1/26/2016rdcw2a-1 Engineering Economic Analysis Chapter 2  Engineering Costs and Cost Estimating.

Slides:



Advertisements
Similar presentations
Copyright Oxford University Press 2011 Chapter 2 Engineering Costs and Cost Estimating.
Advertisements

Agenda Cost Management Capital Budgeting Payback Period
Chapter 7: Project Cost Management
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
Chapter 9 Cost Concepts in Economics
CHAPTER 7 Cost Estimation.
Engineering Economic Analysis - Ninth Edition Newna/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.1 Engineering Economic Analysis 9th.
Project Cost Evaluation February 7, 2002 Richard Chung Department of Chemical and Materials Engineering San Jose State University.
(c) 2002 Contemporary Engineering Economics 1 Chapter 3 Cost Concepts and Behaviors General Cost Terms Classifying Costs for Financial Statements Cost.
Information Technology Project Management, Sixth Edition Note: See the text itself for full citations.
Cost Analysis and Estimation
HIT241 - COST MANAGEMENT Introduction
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Project Cost Management
Chapter 2 Engineering Costs and Cost Estimating
Advanced Project Management Project Cost Management Ghazala Amin.
1 Engineering Economics Engineering Costs and Cost Estimating William Loendorf, P.E.
Cost Management Week 6-7 Learning Objectives
Chapter 6 Cost of Production.
Binghamton University Thomas J. Watson School of Engineering and Applied Science State University of New York.
© Mcgraw-Hill Companies, 2008 Farm Management Chapter 9 Cost Concepts in Economics.
CTC 475 Review  Course Requirements  Applications  Multiple Decision Criteria  Selling The Project  PSP.
1 EGGC4214 Systems Engineering & Economy Lecture 2 Cost Concepts and Economic Environment.
Chapter 4: Schedule, cost, and situation analysis (pt. 2) ISE 443 / ETM 543 Fall 2013.
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any.
Obtaining and Estimating
Cost Estimation and Budgeting. Cost management Data collection & cost estimation Cost accounting Cost controll Copyright © 2010 Pearson Education, Inc.
1 ECGD3110 Systems Engineering & Economy Lecture 3 Cost Estimation.
Engineering Economic Analysis Canadian Edition
Chapter 15 Cost Control.
System Engineering & Economy Analysis
Engineering Costs and Cost Estimating Chapter 2: Newnan, Eschenbach, and Lavelle Dr. Hurley’s AGB 555 Course.
1 ECGD4214 Systems Engineering & Economy. 2 Lecture 1 Part 1 Introduction to Engineering Economics.
Engineering Costs and Cost Estimating. Manufacturing Cost Structure Direct Materials Direct Labor Direct Labor: Cost of all “hands-on” effort required.
EARNED VALUE MANAGEMENT (EVM)
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Classification of Costs Lecture No.
COSTS OF THE CONSTRUCTION FIRM
Contemporary Engineering Economics Contemporary Engineering Economics, 5 th edition, © 2010.
Ch 91 IT-390Cost Analysis. 2 Project Estimating (Design) l A Project Estimate is one of a kind n Custom design, only one will be manufactured n Capital.
Project Cost Management
Contemporary Engineering Economics, 4 th edition, © 2007 Applying Annual Worth Analysis Lecture No.20 Chapter 6 Contemporary Engineering Economics Copyright.
Engineering Economic Analysis Canadian Edition
1/30/20161rd Activity-Based Costing Key Concepts.
A.P. Microeconomics Daily: Draw & label no the same axis set, TFC, AFC & TVC.
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
EGR Break-Even Analysis Break-even Analysis – performed to determine the value of a variable that makes two elements equal. In economic terms:
ALI SALMAN1 LECTURE - 05 ASST PROF. ENGR ALI SALMAN ceme.nust.edu.pk DEPARTMENT OF ENGINEERING MANAGEMENT COLLEGE OF E & ME, NUST DEPARTMENT.
Costs and Cash Flows Estimation. Engineering Economic Analysis - Seven Steps 1. Recognition and formulation of the problem. 2. Development of the feasible.
Information Technology Project Management, Six th Edition Kathy Schwalbe Copyright Disampaikan Oleh : Wiwid Dolianto S.Kom, MT Universitas Muhammadiyah.
1 Chapter 7: Project Cost Management. 2 Learning Objectives Understand the importance of good project cost management Explain basic project cost management.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Faculty of Applied Engineering and Urban Planning Civil Engineering Department Engineering Economy Lecture 1 Week 1 2 nd Semester 20015/2016 Chapter 2.
Department of Applied Economics and Management Cornell University Ithaca, NY Dr. Wen-fei Uva Senior Extension Associate What is Your Profitability?
Developing the schedule – Tracking Gantt charts Critical path method – Longest path, earliest time Schedule trade-offs using CPM – Free slack, total slack.
Chapter 3: Cost Estimation Techniques
Classification of Costs
Chapter 3: Cost Estimation Techniques
Process Economics Factors that affect profitability
Engineering Economics Engineering Costs and Cost Estimating
Cost Concepts and Design Economics
Economic Analysis for Managers (ECO 501) Fall:2012 Semester
Chapter 3: Cost Estimation Techniques
Earned Value Measures Planned Value (PV) Earned Value (EV)
Chapter 3: Cost Estimation Techniques
فرآيند كنترل پروژه.
Chapter 2 FUNDAMENTAL COST CONCEPTS
CTC 475 Review Course Requirements Applications
Chapter 3: Cost Estimation Techniques
Presentation transcript:

