1 Compliance Rates as They Relate to Strategic Directive 4 and 8 Landfill Management and Enforcement Permitting.

Slides:



Advertisements
Similar presentations
Internalizing Stormwater Requirements Between TBR and Facilities Construction Projects and Permanent Stormwater Treatment Mgmt. Steve Casey, PE, CPESC.
Advertisements

Certification of Compliance By Evita Lagard
Finally! – A Process that Looks at Environmental Risk Early J. S. Irving Environmental Compliance Idaho National Laboratory.
EPA Proposed Mandatory Greenhouse Gas Reporting Rule.
S E R V I N G C A N A D I A N S A U S E R V I C E D E S C A N A D I E N S This may not necessarily represent the view of the Government CBA/Justice Annual.
Credentialing, Accreditation, Certification, Registration, and Licensure: What does it all mean? Donna Nowakowski, MS, RN Associate Executive Director.
Department of Resources Recycling and Recovery Waste Permitting, Compliance and Mitigation Division Discussion Of Local Enforcement Agency Evaluations.
PUBLIC INFORMATION SESSION: Old Fall River Road Landfill Dartmouth, MA Massachusetts Unlined Landfill Closure Policy March 28, 2013 Mark Dakers, Acting.
Software Engineering Institute Capability Maturity Model (CMM)
Kuali Coeus: Conflict of Interest Module Eric D. Swank, Executive Director, Research Compliance Stephanie R. Roberts, Research Compliance Advisor Carey.
Session No. 4 Implementing Service Providers SMS Implementing the State’s Safety Programme SMS Senior Management Workshop Rome, 21 May 2007.
January Goals: Streamline permitting process for certain solid waste facilities and activities Expand use of 3 rd party inspectors to allow MassDEP.
Current Status Of The ERO Transition Activities To Comply With The 2005 EPAC ERCOT Board Meeting February 21, 2006 Sam Jones, COO.
Averting Disaster - Grid Reliability Issues and Standards National Energy Restructuring Conference April 1, 2004 Washington, DC.
California Integrated Waste Management Board. 58 Percent Diversion Generated 94 Million Tons Disposed 39.6 Million Tons Diverted 53.5 Million Tons California.
After the Sanitary Survey
Ministry of the Environment Certificates of Approval for an Anaerobic Digestion Facility Post Construction DIGGING INTO BIOGAS DETAILS WORKSHOP April 5,
1 Arizona Corporation Commission BTA Workshop Presenter: Steven Cobb May 23, 2008.
Ert 312 LECTURE 4 OSHA & DOSH.
Where to find Information About Facilities. Overview of Title V Permits.
Screen | 1 EPA - Drivers for Regionalisation Max Harvey Director Operations Environment Protection Authority Presentation, reference, author, date.
Matthew Udenenwu Waste Permits Division 2015 TCEQ Environmental Trade Fair.
Secretary of State Voting System Security Standards Juanita Woods Secretary of State Elections Division HAVA Information Security.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines January 19, 2010 Daniel Hall, Solid Waste Section Chief.
Air Regulations for Municipal Solid Waste Landfills Dana Podell Air Pollution Control Division.
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
Workflow Description Roles and Responsibilities DEVA Data Management Workshop Devil’s Hole Pupfish Project Project Managemen t!?!
Problem Areas Updates Penalties FRCC Compliance Workshop September / October
Enforceable Codes of Conduct: Accredited Third-Party Certification for Food U.S. Federal Trade Commission November 29, 2012 Charlotte A. Christin U.S.
1 MTAC Work Group #149 Certification of Mail Service Providers for Full-Service December 10 th, 2012.
LEA Conference, October 18, CIWMB Proposed Compliance Strategy Lorraine Van Kekerix Division Chief Compliance Evaluation & Enforcement Division.
The Opportunity The IT Audit Senior is responsible for conducting independent audits of the company’s information technology infrastructure and business.
Ed Mussler, P.E., Permitting Branch Supervisor Solid Waste Section Division of Waste Management NC Department of Environment and Natural Resources Presentation.
