LCG Report from GDB John Gordon, STFC-RAL MB meeting February24 th, 2009.

Slides:



Advertisements
Similar presentations
LCG-France Project Status Fabio Hernandez Frédérique Chollet Fairouz Malek Réunion Sites LCG-France Annecy, May
Advertisements

WHAT\WHOALICEATLASCMSLHCB Assigned To Concerned VO ALARM 23 (real: 1)114(real: 34)3 2(real: 4)50(real: 12) TEAM Closed.
LCG Introduction Kors Bos, NIKHEF, Amsterdam GDB Jan.10, 2007 IT Auditorium.
CREAM John Gordon GDB November CREAM number of sites now – gstat2 says 24. Batch systems supported Experiment Tests Feedback from sites. Evaluation.
Patricia Méndez Lorenzo (IT/GS) ALICE Offline Week (18th March 2009)
LHCC Comprehensive Review – September WLCG Commissioning Schedule Still an ambitious programme ahead Still an ambitious programme ahead Timely testing.
CERN - IT Department CH-1211 Genève 23 Switzerland t LCG Deployment GridPP 18, Glasgow, 21 st March 2007 Tony Cass Leader, Fabric Infrastructure.
SRM 2.2: status of the implementations and GSSD 6 th March 2007 Flavia Donno, Maarten Litmaath INFN and IT/GD, CERN.
WLCG Service Schedule June 2007.
LCG Introduction John Gordon, SFTC GDB December 2 nd 2009.
WLCG Service Report ~~~ WLCG Management Board, 24 th November
John Gordon STFC-RAL Tier1 Status 9 th July, 2008 Grid Deployment Board.
Ian Bird LCG Project Leader LHCC Referee Meeting Project Status & Overview 22 nd September 2008.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Angela Poschlad (PPS-FZK), Antonio Retico.
LCG Introduction John Gordon, STFC-RAL GDB September 9 th, 2008.
INFSO-RI Enabling Grids for E-sciencE SA1 and gLite: Test, Certification and Pre-production Nick Thackray SA1, CERN.
Pilot Jobs John Gordon Management Board 23/10/2007.
LCG Pilot Jobs + glexec John Gordon, STFC-RAL GDB 7 November 2007.
Alberto Aimar CERN – LCG1 Reliability Reports – May 2007
LCG Introduction John Gordon, STFC-RAL GDB May 2, 2007.
Storage Accounting John Gordon, STFC GDB March 2013.
Ian Bird LCG Project Leader Project status report WLCG LHCC Referees’ meeting 21 st September 2009.
LCG Introduction John Gordon, STFC GDB September 14 th 2011.
LCG Introduction John Gordon, STFC GDB December14 th 2011.
LCG Introduction John Gordon, STFC GDB June 8 th 2011.
WLCG Service Report ~~~ WLCG Management Board, 7 th September 2010 Updated 8 th September
LCG Support for Pilot Jobs John Gordon, STFC GDB December 2 nd 2009.
Plans for Service Challenge 3 Ian Bird LHCC Referees Meeting 27 th June 2005.
LCG 3D Project Update (given to LCG MB this Monday) Dirk Duellmann CERN IT/PSS and 3D
LCG Introduction John Gordon, STFC GDB July8th 2009.
Report from GSSD Storage Workshop Flavia Donno CERN WLCG GDB 4 July 2007.
LCG Accounting Update John Gordon, CCLRC-RAL WLCG Workshop, CERN 24/1/2007 LCG.
LCG User Level Accounting John Gordon CCLRC-RAL LCG Grid Deployment Board October 2006.
WLCG Service Schedule LHC schedule: what does it imply for SRM deployment? WLCG Storage Workshop CERN, July 2007.
SL5 Site Status GDB, September 2009 John Gordon. LCG SL5 Site Status ASGC T1 - will be finished before mid September. Actually the OS migration process.
CERN IT Department CH-1211 Genève 23 Switzerland t SL(C) 5 Migration at CERN CHEP 2009, Prague Ulrich SCHWICKERATH Ricardo SILVA CERN, IT-FIO-FS.
WLCG Operations Coordination Andrea Sciabà IT/SDC 10 th July 2013.
LCG Issues from GDB John Gordon, STFC WLCG MB meeting September 28 th 2010.
The Grid Storage System Deployment Working Group 6 th February 2007 Flavia Donno IT/GD, CERN.
LCG Pilot Jobs + glexec John Gordon, STFC-RAL GDB 7 December 2007.
WLCG Operations Coordination report Maria Alandes, Andrea Sciabà IT-SDC On behalf of the WLCG Operations Coordination team GDB 9 th April 2014.
Status of gLite-3.0 deployment and uptake Ian Bird CERN IT LCG-LHCC Referees Meeting 29 th January 2007.
Summary of SC4 Disk-Disk Transfers LCG MB, April Jamie Shiers, CERN.
LCG Tier1 Reliability John Gordon, STFC-RAL CCRC09 November 13 th, 2008.
WLCG Service Report ~~~ WLCG Management Board, 10 th November
SRM 2.2: experiment requirements, status and deployment plans 6 th March 2007 Flavia Donno, INFN and IT/GD, CERN.
Outcome should be a documented strategy Not everything needs to go back to square one! – Some things work! – Some work has already been (is being) done.
LCG Accounting Update John Gordon, CCLRC-RAL 10/1/2007.
LCG Introduction John Gordon, STFC-RAL GDB June 11 th, 2008.
LCG Introduction John Gordon, STFC-RAL GDB November 7th, 2007.
Accounting Update John Gordon. Outline Multicore CPU Accounting Developments Cloud Accounting Storage Accounting Miscellaneous.
LCG Introduction John Gordon, STFC-RAL GDB August 31st, 2007.
LCG Introduction John Gordon, STFC GDB December 7 th 2010.
T0-T1 Networking Meeting 16th June Meeting
WLCG IPv6 deployment strategy
Dirk Duellmann CERN IT/PSS and 3D
LCG Service Challenge: Planning and Milestones
gLite->EMI2/UMD2 transition
Grid Deployment Area Status Report
Database Readiness Workshop Intro & Goals
Update on Plan for KISTI-GSDC
John Gordon, STFC-RAL GDB March 11, 2009
John Gordon, STFC-RAL GDB April 8th 2009
Summary from last MB “The MB agreed that a detailed deployment plan and a realistic time scale are required for deploying glexec with setuid mode at WLCG.
John Gordon, STFC GDB October 12th 2011
John Gordon, STFC GDB April 6th 2011
LHC Data Analysis using a worldwide computing grid
WLCG Collaboration Workshop: Outlook for 2009 – 2010
MB Maarten Litmaath CERN v1.0
IPv6 update Duncan Rand Imperial College London
Presentation transcript:

LCG Report from GDB John Gordon, STFC-RAL MB meeting February24 th, 2009

LCG March GDB Accounting Policies –Discuss today ASGC Incident –A reminder that disaster recovery plans are not just hypothetical. Reporting Installed Capacity –To be deployed soon –Lots of documentation, tests and GGUS group to advise sites Middleware Update –Drawing up plan for SL5 for the rest of the m/ware. –You can still influence this. WN SL5/64 bit –Release due 23/3, experiments expect to test at each site, before full switch 2

LCG Multiuser Pilot Job Frameworks –Good progress with SCAS, CREAM –Lots of positive progress –Encourage more sites to deploy the next (due soon) release in parallel with LCG-CE –Still doesn’t pass user requirements to local batch system –More batch systems need supporting. WMS Performance –Recommended updating to mega-patch (not a success) –Will not meet spec without using bulk job-submission. 3

LCG When Ready for LHC VOs? ASGC 64 bit already SL4 BNL CERN 10% already. 2 CEs. New nodes installed as SLC5 CNAF FNAL FZK end April NL-T1 Require UI? If that ready by mid-april then end of summer. NDGF - ready PIC – test ASAP hope April. IN2P3 – Start in June with new WNs RAL – end July TRIUMF -

LCG Pre-GDB Mike Vetterli proposed Tier2 Storage (DPM, Storm) –Castor and dCache have held meetings –Discuss at workshop –April? Virtualisation –Lots of work happening –Share experience 5

LCG Topics for April Meeting Installed Capacity –Progress in deployment Distributed Monitoring –Hopefully with demonstration Pilot Jobs –VO tests CREAM WMS Performance Operational Security Accounting Policies 64 bit 6