This presentation shall describe; Work over the last 3 months Ongoing work Plans for the future CM 32.

Slides:



Advertisements
Similar presentations
London & Zurich Plc User Guide. Service Benefits Full on-line management of client accounts Paperless direct debit – no signatures required Standing orders.
Advertisements

User Guide. Service Benefits  Full on-line management of client accounts  Paperless direct debit – no signatures required  Standing orders fixed not.
Business Data Transfer Accountant Tutorial. Adding a Client.
MAUS Update Adam Dobbs, MICE Project Board, 16 th April 2015.
Software Summary Database Data Flow G4MICE Status & Plans Detector Reconstruction 1M.Ellis - CM24 - 3rd June 2009.
Online Reconstruction Update Linda R. Coney UCR Mar 25, 2010.
Online Reconstruction Update Linda R. Coney UCR Dec 17, 2009.
GForge: A collaborative development environment Presentation by: Geoff Gerfin.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
Presentation to AEO Conference at Killashee House hotel 19 th May 11.
Software Summary 1M.Ellis - CM23 - Harbin - 16th January 2009  Four very good presentations that produced a lot of useful discussion: u Online Reconstruction.
Step by Step Instruction: How to Conduct Direct Certification using File Upload: SAIS IDs Released January 2014 “How to Conduct Direct Certification using.
CTRP User Call April 3, 2013 Gene Kraus CTRP Program Director.
IMC service provider bidding steps. Add your Username and Password as shown above.
Vanche Gujarat Abhiyaan(VGA)- Best Reader Competition Online Student Registration and Data Entry presentation.
Offline Software Summary 1M.Ellis - CM25 - 6th November 2009  Release Schedule  Simulation and Analysis Update  Detector software: u CKOV u EMR u KL.
2013 Computer Architecture Project MIPS Programming : Merge Sort ChangHyun Yun Room 236, Engineering Building.
Draft Policy Standardize IP Reassignment Registration Requirements ARIN XXVI 6 October, 2010 – Atlanta, Georgia Chris Grundemann.
A STEP-BY-STEP GUIDE FOR TEACHERS AND STUDENTS How to Use Google Documents.
Software Status  Last Software Workshop u Held at Fermilab just before Christmas. u Completed reconstruction testing: s MICE trackers and KEK tracker.
G4MICE Status and Plans 1M.Ellis - CM24 - RAL - 31st May 2009  Firstly, a correction to the agenda:  I failed to spot a mistake in the agenda that I.
Configuration Database David Forrest 15th January 2009 CM23, HIT, Harbin.
The Homepage My Campaign is where you can track your contacts information.
Online Reconstruction 1M.Ellis - CM th October 2008.
1 KEK test-beam software progress Malcolm Ellis MICE Video Conference 4 th May 2005.
This presentation shall describe; The motivation to design a new system How the new system works and user interaction Current work/results Future work.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
LG DATABASE AND REPORTING SYSTEM (LGDRS) 8-9 September 2015
LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC.
M. Ellis - MICE Video Conference - 30th August Software Report Recent progress:Recent progress: –Start of code to read DATE format (two parts) One.
26 Oct 2010PC Physics Requirements of Software from Chris R ~19 Oct. My.
G4MICE’s DataQualityCheck application G4MICE’s DataQualityCheck application: Preliminary thoughts Mark Rayner 23 rd February 2010.
How To Get Started in Analysis with Atlas software FAQ on How to Get account at BNL
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
Software Overview 1M. Ellis - CM21 - 7th June 2008  Simulation Status  Reconstruction Status  Unpacking Library  Tracker Data Format  Real Data (DATE)
1 Configuration Database David Forrest University of Glasgow RAL :: 31 May 2009.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
Joe Foster 1 Two questions about datasets: –How do you find datasets with the processes, cuts, conditions you need for your analysis? –How do.
This presentation will describe the state of each element in the beam line with regards to the current update being undertaken. Firstly, it will describe.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
NAU New Project Submission Guidance for creating a new project.
MAUS Status and Plans Chris Rogers, ASTeC, Rutherford Appleton Laboratory.
Add Documents In Your Gmail Account For Any Help Dial Gmail Support Number. For more details visit:-
Installing RMS 3.0 Contractor Mode
CMS Calibration Management System
HOW TO CREATE YOUR LISTING
Offline Software A. Dobbs CM43 30th October 2015.
Database High-Level Overview
MICE Collaboration Meeting Saturday 22nd October 2005 Malcolm Ellis
Data Management and Database Framework for the MICE Experiment
Chris Rogers, ASTeC, Rutherford Appleton Laboratory
GERDA Collaboration Meeting,
Chris Rogers, ASTeC, Rutherford Appleton Laboratory
September 2013 Leaders Meeting
Geant4 Space Users Requirements
Chris Rogers, ASTeC, Rutherford Appleton Laboratory
Status of MC production on the grid
Chris Rogers, ASTeC, Rutherford Appleton Laboratory
Program Management Portal (PgMP): What’s New in Release 16.1
Adding and editing users
CPIM/CLTD Bundling: Voucher Distribution Process
CHANNEL PARTNER GUIDE.
Adding and Editing Users
Counselor Portion of the Student Profile
Activating Your Account and Navigating Through TIDE
Providing Access to Statistics Through the Internet
Registration on Income Tax India e-Filing Website.
Back of the Room: Anyone who is not performing in the simulations.
Registration Stand By Me
Completing the School Official Portion of the Student Profile
Presentation transcript:

This presentation shall describe; Work over the last 3 months Ongoing work Plans for the future CM 32

CM 32 CAD Import is now in MAUS After the last collaboration meeting the CAD Import was merged with the trunk and release in MAUS Big Thanks to Chris R for working on the merge!

The Designed System To use this transfer in an efficient manner a new geometry handling system was designed. GDML_MICE G4 Field Info Surveys/Technical Drawings ConfigDB Run Info (from Control Room) Above: Technical Drawing of Quad Right: CAD Drawing of Quad Below: G4MICE Simulation Example CM 32 MAUS CAD

CM 32 Current Work Current Work is on, Field Information (G4 Field) has been added to GDML About to be tested Detector Internal Geometries being added to GDML (Tracker) First draft of the entire hall’s CAD model being made (Jason Tarrant)

Current Work CM 32 To add the field and detector information we needed to, Extend the GDML schema to include MICE specific Information (Can be found in ‘GDML_MICE.xsd’ in MAUS)

CM 32 Current Work CM 32 To add the field and detector information we needed to, Change the XSLT script to account for the new changes (Can be found in ‘GDML2G4MICE.xsl’ in MAUS)

CM 32 Current Work These changes allow us to write MICE specific information in GDML which can stand alone, in its own file, or can be added to the geometry information which is genuine GDML.

CM 32 Current Work

Future Work Once Jason Tarrant’s CAD is complete upload it to database (first official geometry Finalise details of management (Fastrad translation and internal detector geometries) Write code which downloads the geometry directly to the simulation (doesn’t download a local copy) Collect internal geometries from each detector group (Oleg from the tracker and Gene from the CKOV have already begun) and then extend the GDML_MICE schema As always TESTS! TESTS! TESTS! I currently have a CAD of the EMR and will be starting tests with this geometry. CM 32

Thank You for Listening CM 32 Any Questions? If you have CADs which you wish to simulate please me the.stp or.step files and I can return MICE Modules which you can use in MAUS.

CM 32

CM 32

CM 32