AGS RSVP Weekly Meeting P. Pile 16 December 2004 AGS RSVP Weekly Meeting 16 Dec 2004 Useful Links: RSVP Project :

Slides:



Advertisements
Similar presentations
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
Advertisements

Executive Session Director’s CD-1 Follow-Up Review of the APUL Project November 2-3, 2009 Dean A. Hoffer.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
MIS 2000 Class 20 System Development Process Updated 2014.
1 Schedule Risk Assessment (SRA) Overview July 2013 NAVY CEVM.
IS 421 Information Systems Management James Nowotarski 16 September 2002.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Measuring What Matters November 7 th Agenda Review and update of tasks and timeline Review and update of tasks and timeline Role of RTF Role of.
January 8, 2009 TAC Texas Nodal Program Implementation: P rogram Update Ron Hinsley.
1 Draft NYISO 2003 Budget Report BS&P Report to Management Committee October 16, 2002.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Z26 Project Management Introduction lecture 1 13 th January 2005
AGS RSVP Weekly Meeting P. Pile 27 Jan 2005 AGS RSVP Weekly Meeting 27 Jan 2005 Useful Links: RSVP Project : C-AD.
U.S. MICE Schedule, Cost, & Risks Peter H. Garbincius Mark Palmer, Alan Bross, Rich Krull Fermilab Presented at RAL – November 13, 2013.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
® © 2009 Open Geospatial Consortium, Inc. Starting an Interoperability Experiment David Arctur, OGC Director, Interoperability Programs December 8, 2009.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
AGS RSVP Weekly Meeting P. Pile 18 November 2004 AGS RSVP Weekly Meeting, 18 Nov 2004 Useful Links: RSVP Project : C-AD AGS Project:
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Research & Technology Implementation TxDOT RTI OFFICE.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
July 9, 2007 TPTF Meeting Texas Nodal Program Update Jerry Sullivan.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
AGS RSVP Weekly Meeting P. Pile 16 September 2004 AGS RSVP Weekly Meeting, 16 Sep 2004 AGS Project Office - status of funding, comments on RSVP
AGS RSVP Weekly Meeting P. Pile 14 Apr 2005 AGS RSVP Weekly Meeting 14 Apr 2005 Useful Links: RSVP Project : C-AD.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Fresno County Employees’ Retirement Association Strategic Planning Presented by Tom Iannucci Cortex Applied Research February 20, 2008.
AGS RSVP Weekly Meeting P. Pile 17 Mar 2005 AGS RSVP Weekly Meeting 17 Mar 2005 Useful Links: RSVP Project : C-AD.
1 RSVP Project Director’s Review with Laboratory Oversight Group Attendance Jan 2005 WBS 1.4.5, AGS Project Office (and WBS Beam Development)
Introducing Project Management Update December 2011.
1 ILC Internal Cost Review Major Points from External Reviewers T. Elioff, J. Marx, V. Soergel, M. Yoshioka, and A. Yamamoto, (C. Wyss, absent) To be presented.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
BNL/AGS RSVP Upgrades Project WBS 1.4 – Breakout Session Rare Symmetry Violating Processes Preliminary Baseline Review Brookhaven National Laboratory 6-8.
AGS RSVP Weekly Meeting P. Pile 2 December 2004 AGS RSVP Weekly Meeting 2 Dec 2004 Useful Links: RSVP Project : C-AD AGS Project: Office.
PNISG Update June Xoserve’s UKLP Assessment Principles 1.Maintain current delivery plans where possible and appropriate e.g. don’t just push all.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
ITPD ISSUE MANAGEMENT PROCESS SEPTEMBER 5, 2008
Maintaining and Sustaining System Integrity Configuration Management for Transportation Management Systems Configuration management (CM) describes a series.
AGS RSVP Weekly Meeting P. Pile 30 December 2004 AGS RSVP Weekly Meeting 30 Dec 2004 Useful Links: RSVP Project :
1 AGS RSVP Review 4-5 November 2004 Upgrade and Operations Cost & Schedule Summary Philip Pile Collider-Accelerator Department 4 Nov 2004.
1 RSVP Cost and Schedule Review 9 December 2004 AGS Upgrades Philip Pile WBS 1.4 Project Manager.
AGS RSVP Weekly Meeting P. Pile 24 Mar 2005 AGS RSVP Weekly Meeting 24 Mar 2005 Useful Links: RSVP Project : C-AD.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
AGS RSVP Weekly Meeting P. Pile 6 Jan 2005 AGS RSVP Weekly Meeting 6 Jan 2005 Useful Links: RSVP Project : C-AD.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
AGS RSVP Weekly Meeting P. Pile 10 Feb 2005 AGS RSVP Weekly Meeting 10 Feb 2005 Useful Links: RSVP Project : C-AD.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Transmission Advisory Group NCTPC Process Update Rich Wodyka September 7, 2006.
1 AGS RSVP Review 4-5 November 2004 Management Issues Philip Pile Collider-Accelerator Department 4 Feb 2004.
GAO’s Cost and Schedule Assessment Guides U.S. Government Accountability Office Applied Research and Methods Cost Engineering Sciences Jason T Lee, Assistant.
AGS RSVP Weekly Meeting P. Pile 10 Mar 2005 AGS RSVP Weekly Meeting 10 Mar 2005 Useful Links: RSVP Project : C-AD.
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
PROPOSED STRATEGIC PLANNING PROCESS DECEMBER 3, 2014 Port of Port Angeles.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
Standard Design Process Overview
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
Camera PDR/CD1 Planning 19 September 2008
Introductory Remarks and Meeting Goals
Status of the Planning Working Group’s (PWG) Efforts
Preparations for a Lehman Review
Presentation transcript:

