Project cash flow n A B -4500 -2900 1 2610 1210 2 2930 1720 3 2300 Example 1: Consider the following two mutually exclusive investment projects. Assume.

Slides:



Advertisements
Similar presentations
Incremental Analysis Lecture No. 21 Professor C. S. Park
Advertisements

Chapter 7 Rate of Return Analysis
Example 1: In the following cash flow diagram, A8=A9=A10=A11=5000, and
Contemporary Engineering Economics, 4 th edition, © 2007 Incremental Analysis Lecture No. 28 Chapter 7 Contemporary Engineering Economics Copyright © 2006.
PRESENT WORTH ANALYSIS
EGR Evaluation Alternatives Present Worth Analysis Companies constantly evaluate whether or not to pursue projects. Mutually Exclusive Projects.
Engineering Economics Outline Overview
1 Dr. Lotfi K.GAAFAR Eng. Ahmed Salah RIFKY ENGR 345 Engineering Economy.
1 Project Cash Flow Analysis Lecture No. 27 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Comparison Methods Part 2. Copyright © 2006 Pearson Education Canada Inc Introduction Chapter 4 introduced the Present Worth and Annual Worth.
Chapter 7 - Rate of Return Analysis Click here for Streaming Audio To Accompany Presentation (optional) Click here for Streaming Audio To Accompany Presentation.
Chapter 5 Present Worth Analysis
Contemporary Engineering Economics, 4 th edition, © 2007 Variations of Present Worth Analysis Lecture No.17 Chapter 5 Contemporary Engineering Economics.
Incremental Analysis Ismu Kusumanto.
(c) 2001 Contemporary Engineering Economics 1 Chapter 9 Rate of Return Analysis Rate of Return Methods for Finding ROR Internal Rate of Return (IRR) Criterion.
Dealing With Uncertainty
Chapter 11 Replacement Decisions
(c) 2001 Contemporary Engineering Economics 1 Chapter 8 Annual Equivalent Worth Analysis Annual equivalent criterion Applying annual worth analysis Mutually.
Sensitivity and Breakeven Analysis
Chapter 15 Replacement Decisions
Machine Replacement or Retention Pertemuan 21 s.d 22 Matakuliah: D 0094 Ekonomi Teknik Tahun: 2007.
(c) 2001 Contemporary Engineering Economics 1 Chapter 7 Present Worth Analysis Describing Project Cash Flows Initial Project Screening Method Present Worth.
Chapter 8 Annual Equivalent Worth Analysis
Chapter 10 Sensitivity and Breakeven Analysis. Handling Project Uncertainty Origin of Project Risk Methods of Describing Project Risk.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 RATE OF RETURN ANALYSIS Course Outline 7.
Accounting Principles, Ninth Edition
Capital Expenditure Decisions
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Annual Equivalent Worth Criterion.
Comparing Projects Using Time Value of Money
Copyright ©2012 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fifteenth Edition By William.
The second objective today is to evaluate correctly capital investment alternatives when the time value of money is a key influence.
Lecture No. 26 Chapter 7 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
ENGINEERING ECONOMICS ISE460 SESSION 13 Annual Equivalent, June 17, 2015 Geza P. Bottlik Page 1 OUTLINE Questions? News? Annual Equivalent Examples.
Evaluating a Single Project
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Variations in Present Worth Analysis.
ENGR 112 Economic Analysis II. Engineering Economic Analysis Time Value of Money $1 today is more valuable than $1 a year later Engineering economy adjusts.
Lecture No.20 Chapter 6 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
L29: Sensitivity and Breakeven Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer.
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
1 Word Problems Organize the Data Given: Determine the objective and your strategy. Draw the Cash Flow Diagram. Write Equations and Solve. Reflect Back.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Applying Annual Worth Analysis Lecture.
Contemporary Engineering Economics, 4 th edition, © 2007 Applying Annual Worth Analysis Lecture No.20 Chapter 6 Contemporary Engineering Economics Copyright.
Contemporary Engineering Economics, 4 th edition, © 2007 When Projects Require Only Operating and Investing Activities Lecture No. 39 Chapter 10 Contemporary.
L:21 Incremental Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Making Capital Investment Decisions Lecture 10 (Ch 10)
Capital Budgeting Decisions Chapter 14. © The McGraw-Hill Companies, Inc., 2003 McGraw-Hill/Irwin Capital Budgeting How managers plan significant outlays.
Chapter 9 Project cash flow analysis 1.Understanding project cost elements 2.Why use cash flow in economic analysis 3.Income-tax rate to use in economic.
Chapter 5 Present-Worth Analysis. 2 Loan versus Project Cash Flows Initial Project Screening Methods Present-Worth Analysis Methods to Compare Mutually.
Chapter 6 Annual Equivalent Worth Criterion. Chapter 6 Annual Equivalence Analysis  Annual equivalent criterion  Applying annual worth analysis  Mutually.
Chapter 6: Comparison and Selection Among Alternatives
Variations in Present Worth Analysis
Applying Annual Worth Analysis
Annual Equivalent Worth Criterion
Evaluation Alternatives Present Worth Analysis
Project Cash Flow Analysis
Chapter 6: Comparison and Selection Among Alternatives
Chapter 6: Comparison and Selection Among Alternatives
Evaluation Alternatives Present Worth Analysis
Chapter 9 Rate of Return Analysis
Chapter 6: Comparison and Selection Among Alternatives
Chapter 7 Present Worth Analysis
Evaluation Alternatives Present Worth Analysis
Project Cash Flow Analysis
RATE OF RETURN ANALYSIS CHAPTER 7
PRESENT WORTH ANALYSIS Chapter 5
Chapter 6: Comparison and Selection Among Alternatives
Chapter 6: Comparison and Selection Among Alternatives
Applying Annual Worth Analysis
OUTLINE Questions? News? New homework due Wednesday
Presentation transcript:

Project cash flow n A B -4500 -2900 1 2610 1210 2 2930 1720 3 2300 Example 1: Consider the following two mutually exclusive investment projects. Assume that MARR=12%. Which alternative would be selected by using the PW criterion? Which alternative would be selected by using the net-future-worth criterion? Project cash flow n A B -4500 -2900 1 2610 1210 2 2930 1720 3 2300 1500

Example 2: Consider the following two investment alternatives. The firm’s MARR is 15%. (a) Compute the PW for project A. (b) Compute the unknown cash flow X in years two and three for project B. (c) Compute the project balance for project A at the end of year three. (d) If these two projects are mutually exclusive alternatives, which project would you select? Project cash flow n A B -15000 -25000 1 9500 2 12500 X 3 7500 PW(15%) ? 9300

Example 3: You need to know if the building of a new warehouse is justified under the following conditions: The proposal is for a warehouse costing $100000. The warehouse has an expected useful life of 35 years and a net salvage value of $25000. Annual receipts of $17000 are expected, annual maintenance and administrative costs will be $4000, and annual income taxes are $2000. Given this data, which of the following are correct? (a) The proposal is justified for a MARR of 9%. (b) The proposal has a net present worth of $62730.5, when 6% is used as the interest rate. (c) The proposal is acceptable as long as MARR≤10.77%.