1/26/2016rdcw2a-1 Engineering Economic Analysis Chapter 2  Engineering Costs and Cost Estimating

1/26/2016rdcw2a-2 Cost Explicit vs. Implicit Cash vs. Book Fixed vs. Variable Marginal vs. Average Sunk, Opportunity Recurring, Nonrecurring Incremental, Cash (out of pocket) vs. Book Life Cycle

1/26/2016rdcw2a-3 Costs Life cycle First Operating & Maintenance Disposal Sunk Future Opportunity Direct Indirect Overhead Fixed Variable 1/26/2016rd3

1/26/2016rdcw2a-4 Cost Estimation What cost component must be estimated? What approach to cost estimation will be applied? How accurate should the estimates be? What estimation techniques will be utilized?

1/26/2016rdcw2a-5 Cost Estimating What cost components must be estimated? First component ~ equipment, delivery, installation insurance, training Elements – Direct labor and materials, maintenance What approach to cost estimation will be applied? Bottom-up, design-to-cost or top-down How accurate should estimates be? ROMs ~  20% of actual costs, Detail  5% What estimation techniques will be used? Unit, cost indices, learning curves, capacity, analogy 1/26/2016rd5

1/26/2016rdcw2a-6 Cost Estimation Cost component estimates Cost Estimates 1/26/2016rd6 Required price Bottom-Up Top-Down DTC Required price

1/26/2016rdcw2a-7 First Cost Component Equipment Cost Delivery charges Installation costs Insurance coverage Initial training of personnel for equipment use

1/26/2016rdcw2a-8 Unit Method C T = U x N Cost of operating a car (43 cents / mile) Cost to bury fiber cable ($30K / mile) Cost to construct a parking space in parking garage $4500 Cost to construct Interstate highway ($6.2 M /mile) Cost of house construction ($225 /ft 2 ) 1/26/2016rd8

1/26/2016rdcw2a-9 Annual Operating Costs Direct labor cost for operating personnel Direct materials Maintenance (daily, periodic, repairs, etc.) Rework and rebuild Can use canned cost estimating packages for bridges, pavement, etc.

1/26/2016rdcw2a-10 Cost Estimates Rough Order of Estimates (ROMs) Semi-detailed Detailed (WBS) Segmented (divide and conquer) Analogy Parametric (e.g., by foot or mile) Cost Index Triangulation (Delphi) Learning Curve

1/26/2016rdcw2a-11 Cost Index An engineer finds a project of similar complexity was done 5 years ago at a skilled labor cost of $360K. The skilled labor index was 3496 and is now Estimate cost today for the skilled labor. C t = C 0 (I t /I 0 ) = 360K * = $415,812.

1/26/2016rdcw2a-12 Cost Capacity Equation C 2 = C 1 (Q 2 /Q 1 ) x Cost for flow rate of 0.5 MGD is $1.7M in year Estimate today's cost for 2 MGD flow rate. Cost index for 2000 is 131 and today is 225 and C 2 = 1.7M * 2/ * =$3,545,264

1/26/2016rdcw2a-13 Cost Capacity C 2 = C 1 (Q 2 / Q 1 ) x (I t /I 0 ) The total cost for a digester with a flow rate of ½ MGD was $1.7M in Estimate the cost for a flow rate of 2 MGD. The cost index in 2000 of 131 is now 225 and the exponent x = 0.14 for the range flow 0.2 to 40 MGD. C 2 = 1,700,000 * (2/0.5) 0.14 (225/131) = $3,546,178. ComponentSize RangeExponent Activated sludge plant1-100 MGD 0.84 Aerobic digester MGD 0.14 …. … … 1/26/2016rd13

1/26/2016rdcw2a-14 DK Enterprise Fixed Variable Bus $80 Event ticket $12.50 Gas 75 Treats 7.50 Oil etc 20 $20.00 Driver 50 $225 Ticket price $35, Let X be number of people Profit = (35 – 20)X – 225 = 0 => Breakeven X = 15

