
LIGO-G W Report on LIGO Science Run S4 Fred Raab On behalf of LIGO Scientific Collaboration.
LIGO-G D 1 Requirements Environment and constraints Performance requirements Functional requirements.
Overview Ground-based Interferometers Barry Barish Caltech Amaldi-6 20-June-05.
LIGO-G M Status of LIGO Barry Barish PAC Meeting Caltech 3-June-04 Upper limits on known pulsar ellipticities.
LIGO-G M State of LIGO Barry Barish LSC Meeting LLO Hanford, WA 10-Nov GEO -- L 2km -- H 4km -- L 4km h0h0 S1 sensitivities.
Gravitational Wave Detectors: new eyes for physics and astronomy Gabriela González Department of Physics and Astronomy Louisiana State University.
G D Tasks After S3 Commissioning Meeting, Oct 6., 2003 Peter Fritschel, Daniel Sigg.
1 LIGO-G D LIGO Commissioning PAC Meeting, 18 May 2005, LIGO Livingston Joe Giaime, LSU & LLO, for the entire commissioning team. PAC Meeting,
G D Initial LIGO improvements & Advanced LIGO P Fritschel PAC Meeting LLO, 18 May 2005.
LIGO-G D Installation and Commissioning Status Stan Whitcomb Program Advisory Committee 14 June 2001 Caltech.
The GEO 600 Detector Andreas Freise for the GEO 600 Team Max-Planck-Institute for Gravitational Physics University of Hannover May 20, 2002.
LIGO-G Z LIGO Commissioning Report LSC Meeting, Hanover August 19, 2003 Peter Fritschel, MIT.
LIGO- G M Status of LIGO David Shoemaker LISA Symposium 13 July 2004.
Status of LIGO Aspen January, 2005 Nergis Mavalvala LIGO-G D Commissioning and detector improvements for S4.
LIGO G M Introduction to LIGO Stan Whitcomb LIGO Hanford Observatory 24 August 2004.
LIGO-G W Commissioning and Performance of the LIGO Interferometers Reported on behalf of LIGO colleagues by Fred Raab, LIGO Hanford Observatory.
Status of LIGO Data Analysis Gabriela González Department of Physics and Astronomy Louisiana State University for the LIGO Scientific Collaboration Dec.
LIGO-G D Enhanced LIGO Kate Dooley University of Florida On behalf of the LIGO Scientific Collaboration SESAPS Nov. 1, 2008.
LIGO- G D Status of LIGO Stan Whitcomb ACIGA Workshop 21 April 2004.
1 Environmental Coupling During S5 Robert Schofield (University of Oregon) I. PEM injection overview II.Acoustic/seismic coupling III.Seismic upconversion.
G Amaldi Meeting 2015, Gwangju, South Korea1 Status of LIGO June 22, 2015 Daniel Sigg LIGO Hanford Observatory (on behalf of the LIGO Scientific.
LIGO-G D The LIGO-I Gravitational-wave Detectors Stan Whitcomb CaJAGWR Seminar February 16, 2001.
LIGO- G D The LIGO Instruments Stan Whitcomb NSB Meeting LIGO Livingston Observatory 4 February 2004.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
G D Commissioning Progress and Plans Hanford Observatory LSC Meeting, March 21, 2005 Stefan Ballmer.
LIGO Commissioning Status
LIGO-G Z Guido Mueller University of Florida For the LIGO Scientific Collaboration ESF Exploratory Workshop Perugia, Italy September 21 st –23.
LIGO-G D Commissioning and Detector Plans Stan Whitcomb Program Advisory Committee 6 June 2003 Caltech.
LIGO-G D LIGO Detector Performance Michael E. Zucker LIGO Livingston Observatory NSF Review of the LIGO Laboratory 17 November, 2003 at LIGO Livingston.
1 LESSONS FROM VIRGO+ May 17th 2010 E. Calloni for the Virgo collaboration.
LIGO-G D 1 Status of Detector Commissioning LSC Meeting, March 2001 Nergis Mavalvala California Institute of Technology.
TCS and IFO Properties Dave Ottaway For a lot of people !!!!!! LIGO Lab Kavli Institute for Astrophysics and Space Research, Massachusetts Institute of.
LIGO-G W LIGO Detector Commissioning Reported on behalf of LIGO colleagues by Fred Raab, LIGO Hanford Observatory.
G D LIGO Commissioning Update LSC Meeting, Nov. 11, 2003 Daniel Sigg.
LIGO- G D E7: An Instrument-builder’s Perspective Stan Whitcomb LIGO Caltech LSC Meeting Upper Limits Plenary Session 22 May 2002 LIGO Livingston.
International Gravitational Wave Network 11/9/2008 Building an Stefan Ballmer, for the LIGO / VIRGO Scientific Collaboration LIGO G
LIGO-G M LIGO Status Gary Sanders GWIC Meeting Perth July 2001.
Initial and Advanced LIGO Status Gregory Harry LIGO/MIT March 24, 2006 March 24, th Eastern Gravity Meeting G R.
LIGO-G D Commissioning at Hanford Stan Whitcomb Program Advisory Committee 12 December 2000 LIGO Livingston Observatory.
23/7/2003LIGO Document G C1 LIGO S2 Overview Philip Charlton California Institute of Technology On behalf of the LIGO Scientific Collaboration.
LIGO-G W Prospects for the S5 Run Fred Raab, LIGO Hanford Observatory November 8, 2005.
LIGO- G M LIGO Status Stan Whitcomb Oversight Committee 20 October 2004.
LIGO-G D Advanced LIGO Systems & Interferometer Sensing & Control (ISC) Peter Fritschel, LIGO MIT PAC 12 Meeting, 27 June 2002.
October 2006, LIGO Hanford Observatory
Aspen January, 2005 Nergis Mavalvala
Reaching the Advanced LIGO Detector Design Sensitivity
Fred Raab, LIGO Hanford Observatory November 8, 2005
Commissioning Progress and Plans
Installation and Commissioning Status Stan Whitcomb
Nergis Mavalvala MIT IAU214, August 2002
Commissioning Update PAC 15, Dec. 11, 2003 Daniel Sigg.
Commissioning the LIGO detectors
Workshop on Gravitational Wave Detectors, IEEE, Rome, October 21, 2004
LIGO Detector Commissioning
Status of the LIGO Detectors
LIGO Detector Commissioning
LIGO Interferometry CLEO/QELS Joint Symposium on Gravitational Wave Detection, Baltimore, May 24, 2005 Daniel Sigg.
P Fritschel LSC Meeting LLO, 22 March 2005
Improving LIGO’s stability and sensitivity: commissioning examples
Presentation transcript:

Status of LIGO Andri M. Gretarsson Livingston Observatory LIGO-G L

Timeline Now First Science Data Inauguration E1 Engineering E2 E3 E4E5E6 E7 E8 E9 S1 Science S2S3 First LockFull Lock all IFO's strain noise 200 Hz [Hz -1/2 ] Runs E

Commissioning Progress

Aug 03 Commissioning Progress (2) Feb 03 Aug 02 Jan 02 May 01 Feb 04

S3...best yet S2 2 nd Science Run Feb - Apr 03 (59 days) S1 1 st Science Run Sept 02 (17 days) S3 3 rd Science Run Nov 03 – Jan 04 (70 days) LIGO Target Sensitivity S3 Duty Cycle Hanford 4km 69% Hanford 2km 63% Livingston 4 km 22%* * Limited by high ground noise

BNS inspiral range (8 sigma, average direction)

S1 results are “out” Papers by the LIGO Science Collaboration (~370 authors, 40 institutions): “Detector Description and Performance for the First Coincident Observations between LIGO and GEO”, Nucl.Instrum.Meth. A517 (2004) , gr-qc/ “Setting upper limits on the strength of periodic gravitational waves using the first science data from the GEO600 and LIGO detectors” gr-qc/ , accepted for publication in PRD “Analysis of LIGO data for gravitational waves from binary neutron stars”, gr-qc/ , being reviewed by PRD “First upper limits from LIGO on gravitational wave bursts ”, gr- qc/ , accepted for publication in PRD “Analysis of First LIGO Science Data for Stochastic Gravitational Waves”, gr-qc/ , submitted for publication in PRD S2 analysis in progress, S3 data awaits...! See Stan Whitcomb’s talk.