Spray Guns With Overhead Monorail PW = [-22.2(1+(P/F,18%,6)) + 6(P/A,18%,12) + 8((P/F,18%,6)+ (P/F,18%,12))]*1000 = $2,395.92 Spray Guns With Overhead Monorail PW = [-250.9(1+(P/F,18%,6)) + 91(P/A,18%,12) + 44((P/F,18%,6) + (P/F,18%,12))]*1000 = $114,664.04 Paint robot PW = [-510.13 (1+ (P/F,18%,4) + (P/F,18%,8) ) + 154(P/A,18%,12) + 73 ( (P/F,18%,4) + (P/F,18%,8) + (P/F,18%,12) )] * 1000 = -$103,740.634 Answer: Choose Spray Guns With Overhead Monorail

Example 5: Before your company writes the purchase order for the paint system selected in Example 4 it is announced that the production of metal door frames will be discontinued in 4 years. Assuming that the salvage value is constant at any time after the system is installed, which will you now choose? Your MARR is still 18% and you still use present worth analysis. Show your cash flow diagrams. SPRAY GUNS WITH OVERHEAD MONORAIL PAINT ROBOT Initial Cost $22,200 $250,900 $510,130 Annual Savings 6,000 91,000 154,000 Salvage Value 8,000 44,000 73,000 Life 6 yrs. 4 yrs.

Spray Guns PW = [-22.2 + 6(P/A,18%,4) + 8(P/F,18%,4)] * 1000 = -$1933.60 Spray Guns With Overhead Monorail PW = [-250.9 + 91(P/A,18%,4) + 44(P/F,18%,4)] * 1000 = $16,585.20 Paint robot PW = [-510.13 + 154(P/A,18%,4) + 73(P/F,18%,4)] * 1000 = -$58,216.60

Option OK FINE Example 6: For the project described below you have been told that the function will be needed for only 4 years. At an MARR of 15% which will you choose? Salvage value is the same at any time after installation. Show the cash flow diagrams. Option OK FINE Initial cost 40000 55000 Salvage value 4000 6000 Annual benefit 20000 21000 Useful Life 3 4

Example 7: Consider the following cash flows for two types of models. Both models will have no salvage value upon their disposal (at the end of their respective service lives). The firm’s MARR is known to be 15%. (a) Notice that models have different service lives. However, model A will be available in the future with the same cash flows. Model B is available now only. If you select model B now, you will have to replace it with model A at the end of year 2. If your firm uses the present worth as a decision criterion, which model should be selected assuming that your firm will need either model for an indefinite period? (b) Suppose that your firm will need either model for only two years. Determine the salvage value of model A at the end of year two that makes both models indifferent (equally likely). Project cash flow n A B -6000 -15000 1 3500 10000 2 3

Example 8: Susan wants to buy a car that she will keep for the next four years. She can buy a Honda Civic at 15000 and then sell it for 8000 after four years. If she bought this car, what would be her annual ownership cost (capital recovery cost)? Assume that her interest rate is 6%.

Example 9: The following cash flows represent the potential annual savings associated with two different types of production processes, each of which requires an investment of 12000. Assuming an interest rate of 15%, complete the following tasks: (a) Determine the equivalent annual savings for each process. (b) Determine the hourly savings for each process assuming 2000 hours of operation per year. (c) Determine which process should be selected. n A B -12000 1 9120 6350 2 6840 3 4560 4 2280

Example 10: Norton Auto Parts, Inc. is considering two different forklift trucks for use in its assembly plant. Truck A costs 15000 and requires 3000 annually in operating expenses. It will have a 5000 salvage value at the end of its 3-year service life. Truck B costs 20000 and requires 2000 annually in operating expenses. It will have a 8000 salvage value at the end of its 4-year service life. The firm’s MARR is 12%. Assuming that the trucks are needed for 12 years and no significant changes are expected in the future price and functional capacity of both trucks, select the most economical truck based on AE analysis.

Capital Recovery Cost

Example 11: Your company needs a small front loader for handling bulk materials at the plant. It can be leased from the dealer for three years for $4050 per year including all maintenance. It can also be purchased for $14,000. You expect the loader to last for six years and to have a salvage value of $3000. You predict that maintenance will cost $400 the first year and increase by $200 per year in each year after the first. Your MARR is 15%. Use annual equivalence analysis to determine whether to lease or buy the loader. What is the shortest project life for which the annual worths you have calculated are exactly correct?

Present worth