CONFIRMATION OF MINUTES 3.11.1 (AMENDED PARA) Director (Transmission ), KPTCL stated that on account of DC current entering the neutrals of various transformers.

Slides:



Advertisements
Similar presentations
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
Advertisements

Study Committee Representatives Annual Report December, 2012
ENQUIRY BY SRLDC TO VERIFY THE DETAILS OF DC & AG BY NTPC AND NLC STATIONS PETITION NO:- 67/2003 (suo motto) & PETITION NO:- 90/2005 (TNEB) CERC HEARING.
FREQUENCY SPECTRUM FROM AUGUST 06 TO OCT 06 (UPTO 20 TH OCT 06) < 49.0 HZ< 49.5 HZ< 50.0 HZ HZ>50.2HZ>50.5 HZ Aug
1 Licensing in the Energy Sector Georgian National Energy And Water Supply Regulation Commission Nugzar Beridze June 27 – July 3, 2008.
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
LEGISLATION OVERVIEW & PROCEDURES Douglas Walker Chairman Scottish Registration Board Structural Engineers Registration Ltd.
© ABB-EWEC 2006 ATHENS /03/06 EWEC 2006 Athens The Challenges of Offshore Power System Construction Peter Jones Lars Stendius ABB.
PROCEDURE FOR:: REAL TIME CONGESTION MANAGEMENT. ASSESSMENT OF TTC TTC/ATC assessment is carried out after construction & solution of a base case power.
1 PROJECTS IN THE PIPELINE IN SOUTHERN REGION. 2 PROJECTS IN PROGRESS IN SOUTHERN REGION 400 KV MADURAI-TRIVANDRUM LINE WITH 400 KV SS AT TRIVANDRUM 400.
BRIEF ON THE REPORT OF CIGRE WG B4-45 –
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
TRANSMISSION SYSTEM KERALA K ASOKAN DIRECTOR INSTITUTE FOR SUSTAINABLE DEVELOPMENT AND ENERGY STUDIES (InSDES)
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
Module on Computation of PoC Transmission Charges
ISO Grid Planning Presentation to CREPC October 1, 2002
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
POWER GRID CORPORATION OF INDIA LTD
INDIAN POWER SECTOR. Presentation Contents: Power Sector Structure in India Transmission Planning Criteria RLDC ’ s Management System Restoration Procedures.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
W E L C O M E Power Grid Corporation of India Limited.
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT SOUTHERN REGIONAL LOAD DESPATCH CENTRE.
Tariff in Incentive is calculated as per CERC order Methodology All elements are grouped into following catagories 1.AC Transmission lines =
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
Commercial Points for 93 rd OCC meeting. Change in Bank a/c New Account for Deviation Settlement opened in Axis Bank Name of the A/C : Power System Operation.
S.P.KUMAR CM(SCADA-IT) SRLDC, POWER GRID
Queries raised by Director (Tariff) on ARR and Tariff Application of OPTCL for FY on
POWERGRID NORTHERN REGONAL LOAD DESPATCH CENTRE SUBMISSION IN RESPECT OF PETITION NO. 35/2003 DATED
RAMAGUNDAM- HYDERABAD-KURNOOL- GOOTY LINE HOW EARLY COMMISSIONING WOULD HELP.
1 Technical and Commercial Aspects K.RAMAKRISHNA DGM, SRLDC DGM, SRLDC.
CHALLENGES IN INTEGRATING SR WITH NEW GRID V.S.Verma Member(CERC )
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
Congestion regulations. Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area.
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT SOUTHERN REGIONAL LOAD DESPATCH CENTRE BANGALORE.
POWER GRID CORPORATION OF INDIA LTD
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.
PRESENTATION ON TRIPPING SCHEMES OF TALCHER STAGE-II UNITS (4X500MW) IN THE EVENT OF TALCHER – KOLAR HVDC POLE(S) OUTAGE BY NATIONAL THERMAL POWER CORPORATION.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO V MADHU, MD, KPTCL.
Transmission Tariff V.Balaji Chief Manager SRLDC.
SYSTEM OPERATION AVG, MAX & MIN DRAWAL SHARE ALLOCATION INTER-REGIONAL IMPORTS 3D FREQ OCT-03 3D SR DEMAND FREQ COMPARISION OCT-02 & OCT-03 GENERATION.
FREQUENCY EVENTS NTPC (INJECTION - DC) ISSUES NLY – II STAGE 1 (INJECTION - DC) NLY – II STAGE 2 (INJECTION - DC) NLY TPS I (Exp) (INJECTION - DC) ULDC.
1 ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps ABOUT14200 MW OF CAPACITY IS BELOW 200 Ps ABOUT MW OF CAPACITY IS BELOW 300 Ps CUM. INS. CAP.
Issues for discussion ON INTERTRIP SCHEME AT TALCHER II Present Scheme has worked satisfactorily as per the Logic designed On number of occasions unit(s)
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED PRESENTATION ON ROLE OF REGULATORS IN SELLING EXCESS POWER FROM CPPs 31ST.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND – % OF TIME NORMAL VOLTAGES THROUGH OUT THE GRID SYSTEM STRENGTHENING –GAZUWAKA.
LINKS ACHIEVEMENT SELF STARTING STATIONS SYNCHRONISING SUB-STATIONS SYNCHRONISING SUB-STATIONS.
Issue of Declared Capacity (DC), and Actual Generation (AG) by Generating Stations Hon’ble Commission has issued Interim order dated 19/ directing.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
Southern Regional Power Committee Central Electricity Authority.
BANGALORE TRANSMISSION PLANNING
LOAD FLOW STUDIES TO DURING THE ABOVE PERIOD FOR EACH YEAR AND EACH QUARTER IN EACH YEAR MAXIMUM AND MINIMUM FREQUENCY OF A DAY.
ENERGY CONSERVATION IN SR - A CASE STUDY
Damitha Kumarasinghe Director General
LIMITED LIABILITY COMPANY
Kenneth Silver Los Angeles Department of Water & Power
Scheduling of Collective Transactions Through Power Exchange
Economic Operation of Power Systems
Hon’ble Commission has issued Interim order dated 19/ directing :
PROJECTS IN THE PIPELINE IN SOUTHERN REGION
THE RPUF SCHEME KHAMMAM VIJAYAWADA NAGARJUNASAGAR HYDERABAD RAICHUR
HVDC Transmission Systems:
National Institute of Wind Energy(NIWE)
Presentation transcript:

CONFIRMATION OF MINUTES (AMENDED PARA) Director (Transmission ), KPTCL stated that on account of DC current entering the neutrals of various transformers in their system, vibrations were being experienced when ever the power flow exceeded 150 MW (agreed to change from 150 AMP to 150 MW) in ground return mode on TALCHER – KOLAR HVDC line. POEWRGRID was requested to take suitable remedial steps for which it was mentioned that POWERGRID would examine the need and explore the possibility of establishing another earthling station. TCC requested POWERGRID to take appropriate steps to ensure safe transfer of rated power in ground return mode.

2.0 GRID OPERATION On the specific issue raised by NLC in regard to increase in frequency during 18:00 Hrs AGM SRLDC made a brief presentation stating the specific causes for the same and following specific measures were suggested. On the specific issue raised by NLC in regard to increase in frequency during 18:00 Hrs AGM SRLDC made a brief presentation stating the specific causes for the same and following specific measures were suggested. STAGGERING OF LOADS STAGGERING OF LOADS BACKING OF GENERATING FREQUENCY ABOVE 50.1 Hz BACKING OF GENERATING FREQUENCY ABOVE 50.1 Hz FREE GOVERNOR MODE OF OPERATOION FREE GOVERNOR MODE OF OPERATOION On the question of over voltage in the grid it was mentioned that such high voltages are observed during off peak night hours while during other periods the voltages are in normal range. Further, due to improvement in over all voltages there has been a substantial reduction in system losses. On the question of over voltage in the grid it was mentioned that such high voltages are observed during off peak night hours while during other periods the voltages are in normal range. Further, due to improvement in over all voltages there has been a substantial reduction in system losses.

