CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

24 June 2010 Immanuel Gfall (HEPHY Vienna) CO 2 Cooling for PXD/SVD IDM Meeting.
Michael Hoch / EP-AIT1 TPC Resistor Rod. Michael Hoch / EP-AIT2 Resistor Chain: Design Constrains  current per resistor chain: 241  A = 25W (total =
CMS Pixel Technical Board Meeting – Dec. 16, Forward Pixel Cooling System Information Joe Howell.
GTK WG Meeting May 24 th 2011 Status of Microchannel Cooling - Paolo Petagna 1/9 PH-DT Status of Microchannel Cooling J. Daguin (CERN PH/DT) A. Mapelli.
CO 2 return pressure drop budget and pipes from PP2 to tracker Georg Viehhauser.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
1 CO 2 cooling of an endplate with Timepix readout Bart Verlaat, Nikhef LCTPC collaboration meeting DESY, 22 September
ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.
LHCb CO 2 cooling meeting Burkhard Schmidt – February 18,
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
IPN Lyon ILD Mechanical structure April 2012 DHCAL Assembly, Tooling, Cooling J.C Ianigro - IPN Lyon -
CMS Pixels upgrade CO 2 cooling transfer lines Introduction to the two projects P.Tropea 5 Dec 2012.
INTEGRATION OF THE CBM SILICON TRACKING SYSTEM U. Frankenfeld for the CBM collaboration supported by BMBF, EU-FP7 HadronPhysics3 and CRISP.
19 May 09P. Tropea1 Fluorocarbon systems –SS1 hydraulics completed, now under commissioning –SS2 connections and sensors installation done –Pixels ready.
Magnet & services projects P. Tropea 9 Nov 2011 – CMS upgrade workshop.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
 Roof integration  USA15 cavern integration Sylwia Wojnarska CERN - European Organization for Nuclear Research Warsaw University.
CMS Muon detectors for the GIF++ DRAFT Needs discussion within CMS Muon community A. Sharma.
14 May 2009Hans Postema - CERN CMS Upgrade Workshop Tracker Phase I upgrades 14 May
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
Meeting with TUM 1/5/2016P. Petagna – LHC Detector Upgrades: Cooling Visit of the President of the Munich Technical University LHC DETECTOR UPGRADES: COOLING.
Upgrade projects and APT update DT-LHCb coordination meeting 28 September 2015.
Cooling System Solutions
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
TS-CV-Detector Cooling 22-Jan-04P. Tropea - JCOV1 Design, construction and installation of a double loop fluorocarbon 150 kW cooling plant for the CMS.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
LHCb Install Meeting - 12 / 05 / 2004 Paolo Guglielmini - TS / CV LHCb Cooling of the sub – detectors INNER TRACKER TRACKER TRIGGER RICH 1 RICH 2 Status.
CO2 Cooling For the CMS Pixel detector 11 November 20081Hans Postema & Antti Onnela.
Overview of recent CO 2 cooling developments As an example for LHCb-Velo and UT cooling? Kick-off meeting 28 may 14 Bart Verlaat 1.
Documentation on present system and piping layout P. Tropea Tracker Upgrade Engineering and Cooling 12 November 2008.
Aachen Status Report: CO 2 Cooling for the CMS Tracker at SLHC Lutz Feld, Waclaw Karpinski, Jennifer Merz and Michael Wlochal RWTH Aachen University, 1.
ILC Cryogenic System Shallow versus Deep Tunnel Tom Peterson Dubna Meeting 5 June 2008.
Magnet R&D for Large Volume Magnetization A.V. Zlobin Fermilab Fifth IDS-NF Plenary Meeting 8-10 April 2010 at Fermilab.
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
CMS TK II cooling Brainstorming P. Tropea (update after meeting on June 13 th with Duccio, Antti, Hans, Jerome, Paolo, Bart) 20 June 2016.
1. Road to the EDR 2 Requirements Safety system Transfer line concept Plant concept design Requirements Evaporator concept and performance Transfer line.
LHCb CO 2 cooling meeting Burkhard Schmidt – May 20,
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
Pixel Cooling Upgrade (2013) 1 December 20081Hans Postema - CERN.
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
1M. Battistin M. Battistin CERN EN/CV/DC 9 th July 2009 CO2 kick-off NIKHEF - Cooling activities organization at CERN 9 th July 2009.
For the CMS Pixel detector
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
Safety approval of the installed copper cooling pipes
Update of MVD services and requests
Status of the CO2 Cooling Project
For the CMS Pixel detector
cooling for BGV modules
Forum on Tracking Detector Mechanics - Bonn, May 2016
Tracker cooling loop “check out” draft for discussion
M. Battistin CERN EN/CV/DC 9th July 2009
Pixel upgrade CO2 cooling plants – 3D modelling
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
Aachen Status Report: CO2 Cooling for the CMS Tracker at SLHC
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
Pixel CO2 Cooling Status
VELO Thermal Control System
Status of CO2 Cooling tests at CERN for Pixel phase 1
CO2 Cooling IPNL Nick Lumb, 28/01/09.
Second Meeting of the Material Budget & Engineering Working Group
For the CMS Pixel detector
Presentation transcript:

CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012

CO2 cooling plants being designed & built for CMS Pixels upgrade First plant & manifold prototype to be installed in TIF (bldg 186) in Jan 2013 Final systems at P5 to be installed end of LS1: 2 plants (USC) & 2 manifolds (UXC) Transfer lines (plant to manifolds) must be ready before magnet on (May 2014) Who does what Construction & commissioning of plant and manifolds PH-DT + CMX Construction of transfer lines: subject of the meeting Boundary conditions Operating pressure = 100 bar Design pressure = 110 bar (test pressure =157 bar) Operating T = -35/+30 (insulation!) Evaporative system: profits of concentric lines! liquid (inlet line) pipe inside vapor (return line) pipe CO2 cooling plants being designed & built for CMS Pixels upgrade First plant & manifold prototype to be installed in TIF (bldg 186) in Jan 2013 Final systems at P5 to be installed end of LS1: 2 plants (USC) & 2 manifolds (UXC) Transfer lines (plant to manifolds) must be ready before magnet on (May 2014) Who does what Construction & commissioning of plant and manifolds PH-DT + CMX Construction of transfer lines: subject of the meeting Boundary conditions Operating pressure = 100 bar Design pressure = 110 bar (test pressure =157 bar) Operating T = -35/+30 (insulation!) Evaporative system: profits of concentric lines! liquid (inlet line) pipe inside vapor (return line) pipe Overview of the project Liquid Vapor Insulation 5 December 2012Paola Tropea & Hans Postema2

Integration of the cooling plants in USC Electronics Rack balcony CV Room (one level lower) Tunnel UXC 5 CO Electronics Rack balcony 4 5 December 2012Paola Tropea & Hans Postema3

CO2 cooling system in USC: foot print Cooling Plant Accumulator 600x Cooling Plant access from both sides 1000 Accumulator 600x900 Electronics Racks (x2) Two concentric transfer lines (insulated, vacuum?), one per cooling plant from USC to UXC 5 December 2012Paola Tropea & Hans Postema4

3 12 USC55UXC55 Transfer lines from USC to UXC Preliminary sketch – integration studies on-going -Z End +Z End TX54 Manifolds CO2 plants 5 December 2012Paola Tropea & Hans Postema5

Plumbing Manifolds in UXC Freon Chiller (CV room) Tunnel to UXC Pneumatic Air & (Under Floor) 5 December 2012Paola Tropea & Hans Postema6

CO2 Plumbing: Plant to Manifolds Plug! (Insulation) Rail system 2 insulated, concentric tubes through the ~20m tunnel To UXC Jerome 5 December 2012Paola Tropea & Hans Postema7

Entry in UXC To Manifolds Experiment Cavern Transfer lines exit area in UXC from USC 5 December 2012Paola Tropea & Hans Postema8

Transfer lines in UXC: from the UXC entrance to the manifolds Option 1) over CMS: abandoned Option 2) along the wall: ok 5 December 2012Paola Tropea & Hans Postema9

In the USC (1) 5 December 2012Paola Tropea & Hans Postema10

In the USC (2) 5 December 2012Paola Tropea & Hans Postema11

In the USC (3) 5 December 2012Paola Tropea & Hans Postema12

In the UXC (1) 5 December 2012Paola Tropea & Hans Postema13

In the UXC (2) 5 December 2012Paola Tropea & Hans Postema14

In the UXC (3) 5 December 2012Paola Tropea & Hans Postema15

Manifold 2 nd to come.. To Pixel Detector: Branch to existing copper tubes 5 December 2012Paola Tropea & Hans Postema16

Possible products? 5 December 2012Paola Tropea & Hans Postema17

Schedule Sept 2012/Mar 2013 – Design Dec 2012 / Mar 2013 – Specifications Feb 2013/April Verification of the design on site May CMS Technical Coordination review on transfer line project June 2013 – Tender Sep 2013 – Place the order Installation on site May Mandatory availability of the transfer lines 5 December 2012Paola Tropea & Hans Postema18

Estimated dimensions (1) Inner tube needs about 10 mm diameter 110 bar design pressure Elastic limit above 1.5x110=165 bar (PED) Test at 1.43x110=157 bar (PED) 316L tube 12x1 mm, allowable working pressure: 200 bar, source: Swagelok Pressure reduction due to bending: TBD Increase in wall thickness is acceptable, if required 5 December 2012Paola Tropea & Hans Postema19

Estimated dimensions (2) Outside tube: DN25 Pressures identical to inner tube EN ISO 1127, 33.7 mm OD, 3.2 mm wall, design pressure 244 bar, source Outo Kumpu Elbows with straight ends, ISO R=2D 33.7x3.2 mm, design pressure: 155 bar, source Outo Kumpu Welding methods: – By hand – Orbital welding – Orbital welding with filler material 5 December 2012Paola Tropea & Hans Postema20

Vacuum jacket Requesting DEMACO advice on spacing between outer tube and vacuum jacket Inner and outer tube have, by design, virtually the same temperature. No thermal expansion issue expected Thermal expansion issue between tube (-30 C) and jacket (+25 C) Requesting DEMACO advice on solution 5 December 2012Paola Tropea & Hans Postema21

Overall goals Writing specification for tender Including DEMACO advice Respecting your production capabilities Optimization of cost by including DEMACO experience Optimize between on-site and off-site work Avoiding differences in safety approach between PED, DEMACO and CERN safety Receive preliminary approval from safety before placing the order 5 December 2012Paola Tropea & Hans Postema22

Drawing with dimensions 5 December 2012Paola Tropea & Hans Postema23