Mid Term Review Meeting, 26 September 2012J. MONTAÑO1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.

Slides:



Advertisements
Similar presentations
Radiation tests in Padova
Advertisements

08/06/2009: HIAT09 Mattia Manzolaro, SPES Target Group 1/30 The SPES Project: research and development for the multi-foil direct target M. Manzolaro 1,3,
September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
Research Training Opportunities at CERN Paula Eerola Helsinki Institute of Physics and Dept of Physics
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
Mid Term Review Meeting, 26 September 2012S. GIRON1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Michał Bochenek Work Package 3: On-Detector Power.
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
Cross section measurements at LNL M.Mezzetto (INFN-Pd) on behalf of INFN-LNL: M. Cinausero, G. De Angelis,G. Prete.
Target conceptual design WP6, ESR9 CATHI Marie Curie Initial Training Network Cryogenics, Accelerators and Targets at HIE-ISOLDE Serena Cimmino – Stefano.
HIE-ISOLDE contribution packages M. Pasini BE/RF.
Final Review Meeting, September * Research project supported by a Marie Curie Early Initial Training Network of the European Community’s Seventh.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
European design study on Neutrinofacilities - Euronu within FP7.
Mid Term Review Meeting, 26 September 2012P. FARANTATOS1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
TALENT Status and Future 16/07/14H.Pernegger, M.Capeans1.
Mid Term Review Meeting, 26 September 2012E.Zografos1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE End of Project 15 TH SEPTEMBER 2012 This research project has been supported by a Marie.
Status of The HIE-ISOLDE Design Study Richard Catherall EN-STI ISCC Meeting 30 th October 2012 CERN.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
1 Francis Perez WP4 Cryogenic Beam Vacuum System Conception EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Cryo Beam Vacuum Objectives,
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
Mid Term Review Meeting, 26 September 2012N. SURNAME1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
CATHI Final Review Meeting, September 2014E.Zografos1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
The HIE-ISOLDE Faraday Cup
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement WP8 – Improvement and.
HIE-ISOLDE Design Study Richard Catherall EN-STI-RBS ISOLDE Workshop and Users Meeting th – 27 th November 2013.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
High Resolution Separator
Overview of new high level software applications developed for the HIE- ISOLDE superconducting linac D.Lanaia*, M.A. Fraser, D. Voulot *The research project.
SUMMARY JUAS 2013 Joint Universities Accelerator School CERN / LHC / L. Taylor Simulations Higgs boson July 2012.
Mid Term Review Meeting, 26 September 2012M.AUGUSTIN1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
Status of the Design Study Richard Catherall EN-STI-RBS.
REXTRAP plans for 2005 And future developments Pierre for the REX TEAM, REX’s day, 11/03/2005.