AGS RSVP Weekly Meeting P. Pile 16 December 2004 AGS RSVP Weekly Meeting 16 Dec 2004 Useful Links: RSVP Project : C-AD AGS Project: Office Agenda Review updates (pile) Status of cost scrubbing and resource loaded schedules (must be ~complete by 15 Jan, in time for the LOG review), in addition to what has been done, SHOW ROAD MAP TO COMPLETION! - (Brown,Pendzick,Phillips and Pearson) Beam development plan, Case 1 and 2 update (Ahrens)

AGS RSVP Weekly Meeting P. Pile 16 December Nov 04 AGS Review - Update Committee Report is on the web at: I haven’t received guidance from the RSVP Project Office concerning this document…read it and stay tuned

AGS RSVP Weekly Meeting P. Pile 16 December Nov 04 AGS Review - Update Some Comments from the report – Executive Summary The Committee concluded that the proposed scope of new work accounting for the increased budget requests was reasonable and clearly desirable. Only in the area of Beam Development was the Committee able to suggest a significant potential cost saving, namely reducing the planned time of this activity from five to two years, which the Upgrade team agreed was worth examining. The Committee further recommends that all elements of the plan be subjected to future reviews to scrub technical content, costs and schedules. Since overall project cost remains a major issue and threat to the project, the AGS Upgrade and Experimental Project Teams are challenged to collaborate on finding imaginative solutions to cost reduction.

AGS RSVP Weekly Meeting P. Pile 16 December Nov 04 AGS Review Recommendations – Booster/AGS Technical Issues Perform a detailed survey of cable trays and cables, etc. to assess conditions that must be repaired for safety reasons. Refine cost estimates accordingly. Assess risks of repair activities causing safety problems with “at risk” but still serviceable cables. Design plan to minimize costs of repairs while maintaining safety. Consider the impact of limiting upgrades of those items specifically designed to make RSVP more convenient to operate, as opposed to unable to operate. Assess cost benefits in areas of controls, improvement of PFN kickers etc. Assess impact on RHIC if magnet/ coil replacement plan is limited in scope. Compare with present status of backup and likely downtime if a magnet fails during present operation. Many magnets do not have backups. Work out ALARA repair scenarios for present vs. more highly activated conditions. For the RF and Feedback systems, refine the conceptual designs with appropriate experienced RF engineering, generate resource-loaded schedules and revise cost estimates. Develop a contingency plan if the present plan fails to produce the required extinction performance.

AGS RSVP Weekly Meeting P. Pile 16 December Nov 04 AGS Review Recommendations – Switchyard and Experiment Beams Technical Issues Freeze production angle, beam aspect ratio as soon as possible so detailed design can begin. Continue design of Beam Development plan to optimize (minimize) cost impact. Continue developing requirements for experiment interfaces so detailed conceptual design and resource-loaded schedules can proceed.

