Recommendations for Applying the Critical Elements Methodology.

Slides:



Advertisements
Similar presentations
A forum for coordinating state, federal, and tribal watershed and salmon monitoring programs in the Pacific Northwest Pacific Northwest Aquatic Monitoring.
Advertisements

VADEQ Biological Monitoring Self Assessment NPS/TMDL/WQM/WQS Region 3 Program Annual Meeting MAY 2009 NPS/TMDL/WQM/WQS Region 3 Program Annual Meeting.
Strengthening the State- Tribal-Federal Partnership to Assess the Condition of Nations Waters.
SHELLY POTTS, PH.D. UNIVERSITY OFFICE OF EVALUATION AND EDUCATIONAL EFFECTIVENESS ARIZONA STATE UNIVERSITY Quality Assurance Mechanisms.
CARICOM. Ninth EDF Project Caribbean Integration Support Programme (CISP ) Statistics Component 34th MEETING OF THE STANDING COMMITTEE OF CARIBBEAN STATISTICIANS.
Clean Water Act Integrated Planning Framework Sewer Smart Summit October 23, 2012.
Summary of Biological Assessment Programs and Biocriteria Development for States, Tribes, Territories, and Interstate Commissions: Streams and Wadeable.
Comprehensive M&E Systems
Center for Health Care Quality Licensing & Certification Program Evaluation 1 August 2014 rev.
Environmental health indicators Caroline Wicks March 17, 2006 Cooperative Oxford Laboratory.
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
Dimensions of Data Quality M&E Capacity Strengthening Workshop, Addis Ababa 4 to 8 June 2012 Arif Rashid, TOPS.
Piloting the Household Vulnerability Index to Improve Targeting in WVI programmes in Lesotho, Swaziland and Zimbabwe Tendayi Kureya
McCann Associates Presented by: Michael Childs, Barbara Dyer, Ira Taylor, Bruce Nugyen Chad Warner & Joe Koury, McCann Associates.
Wetland Monitoring and Assessment National Water Quality Monitoring Council Meeting August 20, 2003.
STRENGTHENING the AFRICA ENVIRONMENT INFORMATION NETWORK An AMCEN initiative A framework to support development planning processes and increase access.
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
PILOT PROJECT: External audit of quality assurance system on HEIs Agency for Science and Higher Education Zagreb, October 2007.
Lake Erie HABs Workshop Bill Fischbein Supervising Attorney Water Programs March 16, 2012 – Toledo March 30, Columbus.
8/29/2006 DRAFT Implementing an Adaptive Management Framework for the Fish and Wildlife Program DRAFT.
A forum for coordinating state, federal, and tribal aquatic monitoring programs in the Pacific Northwest Pacific Northwest Aquatic Monitoring Partnership.
Do it pro bono. Strategic Scorecard Service Grant The Strategy Management Practice is presented by Wells Fargo. The design of the Strategic Scorecard Service.
Nevada Bioassessment Program Statewide & on the Truckee River Nevada Division of Environmental Protection Bureau of Water Quality Planning Karen Vargas.
Monitoring and Evaluation in MCH Programs and Projects MCH in Developing Countries Feb 10, 2011.
1 What are Monitoring and Evaluation? How do we think about M&E in the context of the LAM Project?
1 Module OVERVIEW OF EXTERNAL QUALITY ASSESSMENT.
Chris O. Yoder Center for Applied Bioassessment & Biocriteria Midwest Biodiversity Institute Critical Elements of State.
AdriaMed Expert Consultation Interactions between capture fisheries and aquaculture Rome, Italy November st Coordination Committee (2000)
An Online Knowledge Base for Sustainable Military Facilities & Infrastructure Dr. Annie R. Pearce, Branch Head Sustainable Facilities & Infrastructure.
Transregional Workshop – Sofia, October 30, 2008 R4R Tools and Methodologies.
Presented by: Meg Boyd The Blue Mountains Drinking Water System: DWQMS Overview.
Workshop on Programming in support of Anti-Corruption Agencies Bratislava, 30 June - 1 July 2009 A methodology for capacity assessment of AC agencies:
Sustaining Long Term Regional Coordinated Monitoring Programs Todd Running, H-GAC May 9, 2006.
EXPECTED CONDITION Introduction to Some Basic Concepts for the Development of Colorado’s Conceptual Model.
