CVE 4070 Construction Engineering Course Review Prof. Ralph V. Locurcio, PE.

Slides:



Advertisements
Similar presentations
Construction Contracting
Advertisements

Construction Cost Estimating Class #2: Contract Documents Prof. Ralph V. Locurcio, PE.
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
Managing a Successful Mechanical System project Following design – what next?
SUBMITTALS PROCESSING Fall 2008 ARCH 330
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Construction Cost Estimating Class #2: Bidding Process Prof. Ralph V. Locurcio, PE.
CONSTRUCTION ADMINISTRATION Preconstruction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
KFUPM, Department of Construction Engineering and Management CEM 520 LIABILITY ALLOCATION AMONG THE PARTIES TO FIXED-PRICE CONSTRUCTIN CONTRACTS IN SAUDI.
ESTIMATING By Laith Jacob.
1 Where Do I Find it in the Contract? Understanding Government Contracts for the Property Manager: Part 1 of 2 C-200-INT NPMA.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Construction: Legal Issues. Legal Issues In the Bidding Process Timing of various activities has legal implications. During the bidding process: –A bid.
Construction Management: At Risk. PROJECT MANAGEMENT STRUCTURE: Contractual Relationships Owner Architect/Engineer General Contractor Sub Construction.
Standards of Practice Course
CONSTFUNDAMENTALSCONSTFUNDAMENTALS Overview of the Construction Industry, Chapter 2.
CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.
CEM 520 Construction Contracting Dr S. Almohawis Course Content.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Pacific Air Forces 1 Preconstruction Orientation HQ PACAF/LGC.
Courses that Meet Government Contractor Needs
Foundations of Technology.  To familiarize students with the function, applications, and requirements of construction management.
CVE 4070 Construction Engineering Project Closeout Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering Test-2 & Review Prof. Ralph V. Locurcio, PE.
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Chapter 30 Final Inspection, Contract Closing, and Project Transfer.
CON CVE 4070 Construction Engineering Course Introduction Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering Shop Drawings Quality Control
CVE 4070 Construction Engineering Contract Documents Prof. Ralph V. Locurcio, PE.
Construction Cost Estimating Class #1: Course Introduction Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
CON 2001-CVE 4070 Construction Engineering Project Organization & Stakeholders Prof. Ralph V. Locurcio, PE.
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering Career Fair & Resume Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Methods & Engineering Preconstruction Operations Resume Information Prof. Ralph V. Locurcio, PE.
Agency Construction Management :CM NOT AT-RISK
Construction Eng 221 Project Management and Administration.
CON 2001 CVE 4070 Construction Methods/Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering Quality Control Value Engineering
1/7/2016Prof. Ralph V. Locurcio, PE1 CVE 4074/5074 Leading Construction Operations Class Introduction.
CVE 4070 Construction Engineering Construction Estimating Prof. Ralph V. Locurcio, PE.
Contract Specifications Written Set of standards and procedures informing the contractors or remediation professionals of materials & operation necessary.
CVE 4070 Construction Engineering Project Closeout & Pyramid Solution
CVE 4070 Construction Engineering Project Organization Test #1 review Prof. Ralph V. Locurcio, PE.
CON 2001 & CVE 4070 Construction Engineering Tool #1 - Construction Scheduling Prof. Ralph V. Locurcio, PE.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering Project Budget & Cost Control Prof. Ralph V. Locurcio, PE.
2/25/2016Prof. Ralph V. Locurcio, PE1 CVE 4074/5074 Leading Construction Operations Class Introduction.
CVE 4070 Construction Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
CVE 4070 Construction Engineering HW #6 review Test-2 & Review Prof. Ralph V. Locurcio, PE.
An Overview Of The MBP CM Leadership Manual Presented by: Robert J. Carter, CCM Robert M. Pfeiffer, CCM.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
1 Today’s pegboard Drawings & Specd due 11/21. 2 Today’s pegboard Cirrious Tightpinch.
The Intricacies of the Beginning and the End of a Project CM Leadership Manual Presented by: Todd Scholtz, LEED AP Carlos Sanchez, LEED AP BD+C.
Engineering a Good Project Drew Seaman. Engineering: the work of designing and creating large structures (such as roads and bridges) or new products or.
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
SCHEDULE MANAGEMENT MODULE 8. Required by Specification City/Caltrans Level 1 schedule – simple Less than $1 million, less than 100 working days Advanced.
CONTRACT DOCUMENTS & CONSTRUCTION
Designers’ Manual Overview and Chapter Contents
Construction Engineering Change Order - 2 Prof. Ralph V. Locurcio, PE
CVE 4070 Construction Engineering
Construction Operation
CVE 4070 Construction Engineering Class #9: Project Tour
Construction Engineering Change Order - 2 Prof. Ralph V. Locurcio, PE
Department Of Energy Review Linac Coherent Light Source Project
State Aid Construction
Directed Change Constructive Change
Presentation transcript:

CVE 4070 Construction Engineering Course Review Prof. Ralph V. Locurcio, PE

Course review - I  Project delivery process Pyramid analysis  Responsibilities of parties  Tour ongoing construction Conduct of operations Complexity of coordinating trades Impact of externalites  Preconstruction operations Contract documents & order of precedence Specs & Drawings; use of standard specs Contract bid & award process Bonds

Course review - II  Contract Administration Inspection process & Inspection Manual Submittal process Quality Control & Assurance Role of the resident engineer  Disaster Recovery Construction Differs from normal Types of contracts used Skills you will need

Course review - III  Where we are going… Scheduling – types & when used Use of MS Project – Pyramid schedule Construction operations Quality control Measurement & Payments Estimating Changes & Disputes Negotiating Laws & legal issues Value engineering Project closeout

Admin announcements…  Future assignments  Notebook items to date  Hand in Career Fair homework  Hand in Pyramid schedule  Critique of Pyramid schedule  Review of course  Quiz – 30 min.  Critique of quiz

Notebook items to date…  1-Course Syllabus & Update(s)  2-Pyramid Study, Solution Handout & Homework  3-Hurricane Make-up #1 (Career Fair Interview)  4-Hurricane Make-up #2 (Chapter 4 Summary)  5-Hurricane Make-up #3 (Chapter 18 Summary)  6-Disaster Recovery Class Handout  7-Construction Tour Homework  8-Quiz #1  9-Quiz #2  10-Quiz #3  11-Hurricane Make-up #4 (Your Resume)  12-Pyramid Schedule  13-Quiz #4

Pyramid Construction…

Course review - I  Project delivery process Pyramid analysis  Responsibilities of parties  Tour ongoing construction Conduct of operations Complexity of coordinating trades Impact of externalites  Preconstruction operations Contract documents & order of precedence Specs & Drawings; use of standard specs Contract bid & award process Bonds

Course review - II  Contract Administration Inspection process & Inspection Manual Submittal process Quality Control & Assurance Role of the resident engineer  Contract scheduling Types of schedules & when used Use of MS Project Pyramid Schedule  Disaster Recovery Construction Differs from normal Types of contracts used Skills you will need

Course review - III  Where we are going… Operations & Quality control Measurement & Payments Estimating Changes & Disputes Negotiating Project closeout Laws & legal issues Value engineering

Things to remember-1  Construction operations… Cost control Performance control Charting cost & performance  Contracts & payments What is a contract Types of contracts… pros & cons, when used Progress payment process Problems with payments

Things to remember-2  Estimating… Definition Accuracy vs level of design Types of estimates – how calculated Time & location adjustments Scope, constructability, risk Estimating process Elements of cost  Changes & extra work What is a change & claim Types of changes Change order process

Things to remember-3  Claims & disputes… What is a claim or protest What are owners responses What are contractor’s responses What are compensable or non-compensable claims What is acceleration, when used, who pays What methods are available to resolve disputes Contract termination