AGS RSVP Weekly Meeting P. Pile 16 December Nov 04 AGS Review Recommendations – Costs Organize detailed Cost scrubbing reviews of all Booster, AGS and Switchyard major components as soon as feasible. Consider Table to suggest possible deferment or later staging of portions of proposed upgrade plan with possible later addition as needed during operations. Freeze detector locations, parameters, collimating devices as soon as possible to minimize engineering costs. Consider cost models constraining RSVP to (i) only RHIC operation; (ii) inside or outside RHIC operation to finish total experimental schedule as rapidly as possible. Consider if KOPIO can be designed to use some or all of existing nearby pit. Explore if BNL laboratory funds may legitimately be used to offset some of the AGS/ Booster reliability improvements. Consider shortening the beamline commissioning (Beam Development) program if necessary at cost of lower quality beams during initial 1-2 years.

AGS RSVP Weekly Meeting P. Pile 16 December Nov 04 AGS Review Recommendations – Schedule Investigate ways to achieve an accelerated, significantly shorter commissioning and experimental operating schedule. Consider both Life-Cycle and Opportunity Costs. Investigate reducing the execution time of the AGS Upgrade by: –an accelerated development program, and –reducing scope wherever possible to minimize time to completion of installation and commissioning. Consider supporting planned incremental upgrades on an as-needed basis during future operational downtimes to reduce costs.

AGS RSVP Weekly Meeting P. Pile 16 December Nov 04 AGS Review Recommendations – Management Complete drafts of the Project Execution and Project Management Plans including an accurate assessment of the key technical risks, realistic analyses of cost risks through detailed bottom-up modeling, realistic personnel planning across the board aided by resource-loaded schedules, and a critical evaluation of availability of personnel to match the needed ramp-up. b. Once the draft plans and supporting work are complete, the RSVP project managers should organize reviews to strongly focus on technical justification, cost and schedule scrubbing of overall system scope and key subsystem components, particularly those requiring R&D. c. RSVP management needs to challenge the entire RSVP Team to explore together imaginative ways to eliminate, reduce or defer construction costs. Some possibilities are: –Constrain proposed upgrades to items vital to meeting the RSVP minimum beam requirements and non-interference with RHIC. –Explore deferment of changes that are designed mainly to minimize MTTR for RHIC, such as stocking of magnet spares, replacement of controls systems, redesign of kicker magnet drivers, etc. to later “as needed” repairs or upgrades. –Explore a future operating fund set-aside for repairs on an as-needed basis. –Significantly reduce or eliminate Beam Development proposal designed to prepare beams for maximum levels on Day One of experimental engineering and data runs. –Explore global changes to plan to reduce life-cycle costs such as more rapid completion of MECO while initially delaying KOPIO; buying more running hours earlier to accelerate completion of MECO without beam sharing with KOPIO; buying more running hours later to accelerate KOPIO completion. –Consider capital costs, operating costs, Life-Cycle costs and (lost) Opportunity costs in all scenarios.

AGS RSVP Weekly Meeting P. Pile 16 December 2004 RSVP Cost and Schedule Review, 9 Dec 2004 Guidance, agenda and presentations can be found at: Attendees: Goldberg (NSF), Firestone, Willis, Kotcher, Kirk, Hebert, Marx, Pile, Littenberg, Bryman, Zeller, Molzon (telephone) An outcome of the meeting: Cost Roll-up of RSVP WBS 1.1 RSVP Project Office$ 20.5M WBS 1.2 K0PI0$106.9M WBS 1.3 MECO$~94.6M plus (several omissions not added in) WBS 1.4 AGS$ 69.2M (with 3 years beam development) TOTAL$292.1M plus… i.e. Costs are now an openly recognized problem for the NSF…..

AGS RSVP Weekly Meeting P. Pile 16 December 2004 RSVP Simulation and Background Review Committee –Ed Blucher, University of Chicago –Martin Cooper, Los Alamos –Cy Hoffman, Los Alamos –Patty McBride, Fermilab –Jack Ritchie (Chair), University of Texas, Austin –Mike Shupe, University of Arizona –Bob Tschirhart, Fermilab –Koji Yoshimura, Osaka University Charge and Agenda: Detailed agenda is in preparation RSVP Detector Capabilities, Simulations and Backgrounds Review (11-13 Jan 2005 at NYU) We are not directly involved – (Don, Wuzheng, Kevin, Kin (1 day) and I will attend as observers)

AGS RSVP Weekly Meeting P. Pile 16 December 2004 Resource Loaded Schedule Review (18-20 Jan 2005) Tom Kirk is responsible for the review and will be conducted a committee appointed by Tom, the Laboratory Oversight Group (LOG) Guidance from RSVP Project Office: “It will be a cost and schedule review, delving as deeply as possible into the justifications for each, documentation, etc.….charge and agenda should be out this week……a close look at the cost and schedule, their basis, and the backup documentation -- both in place, and in planning.” Subsystem Managers will be directly involved in this review!