A forum for coordinating state, federal, and tribal aquatic monitoring programs in the Pacific Northwest Pacific Northwest Aquatic Monitoring Partnership.
CRITICAL TECHNICAL ELEMENTS FOR A BIOASSESSMENT PROGRAM Michael T. Barbour, Tetra Tech Chris O. Yoder, MBI.
Quality assurance / Quality control system for the Greek GHG emissions inventory Yannis Sarafidis, Elena Georgopoulou UNFCCC Workshop on National Systems.
Support of the Framework for Monitoring Office of Management and Budget March 26, 2003.
1 Survey of the Nation’s Lakes Presentation at NALMS’ 25 th Annual International Symposium Nov. 10, 2005.
United States Department of Agriculture Food Safety and Inspection Service 1 National Advisory Committee on Meat and Poultry Inspection August 8-9, 2007.
Implementing QI Projects Title I HIV Quality Management Program Case Management Providers Meeting May 26, 2005 Presented by Lynda A. O’Hanlon Title I HIV.
NWQMC May 8, 2006 KEY ISSUES AND UNDERLYING CONCEPTS IN USE ATTAINABILITY ANALYSES FOR AQUATIC LIFE DESIGNATED USES Chris O. Yoder Center for Applied.
A forum for coordinating state, federal, and tribal aquatic monitoring programs in the Pacific Northwest Pacific Northwest Aquatic Monitoring Partnership.
National Commission for Academic Accreditation & Assessment Developmental Reviews at King Saud University and King Faisal University.
EPA’s Bioassessment Performance and Comparability “Guidance”
REGIONAL COORDINATION High Level Indicators Draft “white paper” to recommend a core set indicators that can be shared among all types of monitoring Protocol.
KBA Conservation Network Wanglang Nature Reserve, June 5-8, 2007.
Benthic Community Assessment Tool Development Ananda Ranasinghe (Ana) Southern California Coastal Water Research Project (SCCWRP) Sediment.
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
DWA: WATER QUALITY MONITORING TASKS. TENDER DOCUMENT Aim: develop a systematic monitoring protocol that will determine possible impacts of natural and.
INTEGRATED ASSESSMENT AND PLANNING FOR SUSTAINABLE DEVELOPMENT 1 Click to edit Master title style 1 Evaluation and Review of Experience from UNEP Projects.
Systems Accreditation Berkeley County School District School Facilitator Training October 7, 2014 Dr. Rodney Thompson Superintendent.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Module 11 Biological Criteria
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
EU Project: Trans-Boundary River Management Phase II and Phase III for the Kura River basin – Armenia, Georgia, Azerbaijan ( Transboundary.
Overview of Critical-Path Implementation Requirements Infrastructure required for successful program launch includes: Emissions & Allowance Tracking System.
Monitoring Afghanistan, 2015 Food Security and Agriculture Working Group – 9 December 2015.
Update on the NADP Atmospheric Mercury Initiative Developing a new coordinated and collaborative approach to atmospheric mercury monitoring A Briefing.
Born from the Governor’s efforts to engage all stakeholders to solve problems Designed to provide technical support to local organizations ODEQ Program.
A forum for coordinating state, federal, and tribal aquatic monitoring programs in the Pacific Northwest Pacific Northwest Aquatic Monitoring Partnership.
ORGANIZATION CAPACITY ASSESSMENT (2013) Produced in April 2013.
Development of Gender Sensitive M&E: Tools and Strategies.
Aquatic Resource Monitoring Overview Anthony (Tony) R. Olsen USEPA NHEERL Western Ecology Division Corvallis, Oregon (541)
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Superior Infrastructure – Phase One Lenora Chapman & Michelle Stevenson Presenting.
Development Account: 6th Tranche Strengthening the capacity of National Statistical Offices (NSOs) in the Caribbean Small Island Developing States to fulfill.
Module 2 National IEA Process Design and Organization Stakeholder’s consultative workshop/ Training on Integrated assessments methodology ECONOMIC VALUATION.
Introduction- Link with WG E activity CMEP PLENARY MEETING-PRAGUE
IBI’s: An Introduction
Presentation transcript:

Recommendations for Applying the Critical Elements Methodology

State Tribal Program Evaluations: Key Steps On-site evaluation of state and tribal bioassessment program, facilities, and capacities (2-3 days each). On-site evaluation of state and tribal bioassessment program, facilities, and capacities (2-3 days each). Interactive interview with state/tribal program managers and staff – includes bioassessment and WQS programs at minimum. Interactive interview with state/tribal program managers and staff – includes bioassessment and WQS programs at minimum. Systematic compilation and analysis of technical aspects including methods, indicators, bioassessment process, WQS (ALUs), and capacity to support all water quality management programs. Systematic compilation and analysis of technical aspects including methods, indicators, bioassessment process, WQS (ALUs), and capacity to support all water quality management programs. Documents strengths and fosters a continuous improvement process. Documents strengths and fosters a continuous improvement process.

“... ambient monitoring and assessment should function to support all relevant water quality management programs in addition to its more commonplace role of supporting status assessments.” Key Premise “M&A program design in some states has been driven predominantly by status.” Key Finding Region V States Program Evaluation (2002-5)

Goals and Desired Outcomes  Achieve better integration between monitoring & assessment and WQS – will foster more consistent use of M&A in water programs  Better M&A support for all water programs  Improved delineation along a Biocondition Gradient (BCG)  Refined designated uses (TALU) – benefits to programs  Improved determination of status and trends

Biological Assessment & Water Quality Standards in Illinois Presented by Roy Smogor (IEPA) at the December 2005 Region V TALU Implementation Workshop

Technical Element Description Level Bug & fish collected in “summer” period (June 01-October 15) > 3 Semi-fixed sites, statewide distribution, site info extrapolated to reach (1 to 50 miles, depending on stream size & various factors based on BPJ) < 2 Fish IBI accounts for variation among regions within Illinois; within each region, among stream sizes (width) & slopes. Bug IBI does not address inter- or intraregional variation. < 3 Bug & fish IBIs based on regional reference conditions defined largely independently of biological attributes (metrics). Facility surveys (using bugs) based on comparison to upstream rather than regional reference. 4 ? Bugs w/resolution typically to genus (otherwise lowest possible) & fish to species; no formal certification program for taxonomic identification > 3 Bug & fish methods defined in SOPs; no formal training certification; bugs collected only by experienced biologists; fish collected under supervision of at least one experienced biologist > 3 Bugs: formal QA/QC’d subsampling procedure & ID checks; ID workshops. Fish: IDs verified by expert; less-formal QA/QC. 3 Bug & fish IBIs include attributes based on taxa-specific general tolerance, taxon richness, trophic & reproductive structure (richness & proportional abundance of ecological guilds); no measures of condition of individuals < 3 For IBIs, formal link to absolute scale of biological integrity and CWA aquatic-life goal; 5 integrity classes; no explicit link to specifics of BCG, but conceptually consistent w/BCG < 4 Limited formal development of biological attributes to diagnose causes; mostly BPJ when diagnosing causes based on biological info < 2 Temporal coverage Spatial coverage Natural classification Reference conditions Reference-condition criteria Indicator assemblages Sample collection Sample processing Ecological attributes Biological endpoints & thresholds Diagnostic capability Professional review & documentation Stakeholder involvement & review from start; limited peer review outside IEPA & stakeholders; formal documentation lacking for fish IBI < 3

Start-Up Tasks: Logistics Acquire Staffing: INITIAL ASSESSMENT PHASE Bioassessment and Biocriteria Program Development Timeline 0-18 MONTHS MONTHS 18 MO – 6 YEARS 5 – 10 YEARS Quality Improvement Process Continuously evaluate program Evaluate effectiveness of initial decisions – make needed adjustments INITIAL DEVEOPMENT PHASE  Professional biologists with expertise & training  Database manager  Interns/technicians (field work, lab tasks Acquire Facilities & Equipment:  Outfit laboratory and field facility  Office accommodations  Database support infrastructure Start-Up Tasks: Implementation Methods Development:  Review and select candidate methods and protocols  Consider MQO/DQO needs  Test methods for applicability  Analyze test results – select methods Initiate Field Sampling:  Review spatial designs  Develop QA/QC and QAPP  Develop sampling plans in accordance with monitoring strategy  Pilot assessments Classification Issues:  Consider spatial stratification issues  Develop and test reference condition approach  Select and sample reference sites  Develop index development and calibration strategy Program Implementation Biocriteria Development:  Select candidate metrics and/or assessment tools  Develop refined uses - narratives  Test metrics and develop calibrated indices  Evaluate via bioassessments Water quality Program Support:  Develop capacity to support WQ programs (WQS/UAAs, TMDLs, permits, planning)  Formalize water quality program support as capacity is developed Program Maintenance Biocriteria Development:  Refine metrics and develop calibrated indices  Develop reference benchmarks for calibrated indices according to classification scheme and by major aquatic ecotype Water quality Program Support:  Fully functioning bioassessment program supports WQS (UAAs, aquatic life use support) and basic program needs (305b/303d)  Program development should be fully initiated – e.g., integrated chemical, physical, and biological database supports criteria & policy development FULL ASSESSMENT PHASE INITIAL IMPLEMENTATION PHASE Develop refined uses-narratives Develop capacity to support WQ programs (WQS/UAAs, TMDLs, permits, planning) Formalize water quality program support as capacity is developed -Consider spatial stratification issues -Select and sample reference sites Fully functioning bioassessment program supports WQS (UAAs, aquatic life use support) and basic program needs (305b/303d) Program development should be fully initiated – e.g., integrated chemical, physical, and biological database supports criteria & policy development Develop reference benchmarks for calibrated indices according to classification scheme and by major aquatic ecotype Consider MQO/DQO needs Illinois EPA needs work: Database manager Database support infrastructure Review spatial designs

Summary of Recommendations: I Requires an on-site, interactive interview of state/tribal managers and staff. Review and evaluation of key technical details including methods, processes, and facilities Technical expertise in bioassessment methods and design is needed to facilitate and conduct the interview process and produce a program evaluation. Should be an ongoing and iterative process.

Summary of Recommendations: II Establish regional bioassessment working groups comprised of state/tribal biologists and EPA regional staff. State/regional training workshops on the critical elements process. Complementary to ongoing activities with TALU and related issues (BCG, biocriteria, integrated reporting, etc.).