The Opportunity Assuming the leadership role in the individual audit planning process is the first of several responsibilities that occupy the Senior Auditor’s.
Intervention – 2004 Nanisivik Reclamation and Closure Plan Arctic Bay June 3-4, 2004 Nunavut Water Board Public Hearing.
Iowa Strategic Goals Program For Metal Finishers.
ENVIRONMENTAL QUALITY AND PROTECTION Strategic Plan for Portfolio Committee April 2011.
Smooth Sailing Ahead Partnering With Sustainability and Waste Compliance & Mitigation Fernando Berton, CIWMB.
Discussion of Priority Activities for Next Eighteen Months Action Plans.
Tracking Assets Spot Audit Inventory Accounting The University of Texas at Austin.
Pinal County Air Quality Workshop Compliance Reporting And Inspections Casa Grande – January 14, 2014 Bob Farrell Environmental Engineer.
Green Belt Deliverables for Week Two Six Sigma Foundations Continuous Improvement Training Six Sigma Foundations Continuous Improvement Training.
Maryland’s Nutrient Trading Program How Trading Works John Rhoderick Maryland Department of Agriculture.
EN EUROPEAN COMMISSION Budgetary Control Committee of European Parliament Budgetary Control Committee of European Parliament Brian Gray DG BUDGET Workshop.
Landfill Study Board initiated a unique, 2-phase, cross-media study of the state’s MSW landfills and contracted with GeoSyntec Consultants. Phase 1 consists.
Gregory Canyon Landfill San Diego County LEA Gary Erbeck, Director California Integrated Waste Management Board Hearing December 14-15, 2004.
RCRA Issues That Affect Eligibility For VAP OAC Certified Professional Coffee July 14, 2015.
Preparation and review of the Project 1. Project ideas reviewed by PCF 2. PCN prepared by project sponsor 3. Host country endorsement sought 4. Further.
LEA EVALUATIONS Evaluation staff assess LEA performance to ensure LEA: 1)Provides consistent enforcement of statute and regulations. 2)Implements its.
Wisconsin’s New Approach to Land Use Controls Presented by Mark F. Giesfeldt Wisconsin Department of Natural Resources.
Virginia Energy Conservation and Environmental Standards May 19, 2009 Capital Outlay & Facilities Manager Forum.
Landfill Study Board initiated a unique, 2-phase, cross-media study of the state’s MSW landfills and contracted with GeoSyntec Consultants. Phase 1 consists.
1 DISCUSSION ON THE MINERAL RESOURCES 2011 / 12 MTEF STRATEGIC PLAN DATE 24 MAY 2011 Programme 2 - Mine Health and Safety DEPARTMENT OF MINERAL RESOURCES.
Audit of <insert title and audit #>
Global Connections Day Building Safety Service Provider
Department of Buildings
GeoMesh Blockchain Networking - Slide Presentation
استراتژی های مدیریت تغییر
Georgia Update Jeff Cown Land Protection Branch
برنامه‌ريزي منابع انساني
What to Do With Contaminated Fill
WHAT YOU NEED TO KNOW ABOUT FINANCIAL ASSURANCE
Proposal Phase Draft & Review Phase Approval Phase
Flow Process of Work Plan for approval
Submitting to a subscription-based journal
Vision for Land Protection branch
Common Errors - FCRB Payment Requests
Branch Organization Chuck Mueller, Branch Chief
2018/2019 Activities. 2018/2019 Activities Revised Regulations - HSRA Reflect changes in scientific understanding since 1994 Provide Consistency in.
Santa Teresa Landfill and Remediation Project
Presentation transcript:

1 Compliance Rates as They Relate to Strategic Directive 4 and 8 Landfill Management and Enforcement Permitting

2 Landfill Compliance SD & % decrease in enforcement orders 33% decrease in facilities listed on Inventory 139 active permitted landfills (146-SD Baseline)

3 Final Plans - SD final plans submitted and under review As of May ‘ final plans approved 5 closure certifications accepted

4 Landfills Certified Closed - SD certification reports received; 3 approved As of May ‘ landfills certified closed & in post- closure maintenance

5 Non-Landfill Facility Compliance – % decrease in facilities on Inventory 60% decrease in facilities w/ enforcement orders 830 permitted SW and tire facilities

6 Breakdown of Enforcement Orders 26 Active Enforcement Orders

7 Enhanced Audits/Field Investigations– 8.8 2% Facility auditing goal will be met