Community Development Department Royal Palms Parkway City Council Workshop July 29, 2014.

Slides:



Advertisements
Similar presentations
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
Advertisements

Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
District 2 System Preservation Projects for FY 15 and FY 16 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
State of Morrisville Mayor Mark Stohlman July 17, 2014.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Location Hammock Dunes DRI – Includes: -Hammock Beach -Ocean Hammock
FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland.
Ed Cox City of Sacramento, Department of Public Works Bicycle Solutions in Sacramento.
Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.
RED LIGHT CAMERAS CITY COUNCIL WORKSHOP NOVEMBER 29, 2011.
City of Palm Coast- Flagler County Transportation Impact Fees City Council-Flagler County Commission Workshop.
Intergovernmental Agreements Lands for Matanzas Woods Parkway 4-laning City Council Workshop November 12, 2013.
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
Community Development Department CP AND HG RESIDENTIAL LOTS, LLC AND CITY OF PALM COAST MASTER PLAN DEVELOPMENT AND SETTLEMENT AGREEMENT.
From Island Estates Parkway to St. Johns County Line.
PUBLIC WORKS DEPARTMENT RED LIGHT CAMERA UPDATE FY Budget Worksession July 12, 2011.
Planning for the Future History of Apparatus City Incorporated 1999: All County apparatus associated with the Palm Coast Fire Department became the possession.
Virginia Street Bus RAPID Transit Extension Presentation to RTC July 17, 2015 Project Purpose Extend RAPID to UNR Improve pedestrian safety & access Create.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
KEEP PALM COAST March 27, 2012 City Council Workshop.
CITY COUNCIL GOALS & OBJECTIVES. TOP PRIORITY Street Valley Gutters 33 installed by Public Works 35 installed by contractor Pipe Replacement Program.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Operation & Maintenance Budget Public Works Department FY Budget Worksession July 13, 2015.
Using Data To Drive Down Fatalities Roseanne Nance Bureau of Safety Engineering Illinois Department of Transportation.
HIKE ASPEN FALLS Guide to hiking and walking paths in and around our city.
Community Development Department PINE LAKES PARKWAY NORTH ROADWAY IMPROVEMENTS.
Community Development Department Construction Phase.
FINAL BUDGET CITY COUNCIL PUBLIC HEARING SEPTEMBER 27, 2011.
Community Development Department Construction Phase BULLDOG DRIVE.
TENTATIVE BUDGET PRESENTATION CITY COUNCIL PUBLIC HEARING SEPTEMBER 8, 2010.
STATE ROAD 100 CRA FY 2012/2013 Annual Report October 29, 2013 Workshop.
Signal Optimization Study Community Development Department.
PROPOSED BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 23, 2011.
April 18, 2013 Luke Lortie, EIT Jerry Auge, PE
Regional Transportation Committee (RTC) 10-Year Project Milestone Policy Transportation and Trinity River Project Committee October 26, 2015.
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
Stormwater Budget Overview Just a Reminder. Infrastructure Inventory for Stormwater Drainage System 19 Major Canal Control Structures 19 Major Canal Control.
SIGNAL OPTIMIZATION STUDY COMMUNITY DEVELOPMENT DEPARTMENT.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Pierce Butler Lexington Parkway Bicycle Connection Presented by: Mr. Michael Recycles Bicycles Sponsored by: Mr. Michael Recycles Bicycles District 11.
From US 17 to SR 11 and SR 11 to Cone Road FPID No October 25, 2011.
STATE ROAD 100 CRA Update to City Council November 13, 2012 Workshop.
Transportation Projects City Council Workshop May 14, 2013.
October 15 th, 2013 The City of Akron SUM – Exchange Street / Cedar Street Corridor Safety Study.
DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Boulder Rock Drive Crossing Rehabilitation Project - Structure F-2  Major Roadway Crossing Culvert Replacement November 17, 2015.
Modify guardrail ends to increase access width Action 1.
INTERNATIONAL DRIVE CRA FY Budget Worksession July 11, 2011.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
Saving the King Street Bicycle Boulevard
The Gainesville Area Chamber Infrastructure Investment Initiative
Pedestrian Pathways Aspen Falls Greenway.
S.R. 30A / U.S. 98 / Panama City Beach Parkway
LOCATION MAP/AERIAL COM-2 site is acres
Project Status & Right-of-Way Acquisition
Signal Improvement Project COMMUNITY DEVELOPMENT DEPARTMENT
BELLE TERRE BLVD/PKWY CORRIDOR COMMUNITY DEVELOPMENT DEPARTMENT
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
BICYCLE AND PEDESTRIAN MASTER PLAN FINAL PRESENTATION
Dallas DISTRICT CURRENT/FUTURE CONSTRUCTION PROJECTS FISCAL Years
Construction Management & Engineering
Gunnerson Street Safety Project
Protected Bicycle Lanes Finally Pedal Their Way to KC…
Project Location. Cambridge/Arlington Intersection Reconstruction Public Information Meeting June 16, 2015.
Jaime Jordan, PE Project Manager Eric Germundson, EI Roadway Designer
Project Location: 35th Ave HSIP8
Annual Operating Budget & 5 Year Capital Improvement Project Budget
Presentation transcript:

Community Development Department Royal Palms Parkway City Council Workshop July 29, 2014

Community Development Department Scope of Work Project Length: 2.2 Miles Roadway resurfacing with new four foot paved shoulders New Eastbound Left Turn Lane at Royal Palms Pkwy and Rickenbacker Drive – Improves safety and intersection capacity New Eastbound Right Turn Lane at Royal Palms Pkwy and Belle Terre Pkwy – Improves safety and intersection capacity Safety improvements for path to Lehigh Trail at the intersection of Royal Palms Pkwy and Rymfire Drive –Three Rectangular Rapid Flashing Beacons (RRFB) –Median Refuge

Community Development Department Pedestrian Improvements Royal Palms Pkwy & Rymfire Drive

Community Development Department Map Area Project Start Project End US 1 Royal Palms Pkwy Belle Terre Pkwy

Community Development Department Original Estimated Construction Budget – $900k Proposed FY 2015 Budget - $1.33 Million Actual Cost –Construction Bid – $1.18 million –Contingency, CEI & Misc Expenses – $150k –Total – $1.33 million Project Budget