1/26/2016rdcw2a-15 Production Costs (1) Q (2) TFC (3) TVC (4) TC (5) AFC (6) AVC (7) AC (8) MC

1/26/2016rdcw2a-16 Incremental Costs Cost Item Model A Model B Difference First cost $10K $17.5K-$7.5K Installation 3.5K 5K -1.5K AnnMaintCost 2.5K 0.75K 1750 Annual utility 1.2K 2K -800 Salvage value

1/26/2016rdcw2a-17 Problem 2-5 C = 3M – 18K Q + 75Q 2 cost/production dC/dQ = -18K Q = 0 when Q = 120 units dC 2 /dQ 2 = 150 > 0 => relative and absolute minimum as C(0) = $3M and C(  ) = . C(120) = 3M – 18K * * = $1.92M for 120 units => 1.92M/120 = $16K average unit cost C(110) = 3M – 18K * * = $1,927,500 for 110 units => $17,522.73/unit Save M – 1.92M = $75K

1/26/2016rdcw2a-18 Problem 2-10 C A = $100K x C B = $350K x 0 < x < 150K production C C = $600K + 8x Breakeven BE AB => 250K = 10x => x = 25K BE BC => 250K = 2.5x => x = 10K BE AC => 500K = 12.5x => x = 40K x A K A B K B C K C x CACA CBCB C

1/26/2016rdcw2a-19 Problem 2-14 P = 100 – S; C = S where P is unit selling price and S is Sales volume. C is the total cost of production. Profit = (100 - S)S – 1000 – 10S = -S S Profit' = -2S + 90 = 0 when S = 45 Profit"(45) = 0 Use first derivative test showing 45 is max. Breakeven equation set Profit = 0 or S 2 – 90S = 0 (quadratic )  ( ) or S = 77, 13

1/26/2016rdcw2a-20 Learning Curve (80%) n Time (hrs) = 0.8 * 20 (doubled) = 0.8 * 16 (doubled) 6 ? T n = T 1 * n b ; T 1 = 20, b is slope of curve 12.8 = 20 * 4 b => b = (log 0.8 2) =  2 x = 0.8

1/26/2016rdcw2a-21 Learning Curve 80% (Sim-LC /5)  Unit Cost Cumulative The slope of 80% learning curve is

1/26/2016rdcw2a-22 Example 2-10 (sim-lc )  Unit Hours Cumulative

1/26/2016rdcw2a-23 Learning Curve The time to make the first unit is $1000 and the learning curve is 90%. What is the cost to make the 2 nd, 4 th and 8 th units? T n = T 1 * n b T 2 = 1000 * 2(log ) = 1000 * = $900 T 4 = 0.90 * T 2 = 0.90 * $900 = $810 T 8 = 0.90 * T 4 = 0.90 * $810 = $ b = 0.90 => b Ln 2 = Ln 0.90 => b = (Tn% )  729

1/26/2016rdcw2a-24 Learning Curve labor hours produced unit 1; 60 hours produced unit 7. Find learning curve rate in percent. T n = T 1 * n b 60 = 200 * 7 b => b = Ln 0.3/ Ln 7 = LC% = 2 b = = 65%. (log )  = b

1/26/2016rdcw2a-25 Life Cycle Costs Concurrent Engineering Later the design changes, the more expensive the costs Early decisions lock in later costs. More accurate estimates Benefits usually overestimated Costs usually underestimated

1/26/2016rdcw2a-26 Benefits vs. Costs Estimating Benefits – tend to be overestimated and accumulate later in project. Costs – tend to be underestimated and mostly occur during beginning of project.

Earned Value Analysis (EVA) Budgeted cost of work scheduled (BCWS) Budgeted cost of work performed (BCWP) Actual cost of work performed (ACWP) Cost Variance (CV) = BCWP – ACWP Schedule variance (SV) = BCWP – BCWS Estimated cost at completion (ECAC) = ACWP * BAC/BCWP Estimated time at completion (ETAC) = BCWS * TAC/BCWP 1/26/2016rdcw2a-27

Example of EVA You are PM at the 18 th month of a 24 month project with $400K budget. You find that BCWS = $300K, ACWP = $310K and BCWP = $280K. Find the current estimates of CV and SV and ECAC and ETAC. CV = BCWP – ACWP = $280K - $310K = -$30K SV = BCWP – BCWS = $280K - $300K = -$20K ECAC = ACWP * BAC / BCWP = 320K * 400K/280K = $442,857 ETAC = BCWS * TAC / BCWP = 300K * 24 /280K = 25.7 months From $400K to $442,857 and from 24 months to 25.7 months. Overruns in cost and schedule. 1/26/2016rdcw2a-28

1/26/2016rdcw2a-29 BCWS ACWP BCWP Cost variance Schedule Variance BAC Cost Current review time TAC Time