AGS RSVP Weekly Meeting P. Pile 16 December 2004 Guidance – our plan (subject to change – we have not yet received guidance from Willis/Kotcher as result of the Oct MECO Magnet, 4-5 Nov AGS, and 9 Dec Cost and Schedule Reviews – changes since 18 Nov meeting is red) Continue cost scrubbing and schedule development Highest priority to AGS/BOOSTER WBS –Cost scrubbing, what can we postpone until operations phase? etc… –Schedule – in particular a plan to get the AGS/BOOSTER in shape for high intensity beam development --- by beginning of 3 rd year of construction? –Beam development plan that fits within constant effort RHIC budget scenario with 2 beams – i.e. figure on 80 hrs/week and 15 weeks/year Case 1: Beam development during entire 5 year construction period (looking less and less likely) Case 2: Beam development beginning 3 rd year of construction The construction plan should be developed consistent with no beam development in first two years of the project (Case 2 above) unless short run(s) outside RHIC operations is (are) critically needed –D-line decommissioned –C-Line available beginning of 3 rd year for tests –there’s a risk (small) that we may have to revert back to the original plan (Case 1). All costs scrubbed and resource loaded schedules available for review for all major projects with DRAFT first pass at full integration into a master schedule – deadline, 15 Jan 05, needed for Kirk’s Jan LOG Review.. All experiment/AGS interface issues are not expected to be resolved by this date Use AGS Project Office account number for this work!

AGS RSVP Weekly Meeting P. Pile 16 December 2004 MilestoneDateStatus, Comments Discussion of Baseline Expectations, Timeline with Experiments September 13Held MECO Magnet ReviewSun-Tue, Oct 10-12Held AGS ReviewThu-Fri, Nov 4-5Held Internal discussion of resource-loaded schedules (RLS) for all projects Thu, Dec 9Held Simulations & Backgrounds ReviewTue-Thu, Jan 11-13Set, reviewers assembled, held at NYU Initial review of RLS for all projectsTue-Thu, Jan 18-20Reviewed by LOG. Dates TBF. Reviews of other sub-projectsWeeks of Jan 24 – Feb 21Series of LOG-based reviews of RSVP sub-systems Draft versions of PMP, PEP, Conceptual Design Report completed Mon, Feb 14 Operations ReviewWeek of Mar 7 Project startup pre-reviewWeek of Mar 15Comprehensive preparatory review of full project, proposal Project startup reviewWeek of Apr 18Final project startup review, iteration of above. NSF review. Finalize documentation for May submission to NSF Week of Apr 25 Product submitted to NSF/NSBMon, May 2 next significant events Resource Loaded Schedule Review for all of RSVP at BNL K0PI0 and MECO Experiment Simulations Review

AGS RSVP Weekly Meeting P. Pile 16 December 2004 Message from Steve Kane (today) “We have implemented web-based reporting to provide status tracking and simplify input. The new Reporting Center also provides an archive for the monthly reports. You can get to the reporting center via the RSVP Project Office web page, or you can go directly to the RSVP Reporting Center at The RSVP Reporting Center should be used for the December RSVP Monthly Report. The pages are intended to be self-explanatory, but please if you have questions or problems.” So… Al, Kevin, Dave and Charlie – enter your monthly reports directly into the system by the end of each month (I’m out of the loop! – except for editorial changes and Project Office input)

AGS RSVP Weekly Meeting P. Pile 16 December 2004 Next Meeting 30 Dec 2004 Agenda –Status of cost scrubbing and resource loaded schedules (must be ~complete by 15 Jan, in time for the LOG review), in addition to what has been done, SHOW ROAD MAP TO COMPLETION! - (Brown,Pendzick,Phillips and Pearson) –Beam development plan, Case 1 and 2 update (Ahrens)