WELCOME TO JUAS 2016 Louis Rinolfi, Director Joint Universities Accelerator School CERN / LHC / L. Taylor Monday 15 th February 2016 Course 2: Technology.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2, ADS, linacs,
Mid Term Review Meeting, 26 September * Research project supported by a Marie Curie Early Initial Training Network of the European Community’s Seventh.
The HIE-ISOLDE Design Study Richard Catherall ISOLDE Technical Coordinator CATHI Final Review Meeting Marina H10 Hotel, Barcelona 22 nd – 26 th September.
Mid Term Review Meeting, 26 September 2012A. Shornikov 1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
WP5 1 year activity report Niko Neufeld CERN/PH. WP5 (people)  6 ESRs working in ALICE, ATLAS, CMS and LHCb  Adriana Telesca  Luca Magnoni, Dan Octavian.
ESS The INFN in-kind contribution to the accelerator of the European Spallation Source.
HIE-ISOLDE Design Study Safety and Beam Quality Challenges for the HIE-ISOLDE Frontend Jacobo Montaño (EN/STI/RBS) HIE-ISOLDE Workshop, November 2013 *
Mid Term Review Meeting, 26 September * This research project has been supported by a Marie Curie Early Initial Training Network Fellowship of the.
NATIONAL INSTITUTE OF NUCLEAR PHYSICS Legnaro National Laboratories Numerical simulation strategy for the SPES FEBIAD ion source INFN – CISAS collaboration.
PS-ESS and LEBT State of the art Lorenzo Neri Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud.
Presentation JUAS Louis Rinolfi Director Lund, August 2015.
A. FaccoEURISOL DS Orsay, 3 Feb 2005 Task 7 Proton Accelerator “The objective of the Proton Accelerator Task is the design a 5 mA CW, 1 GeV proton linac.
A. Andrighetto 1, S. Corradetti 1,2, M. Manzolaro 1, L.A.C. Piazza 1, G. Prete 1, D. Scarpa 1,A.Tomaselli 3 J.A. Vasquez 1 SPES Laser Activities IPAC ‘12.
CONFIDENTIAL MATERIAL Michele Togno - II Annual ARDENT Meeting, Milan – October, 14 th D Ionization Chambers Array for Clinical Applications.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
HIE-ISOLDE Workshop: The Technical Aspects Target Area Infrastructure Ventilation 29 November 2013 Andrea Polato* - CERN EN-CV-PJ * The research project.
WU2 - Proton Source & LEBT Schedule 2013 L. Celona Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud.
M. Manzolaro 1,b), M. Manente 2, D. Curreli 3, J. Vasquez 1, J. Montano 1, A. Andrighetto 1, G. Meneghetti 3, D. Pavarin 2,3, D. Scarpa 1, M. Rossignoli.
WP1: Superconducting Cavity Developments and Tests Walter Venturini Delsolaro Mid Term Review Meeting, 26 September 2012 CATHI Marie Curie Initial Training.
P1 – GANIL P2 – CNRS/IN2P3 P3 – INFN P4 – CERN P6 – CEA Saclay P7 – NIPNE Bucarest P18 – PSI Switzerland P19 – IPUL Latvia C2 – BINP Novosibirsk C3 – VNIITF.
ColMat Welcome and Task 1 Ralph W. Aβmann Kick off Meeting of EuCARD/ColMat CERN – June 17 th, Jun 09 1R. Assmann.
Design of a General Purpose I/O Controller for Particle Accelerators
Status of The HIE-ISOLDE Design Study
WP8 – Improvement and equipment of irradiation beam lines
M.Jonker CTC MPO-WG status
HIE-ISOLDE Project: Planning & Resources
Report on HIE-ISOLDE Status
CERN’s MidTermPlan and the consequences for HIE-ISOLDE
CLIC damping rings working plan towards the CDR
High Energy High Intensity Hadron Beams
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
Presentation transcript:

Mid Term Review Meeting, 26 September 2012J. MONTAÑO1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship of the European Community’s Seventh Programme under contract number (PITN-GA CATHI) CATHI Marie Curie Initial Training Network Cryogenics, Accelerators and Targets at HIE-ISOLDE JACOBO ABRAHAM MONTAÑO CARRIZALES (EN/STI/RBS)* WP6, ESR 11 Supervisor: TIM GILES Mid Term Review Meeting, 26 September 2012

Mid Term Review Meeting, 26 September 2012J. MONTAÑO2 Outline  Background;  Training;  Activities at CERN;  Project Status and Achievement;  Future work;  Conclusions

Mid Term Review Meeting, 26 September 2012J. MONTAÑO3 Background  Master degree in Mechanical Engineering at “Universidad Simón Bolívar”. Caracas, Venezuela.  MSc in Power Generation and Oil Production at “Universidad Simón Bolívar”. Caracas, Venezuela.  Fellowship at INFN – LNL (Istituto Nazionale di Fisica Nucleare – Laboratori Nazionali di Legnaro). Padua, Italy.  Measurement of thermal conductivity of material at high temperatures in high vacuum  Design and construction of an emittance meter for SPES  Simulation and tests for characterization of the SPES Front End

Mid Term Review Meeting, 26 September 2012J. MONTAÑO4 Training  SPES School. LNS (Laboratori Nazionali del Sud) Catania, Italy. Nov  “Radiological protection” course at CERN.  JUAS 2012 (Joint Universities Accelerator School). Archamps, France. Jan – Mar  Visit to ESRF (European Synchrotron Radiation Facility). Grenoble, France.  Visit to CMS detector, ATLAS detector, CLIC and LINAC 2 at CERN.  Visit to PSI laboratories. Villigen, Switzerland.  Visit to Hôpitaux Universitaires de Genève. Geneva, Switzerland.  Full day of specialized training in vacuum technology at CERN.

Mid Term Review Meeting, 26 September 2012J. MONTAÑO5 Training  “Habilitation électrique pour personnel électricien en basse tension” course at CERN.  “CATIA-Smarteam Basics” course at CERN.  “CERN Accelerator School” (CAS – Ion Sources). Senec, Slovakia. Jun  “Project engineering” course at CERN.  “EURORIB” conference. Padua, Italy. May  Visit to LNL laboratories.  “Français I” course at CERN.

Mid Term Review Meeting, 26 September 2012J. MONTAÑO6 Activities at CERN Description of work WP6: Studies for ISOL, Target and Front End Upgrades  ESR11:  Beam extraction optics  Conceptual and functional upgrade of the Front End design

Mid Term Review Meeting, 26 September 2012J. MONTAÑO7 Activities at CERN  Off-line mass separator layout  Tests of breakdown in radiation  Redesign of ion extraction system

Mid Term Review Meeting, 26 September 2012J. MONTAÑO8 Activities at CERN Off-line 2 mass separator layout FE FE + RFQ FE + RFQ + 90° magnet FE + WF + RFQ + 90° magnet

Mid Term Review Meeting, 26 September 2012J. MONTAÑO9 Activities at CERN Redesign of extraction system Current system with single electrode of adjustable position

Mid Term Review Meeting, 26 September 2012J. MONTAÑO10 Activities at CERN Redesign of extraction system Fixed electrodes, larger apertures, simpler and more compact frame

Mid Term Review Meeting, 26 September 2012J. MONTAÑO11 Activities at CERN Redesign of extraction system Two electrodes prototype with fixed electrodes (isolated valve)

Mid Term Review Meeting, 26 September 2012J. MONTAÑO12 Activities at CERN Breakdown tests in radiation  Important parameter for the FE upgrade  Few information available  ISOLDE is an ideal place to study this phenomenon and this is the opportunity  Next October 8 th a new target unit will have incorporated a small setup for testing the breakdown with the proton beam shooting the target

Mid Term Review Meeting, 26 September 2012J. MONTAÑO13 Activities at CERN Activities with other work packages WP2, ER2 and ESR3. Collaboration in electrostatic and particle tracking simulations WP6, ESR9. Coupling of the target chamber; thermal simulations WP7, ESR14. Fully study of the Front End vacuum aspects WP8, ESR15 and ESR16. Commissioning of the off- line separator WP6, ESR11

Mid Term Review Meeting, 26 September 2012J. MONTAÑO14 Project Status and Achievement  Timetable. Milestones and deliverables Trainings Problem definitions Conceptual, functional and structural design Preliminary experimental studies

Mid Term Review Meeting, 26 September 2012J. MONTAÑO15 Future Work  Assembly of the FE 9 and conditioning of the Off- line 2 lab  Characterization of the different extraction systems. Comparison of performances and validation of simulations  Upgrade of coupling system  Vacuum improvements (M. Hermann)  Poster session for EMIS conference. Abstract submitted.

Mid Term Review Meeting, 26 September 2012J. MONTAÑO16 Conclusions  Intense initial training has been performed during the first year.  Works for the new off-line laboratory are in progress.  New prototype of the extraction system will be tested soon.  The collaborations with other tasks are effective and guarantee the compatibility of the work packages.