LHC Enhanced Quench Protection System Review 24 – 26 February 2009.

Slides:



Advertisements
Similar presentations
Testing Relational Database
Advertisements

P5, M1, D1.
February 2009 Summary of Chamonix 09 Steve Myers.
K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
Computer Security: Principles and Practice
Systems Engineering Management
Purpose of the Standards
Protection Against Occupational Exposure
CSC271 Database Systems Lecture # 20.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
REVIEW OF THE CRYOGENIC BY-PASS FOR THE LHC DS COLLIMATORS ELECTRICAL CIRCUIT MODIFICATION, INCLUDING OPERATIONAL CONSIDERATIONS PRESENTED BY A. SIEMKO.
TF Joint Voltage Drop Instrumentation Robert Marsala (609) Hans Schneider (609) Engineering Operations August 7, 2003 TF_JOINT_Final_Design_Review.ppt.
Chapter 9 Database Planning, Design, and Administration Sungchul Hong.
Database System Development Lifecycle © Pearson Education Limited 1995, 2005.
Overview of the Database Development Process
Dr Andy Brooks1 FOR0383 Software Quality Assurance Lecture 1 Introduction Forkröfur/prerequisite: FOR0283 Programming II Website:
CRYOGENICS AND POWERING
Overview of the recommendation on LHC Splices Consolidation Frederick Bordry, head of the CERN Technology Department, has called for a series of three.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
Installation and Maintenance of Health IT Systems
Creating a Shared Vision Model. What is a Shared Vision Model? A “Shared Vision” model is a collective view of a water resources system developed by managers.
J. G. Weisend II Deputy Head of Accelerator Projects April 2, 2014 Actions at ACCSYS Resulting from the Recommendations of the Annual Review.
How to achieve higher redundancy of the UPS for QPS ? -The lack of redundancy concerns the supply lines from UPS to consumer but equally parts of the UPS.
A. Verweij, TE-MPE. 3 Feb 2009, LHC Performance Workshop – Chamonix 2009 Arjan Verweij TE-MPE - joint stability - what was wrong with the ‘old’ bus-bar.
A. Siemko and N. Catalan Lasheras Insulation vacuum and beam vacuum overpressure release – V. Parma Bus bar joints stability and protection – A. Verweij.
TE-MPE Workshop 14/12/2010, Manuel Dominguez, TE/MPE-EI 1 Stephen Pemberton, TE/MPE-EI RB Earth Spark Investigation Initial Report. S. Pemberton, G. D’Angelo.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
Superconducting IR Magnets CHEN, Fusan May 11, 2007.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #28 Sofia, Bulgaria.
TE-MPE-CP, RD, 09-June Enhanced Diagnostics & Supervision for Quench Heater Circuits R. Denz TE-MPE-CP.
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
AT-MEI-PE, RD, LIUWG 31-JUL R. Denz AT-MEI-PE LHC Luminosity Upgrade Protection of the Inner Triplet, D1, Correctors and Superconducting Links/Leads.
Installation and Maintenance of Health IT Systems Unit 8b Troubleshooting; Maintenance and Upgrades; and Interaction with Vendors, Developers, and Users.
Fabio Formenti - Feb. 25th, LHC enhanced Quench Protection System project Review committee meeting February 24 th –26 th 2009.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
A PROPOSAL TO PULSE THE MAGNET BUSES TO VALIDATE SPLICE QUALITY H. Pfeffer 3/7/09 Version 4.
Root Cause Analysis Analyze Kaizen Facilitation. Objectives Learn and be able to apply a fishbone diagram Utilize “Why” analysis technique to uncover.
NQPS commissioning …a long way to go. Topics nQPS component overview Enhancements in Firmware Commissioning diagram Detailed task list Summary.
TE-MPE-CP, RD, LHC Performance Workshop - Chamonix Feb R. Denz TE-MPE-CP on behalf of the QPS team QPS Upgrade and Re-commissioning.
1 J. Mourao (TE/MPE/CP) Enhanced DQHDS functionality  Status for 2011  Increase Magnet diagnostic capabilities  Our proposals.
HWC with nQPS Splice Monitoring Zinur Charifoulline & Bob Flora Real Time (~10 sec) BUS Voltage Energy Extraction Trip 300 µV threshold on Un-bypassed.
Ruben Carcagno, Sandor Feher, George Velev (team leader) MQXFS1 status meeting Summary of the MQXFS1 Investigation.
SQA COMPONENTS IN THE PROJECT LIFE CYCLE C HAPTER 8 Dr. Ahmad F. Shubita.
Chapter 9 Database Planning, Design, and Administration Transparencies © Pearson Education Limited 1995, 2005.
IT Governance Purpose: Information technology is a catalyst for productivity, creativity and community that enhances learning opportunities in an environment.
The Large Hadron Collider The 19 th Sep 2008 incident [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] NIKHEF Seminar ( )
Cryomodule Safety Approvals Jay Theilacker LCLS-II Production Cryomodule Final Design Review May 12-14, 2015.
Closing Session Report
NERC Published Lessons Learned Summary
Kursus “electronic assemblies & SOLDERING Technique”
HL-LHC IT STRING and Series test of SC link
LHC Enhanced Quench Protection System Review
Testing of SC Magnets Status - November 2010
The HL-LHC Circuits: Global View and Open Questions
12 October 2009 RRB Plenary R.-D. Heuer
Consequences of warming-up a sector above 80 K
FMEA of a CLIQ-based protection of D1
Systems Analysis and Design
Lucio Rossi Project Leader
International Review of the Conceptual Design of the Cold Powering system for the HL-LHC Superconducting Magnets J.Ph. Tock
the CERN Electrical network protection system
Circuits description and requirements - Closed Session-
Detailed global view on protection and detection of the circuits
TEST PLANS for HL LHC IT STRING
Verification and Validation Unit Testing
Enterprise Content Management (ECM) Project
Power Leads for Test Stands
R. Denz, TE-MPE-EP Acknowledgements: J. Steckert
Presentation transcript:

LHC Enhanced Quench Protection System Review 24 – 26 February 2009

Page 2 LHC Enhanced Quench Protection System Review, 24 – 26 February 2009 Enhanced QPS Review Panel Reinhard BacherDESY George GanetisBNL Howie PfefferFNAL Jim StraitFNAL Dan StoutITER Jay Theilacker (chair)FNAL

Page 3 LHC Enhanced Quench Protection System Review, 24 – 26 February 2009 Enhanced QPS Review We wish to thank the LHC management for inviting us to serve on this review committee and giving us the opportunity to make a small contribution towards the success of this great endeavor.

Page 4 LHC Enhanced Quench Protection System Review, 24 – 26 February 2009 Enhanced QPS Review We wish to thank the Machine Protection staff for the unstinting granting of their time, for their candor and for engaging with us in the spirit of collegiality and common effort as we have tried to understand the issues related to the upgrade of the Quench Protection System. The level of understanding and development since 19 September has been very impressive.

Page 5 LHC Enhanced Quench Protection System Review, 24 – 26 February 2009 Review Charge 1. Review in terms of completeness, the functional specifications of the proposed new system, in particular, the strategy for the proposed new scheme to detect (and protect against) abnormally high resistance “splices” and the detection of a symmetric quench. 1. Review and analyze the technical details of the proposed implementation of the new enhanced Quench Detection and Protection system paying particular attention to the critical nature of the system with respect to LHC operation. 1. Examine all operational issues associated with the new system in particular the two extremes of failing to trigger when necessary and spuriously triggering unnecessarily and thereby causing down time of the LHC. 1. Review the planning schedule foreseen for the completion of the new Enhanced QPS system and define priorities (high resistance splice detection vs symmetric quench). 1. Review the robustness of the new system which should operate reliably during many years in a hostile environment (including radiation) of the LHC tunnel.

Page 6 LHC Enhanced Quench Protection System Review, 24 – 26 February 2009 Functional Specifications Recommendation Write a formal overall project specification for the design of the splice protection system Recommendation Write a formal overall project specification for the design of the symmetric quench protection system

Page 7 LHC Enhanced Quench Protection System Review, 24 – 26 February 2009 Functional Specifications Recommendation Collect and review existing Miits limit calculation documentations for all components in all circuits and generate a summary document for design and reference. Use it to verify existing circuit protection designs.