Sensitivity improvements in the past year (or so) More wavefront sensors on-line (esp. H1) Reduced acoustic coupling Power increase Adaptive LSC gains On H1, found DC alignment sweet-spot (using QPD offset) Linear power supplies...many many smaller things leading to significant broadband noise reduction (esp. H1)

WFS system (mostly) running wavefront sensor degree of freedom light sampled Like LSC sensor WFS 1ETMdASAS_Q WFS 2AITMcPOYPOB_I WFS 2BITMdPOYPOB_Q WFS 3MMTREFLREFL_I WFS 4ETMcREFLREFL_I

Effect of wavefront sensors 20 min

Effect of wavefront sensors (2) 7 hrs 11 hrs

Acoustic Mitigation Primary sources: »Building HVAC »Electronics cooling fans Removed microphonic optics (clipping) »opened to 2” clear aperture at critical locations »EO shutters removed at ISCT4 and ISCT1 »stiffened & damped beam delivery periscopes Installed acoustic enclosures on dark ports Results: »>10x from reducing clipping ~10x from acoustic enclosure »No acoustic peaks left in S3 spectra and reduced broadband in H1 in the decade around ~100 Hz »H1 - H2 correlations substantially reduced

Acoustic Mitigation (2) S2 S3 with acoustic injections at ISCT4 with acoustic injections at ISCT4 and ISCT1 Microphone: normal with injections Displacement Spectra

H1-H2 Correlations Reduced

Power increase LHO: 0.8 T 2.0 W LLO: 1.6 T 4.2 W nspob (cts) Input power (Watts) LHO

Vacuum incursions LHO 2k ITMX replaced in April 2003 due to damaged AR coating LHO 2k MMT1 reinstalled June 2003 after suspension wire failure LLO ITMY moved by 2 cm in July 2003 to optimize recycling cavity length w=26 +/- 4 mm (at y = 1 mm) Beam intensity width = 23 mm ?

The coming year Improvements to current systems »HEPI »More power »Increase WFS bandwidth and turn off optical levers »Electronics EMI/RFI and acoustic mitigation –move racks –separate analog/digital parts, –new RFI-proof racks New systems/configurations »Output modecleaner »Thermal compensation system »Photon Calibrator »Cesium clock timing

Rack relocation and analog-digital separation

LLO seismic noise amelioration badly needed PRE-ISOLATOR REQUIREMENT (95% of the time) Livingston Hanford RMS motion in 1-3 Hz band l Anthropogenic » Mostly logging and trains » Science data only available at night » Even night-level alignment fluctuations cause significant non-stationarity l Microseism due to ocean waves » Locking difficult/impossible for several days at a time » worse in winter (high- microseism activity several times/month) meters Locking Threshold

~6 months install period for hydraulic external pre- isolators Prototype tested at Stanford and MIT Fabrication nearly complete, installation just beginning HEPI MIT test OFFLOAD SPRINGS HYDRAULIC LINES & VALVES CROSSBEAM PIER HYDRAULIC ACTUATOR ( HORIZONTAL )

TCS is needed for proper thermal lensing Original "point design" depends on specific, balanced thermal lensing Sidebands aren’t properly matched into the recycing cavity without the thermal lens RF sideband efficiency found to be very low »H1 efficiency: ~6% (anti-symmetric port relative to input) DC (carrier)RF Bad mode overlap

Initial thermal compensation system Modify the test mass radii of curvature by adding/subtracting appropriate thermal lens correct absorption mismatches between test masses and (possibly) absorbtion inhomogeneities