4.0 TRANSFER OF ASSETS OF SIRSI – GUTTUR 400 kV D/C LINE TCC advised KPTCL to make presentation of alternate proposals regarding lease transfer/premature settlement of lease and transfer of ownership to POWERGRID. TCC advised KPTCL to make presentation of alternate proposals regarding lease transfer/premature settlement of lease and transfer of ownership to POWERGRID.

kV Madurai – Trivandrum Line POWERGRID stated that construction of 400 kV Madurai –Trivandrum line is complete except for 450 Mts portion in TamilNadu reserve forest. Matter is being pursued with PCCF of Tamilnadu for approval of Tamilnadu Govt to file petition in Supreme court for lifting ban on tree cutting and route the line. POWERGRID stated that construction of 400 kV Madurai –Trivandrum line is complete except for 450 Mts portion in TamilNadu reserve forest. Matter is being pursued with PCCF of Tamilnadu for approval of Tamilnadu Govt to file petition in Supreme court for lifting ban on tree cutting and route the line.

12. CERTIFICATION OF AVAILABILITY OF SOUTHERN REGION TRANSMISSION SYSTEM OF POWER GRID i) Outages of existing transmission elements for completion & commissioning of new evacuation schemes /system strengthening schemes POWERGRID submitted that outages as mentioned above which are due to implementation of approved schemes should be treated as “deemed available”. In this regard attention of the constituents were drawn to NREB & EREB board decisions to treat the same as “deemed available”. Further constituents in WR & NER are also certifying these outages as “deemed available”. POWERGRID submitted that outages as mentioned above which are due to implementation of approved schemes should be treated as “deemed available”. In this regard attention of the constituents were drawn to NREB & EREB board decisions to treat the same as “deemed available”. Further constituents in WR & NER are also certifying these outages as “deemed available”. SEB’s (KPTCL,KSEB) stated that the procedures approved by CERC for calculation of transmission system availability do not include the above outages under “deemed availability”. It was decided the matter will be deliberated in the SREB board. SEB’s (KPTCL,KSEB) stated that the procedures approved by CERC for calculation of transmission system availability do not include the above outages under “deemed availability”. It was decided the matter will be deliberated in the SREB board.

12. (ii) OUTAGES ON ACCOUNT OF TESTING OF TALCHER – KOLAR HVDC SYSTEM TCC has decided to recommend to treat these outages as “deemed available” for consideration of the board. TCC has decided to recommend to treat these outages as “deemed available” for consideration of the board.

15. SPARE CONVERTER TRANSFORMER AT VISAKHAPATNAM (GAZUWAKA) HVDC STATION FOR EXECUTION BY POWERGRID TCC has decided to recommend the matter to for favorable consideration and approval of the board. TCC has decided to recommend the matter to for favorable consideration and approval of the board.

17. OPERATION OF TALCHER – KOLAR HVDC TRANSMISSION SYSTEM IN GROUND RETURN MODE TCC has suggested that POWERGRID should conduct further studies to improve the power flow upto rated capacity(1200 MW) in GRM and for that that the possibility of providing another earthing station be explored by POWERGRID. TCC has suggested that POWERGRID should conduct further studies to improve the power flow upto rated capacity(1200 MW) in GRM and for that that the possibility of providing another earthing station be explored by POWERGRID. KPTCL insisted that the power flow on GRM be restricted to 150 MW till such time. KPTCL insisted that the power flow on GRM be restricted to 150 MW till such time.

18. COMMERCIAL OPERATION OF 400 kV HYDERABAD-KARNOOL – GOOTY AND GOOTY-NELAMANGALA LINE ALONG WITH FIXED SERIES COMPENTATION POWERGRID stated that as NTPC Unit 7 has been declared under commercial operation, the associated transmission evacuation system be declared commercial. AGM SRLDC also made a presentation depicting the advantages of hyderabad-karnool – gooty and gooty - nelamangala 400 kV transmission system by way of reduction of system losses and increased grid security and stability. POWERGRID stated that as NTPC Unit 7 has been declared under commercial operation, the associated transmission evacuation system be declared commercial. AGM SRLDC also made a presentation depicting the advantages of hyderabad-karnool – gooty and gooty - nelamangala 400 kV transmission system by way of reduction of system losses and increased grid security and stability.