Page 8 LHC Enhanced Quench Protection System Review, 24 – 26 February 2009 Technical Details Finding - High Resistance Splice Detection The Machine Protection staff has demonstrated a deep understanding of the issues involved in the design of this system: noise levels, filtering, choice of electronics, radiation sensitivity, etc. We have full confidence that their new system will have the ability to detect and interlock errors on the level of 0.3 mv and to give early warnings for suspicious splices measured at the level of 1 nohm. With this system in place, they will be able to detect resistive splices.

Page 9 LHC Enhanced Quench Protection System Review, 24 – 26 February 2009 Technical Details Recommendation – High Resistance Splice Protection System We strongly recommend that the Machine Protection staff develop techniques to put at least 1 kA through the splices in a non-superconducting state so that they can then measure voltages across the buses and uncover any splices that have good superconducting joints but poor electrical contact through the copper stabilizer in the main bus joint. Any such splice, if present, would be undetectable by the High Resistance Splice Detection system. It would lurk like a “Silent Killer”, with the potential for a bus failure whenever it quenched at operational current levels.

Page 10 LHC Enhanced Quench Protection System Review, 24 – 26 February 2009 Technical Details Recommendation – Existing QPS We strongly recommend that the existing magnet coil quench protection system be modified to include the single joint within each magnet that is presently not included in the system that measures magnet resistances at the 10 nohm level. Accomplish this through modification of the “IFS box”. With three known bad internal splices already identified, we feel that these joints cannot be left unmonitored. Although a failure of this joint will not be as harmful as that of a bus joint, the failure will destroy the individual magnet and will have the capability of burning holes within the magnet cryostat.

Page 11 LHC Enhanced Quench Protection System Review, 24 – 26 February 2009 Technical Details Findings – Symmetric Quench Protection System The machine Protection staff has grasped the opportunity provided by the installation of the splice detection system to design an excellent Symmetric Quench detection system, making good use of the new cables to minimize the effort required and selecting the system with the best features of all of the considered alternatives (the 3+1 system in the case of dipoles). We have confidence that this system, once its design is complete, will be able to detect quenches at the 200mv level [twice the normal detection level] and will provide an important redundant back-up to the existing magnet coil quench protection system.

Page 12 LHC Enhanced Quench Protection System Review, 24 – 26 February 2009 Technical Details Recommendation – Symmetrical Quench Protection System None

Page 13 LHC Enhanced Quench Protection System Review, 24 – 26 February 2009 Operational Issues Recommendation Power the accelerator only after the splice protection, symmetric quench protection and redundant UPS systems have been installed and commissioned. Prior to superconducting operation, either experimentally verify that all main bus copper stabilizers exhibit adequate longitudinal conductance or set appropriate operational limits Prior to physics operation, measure all splice resistances (bus and magnet) using developed techniques.

Page 14 LHC Enhanced Quench Protection System Review, 24 – 26 February 2009 Operational Issues Recommendation Define a dedicated operational procedure for taking, analyzing and responding to joint resistance measurement data.

Page 15 LHC Enhanced Quench Protection System Review, 24 – 26 February 2009 Planning Schedule Comments The scope of the Enhanced QPS system required for operation in fall was considerably increased at the Chamonix Workshop without a change in schedule. We are encouraged that overall Enhanced QPS project management is being developed.

Page 16 LHC Enhanced Quench Protection System Review, 24 – 26 February 2009 Planning Schedule Recommendation Laboratory management should ensure that proper resources required from outside the MPE group be made available. Review the resource assignments to confirm resource requirements and availability for the critical tasks. Develop workflow plans for production and installation of the Enhanced QPS. This should include process flow diagrams and layouts of testing, staging and work centers. Quality assurance and maintaining functional requirements must take priority over schedule.

Page 17 LHC Enhanced Quench Protection System Review, 24 – 26 February 2009 Robustness Recommendation Ensure timely procurement and testing of spare components (such as cold diodes). Monitor the radiation exposure at each Enhanced QPS system crate and develop a maintenance plan. Ensure tunnel dehumidification and temperature control in order to maintain electronics and connector reliability.

Page 18 LHC Enhanced Quench Protection System Review, 24 – 26 February 2009 We look forward to celebrating your accomplishments this fall and the coming years.