NCSX M. Cole, P. Fogarty, K. Freudenberg, T. Hargrove, G. Jones, G. Lovett, B. Nelson, D. Williamson April 27, 2005 Modular Coil Type-C Final Design Review.

Slides:



Advertisements
Similar presentations
Archiving NCSX Construction Information Using the PPPL Windows Based Server.
Advertisements

Summary of Twisted Racetrack / Clamp Analysis K. D. Freudenberg.
Summary of the end part design process using BEND R. Bossert February 14, 2013.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
NCSX Vacuum Vessel Overview Paul Goranson WBS 12 Manager Vacuum Vessel Manufacturing Study Kickoff meeting April 29, 2003.
NCSX NCSX Planar Coil "ASIPP" Presentation 1 December 8-10, 2005 Michael Kalish NCSX TF and PF Coils.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Coil Cooling Workshop Summary June 10, Electrical Isolation: Cladding is isolated from the T by Kapton. The chill plates electrically connect at.
September 30, 2003 NCSX Modular Coil Winding Form Prototype FDR1 NCSX Prototype Modular Coil Winding form FDR Phil Heitzenroeder PPPL September 30, 2003.
SC Project Review of NCSX, April 8-10, 2008 NSCX Poloidal Field Coils Michael Kalish.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
1 Dimensional Control for the National Compact Stellarator Experiment R. Ellis, A. Brooks, T. Brown, W. Reiersen, S. Raftopoulos, B. Stratton Presented.
1 NCSX Modular coil winding pack To shim or not to shim? NCSX WBS 1 Engineering Meeting July 7, 2004 What is requirement? What is baseline winding pack.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
Modular Coil Electrical Joint1 NCSX Peer Review Modular Coil Electrical Joint James Chrzanowski April 24, 2006.
1 WBS 1 Design Analysis Status NCSX Analysis Meeting Dec 3, 2003.
2-d Insulation Analysis of Clamp / Vacuum Vessel Insulation crushing
Presented by Brad Nelson Tom Brown, Mike Cole, Paul Fogarty, Paul Goranson, Phil Heitzenroeder, Wayne Reiersen, Dave Williamson, and others NCSX PAC Meeting.
Modular Coil Assembly Bolted Joint PDR 2/22/07. Objectives The review objectives include... Define the location of additional inboard bolts Finalize the.
J.H. ChrzanowskiMod Coil R&D Update1 Modular Coil R&D Update April 9, 2003 James H. Chrzanowski.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
NCSX A. Brooks, P. Fogarty, G. Lovett, D. Williamson June 3, 2005 Modular Coil Type-C Final Design Review – Part II.
NCSX VACUUM VESSEL PL Goranson Thermal Insulation Final Design Review July 31, 2006 WBS12 NCSX.
Metrology Milestones Metrology Task Force –Vacuum vessel manufacture - P. Goranson –Mod. Coil Form manufacture - D. Williamson –Mod. Coil winding- S. Raftopoulos.
NCSX NCSX TF Coil Procurement 1 February 3, 2006 Michael Kalish NCSX TF Coil Procurement.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Low Energy RHIC e - Cooling Meeting Minutes – 11/19/14 1. Cooling Section Magnets and Power Supplies –Most of power supplies will be from ERL (R. Lambiase).
Summary of Winding Pack Thermal Results K. Freudenberg
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
Thermocouples Isolated Omega Type-E T/C as used on vessel, ~$30 ea In-house signal conditioning equipment Instrument one 3-coil set: Winding pack near.
Cold Magnetic Shield Update
NCSX VACUUM VESSEL HEATING/COOLING PL Goranson Preliminary Results February 17, 2006 MDL Testing of Coolant Tracing NCSX.
NCSX David Johnson August 18, 2004 Discussion of Co-Wound Flux Loops.
F. Dahlgren -SC Project Review of NCSX, April 8-10, 2008 PF, TF, & Trim Coil Supports (WBS-15) Core Base Support Structure (WBS-17) F. Dahlgren NCSX Coil.
NCSX B. Nelson for the NCSX Engineering Team NCSX modular coil cooling workshop June 10-11, 2004 PPPL NCSX Modular Coil Cooling Requirements and Initial.
NCSX NCSX Trim Coil Peer Review 11/6/07 1 Tom Brown Art Brooks Raki Ramakrishnan Mike Kalish NCSX Trim Coil Peer Review.
NCSX NCSX Project Meeting Wayne Reiersen 15 December 2004.
J.H. ChrzanowskiMod Coil R&D Update1 Modular Coil R&D Update April 2, 2003 James H. Chrzanowski.
1 Modular Coil Winding Keystoning Issues NCSX Technical Meeting May 29, 2003 What is the current baseline winding? What is the problem? What are the variables.
NCSX P. Fogarty, K. Freudenberg, T. Hargrove, G. Lovett, B. Nelson, P. Goranson, D. Williamson October 15, 2004 Twisted Racetrack Coil Final Design Review.
June 10, 2004Modular Coil Winding & Cooling WorkshopJ.H. Chrzanowski 1 Modular Coil Cooling Issues With Baseline & Status of Cooling R&D James H. Chrzanowski.
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
AWB Dimensional Control Requirements for the Modular Coils and TF coils Field Period Assembly Peer Review October 11-12, 2006 Art Brooks.
NCSX VACUUM VESSEL PL Goranson Final Design Review November 17, 2005 Man Access Port /Lateral Supports NCSX.
Dan Cheng, Helene Felice 4/8/2015 MQXFS-D Build-up LBNL “Lessons Learned”
Field Period Assembly Wayne Reiersen SC Project Review PPPL May 2006.
1 FPA Stage 2 Peer Review May 12, 2006 T. Brown. 2 FPA Stage 2 Status Summary of Stage 2 activities Review current design status Review schedule details.
12/2/04Module 2C1 The NCSX Engineering Web – An Overview Part III Design Data, Fabrication, Assembly, and Installation Plans.
NCSX 21 March 2003 Reiersen - 1 PDR Preparations Wayne Reiersen NCSX Engineering Meeting 21 March 2003.
NCSX NCSX TF Coil Conductor FDR 5/17/05 1 Michael Kalish NCSX TF Conductor.
Twisted Racetrack Revisited Model Changes: Side A has 10 turns Clamps have been modified to as built geometry. Property Changes (linear results.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
NCSX VACUUM VESSEL HEATING/COOLING PL Goranson Final Design Review April 4, 2006 Coolant Hose Assemblies and Thermo- hydraulics NCSX.
SEPT 20, 2006 T. Brown, M. Cole, P. Fogarty, P. Goranson, K. Freudenberg, D. Williamson NCSX STAGE 2 COIL TO COIL ASSY.
NCSX VVSA / MCWF FDR A Systems Engineering Perspective Wayne Reiersen Bob Simmons NCSX VVSA / MCWF FDR May 19-20, 2004 PPPL.
Stellarator Core Machine Configuration NCSX Project Meeting Dec 19-20, 2000 B. Nelson, M. Cole, P. Fogarty P. Goranson, G. Jones, D. Williamson O AK R.
1 WBS 1 Preparation for FDRs NCSX WBS 1 Engineering Meeting March 17, 2003 What establishes the plan? What are near term deliverables? How will we status.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
1 NCSX VV Assembly Joint Issue B. Nelson 17 Mar 2005.
Review of Modular Coil Winding Pack Configuration David Williamson March 19, 2004.
1 Testing of Twisted Racetrack Coil B. Nelson TRC FDR 15 Oct 2004.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
LARP Phase II Secondary Collimator RC1
HB RM prototypes Ianos Schmidt Aug 17, 2017.
LARP Phase II Secondary Collimator RC-1
SNS PPU Cryomodule Thermal Shield
SNS PPU Cryomodule Thermal Shield & MLI
Presentation transcript:

NCSX M. Cole, P. Fogarty, K. Freudenberg, T. Hargrove, G. Jones, G. Lovett, B. Nelson, D. Williamson April 27, 2005 Modular Coil Type-C Final Design Review – Part I

NCSX 2 Charge Questions Is the C1 cladding ready for fabrication at PPPL? What is procurement plan for C2-C6, A, B? How is fabrication data managed (in-house vs supplier)? What issues remain for Type-C? How to solve? What is status/schedule for SRD, DACs, etc?

NCSX 3 MCWF C1 to be completed by 6/24

NCSX 4 MCWF C1 machining (cont’d)

NCSX 5 MCWF C1 machining (cont’d)

NCSX 6 MCWF mods address coil winding

NCSX 7 Winding form prep Drawing SE establishes layout of studs, hole numbering scheme Based on Lawton model with machining features added Stud length increased to 2-in

NCSX 8 C1 cladding incorporates TRC input Increase part spacing to.125-in, tab gap =.060-in (done) Make min tab width >.2-in (not completely addressed) Increase tab length, trim at assembly (chill plates) Form main body to tee/wp, bend tabs individually Notch parts for identification, alignment (not done) Add sprue cutouts to flat pattern (not done) Number parts according to hole position (not done) Replace cladding with strips in tight bends Reduce number of slits (not completely addressed) Reduce radius of clamp cutout (done) Modify staking tools and procedure

NCSX 9 C1 cladding flat patterns Approx 5 patterns per drawing, 156 drawings total (promoted to fab 4/20) Two layers, cut outline and “etch” layer for part number, bend lines

NCSX 10 Flat patterns done, asm drawings not TRC style, cladding in groups Alternate drawing, organized by clamp no.

NCSX 11 Schedule for remaining cladding/chill plates Fabrication drawings: Type-C cladding flat patterns Apr-20, need parts by Jun-13 (receive C1) Type-C chill plate flat patterns May-18, need by Sep-8 (start of chill plate asm) Type-A cladding and chill plate flat patterns Jul-6, need by Nov-8 (receive A1) Type-B cladding and chill plate flat patterns Aug-31, need by Apr-2006 (receive B1)

NCSX 12 Plans for procurement package Coil C1 cladding and chill plates to be fabricated by PPPL Coils C2-C6, A1-A6, B1-B6 cladding and chill plates to be procured via fixed price subcontract: –Draft C-Spec, SOW Jul-1 –Modified Type-C DXF (based on C1 experience) Jul-30 –List of potential vendors Jul-30 –RFP on street Aug-5 –A, B cladding, chill plate DXF files complete Sep-1

NCSX 13 Organization of dwg packages C1 patterns (DXF) have been transmitted as.ZIP file to PPPL shops TRC models had problems with dropped lines, should try.DWG format All files (in-house, supplier) to be stored on manufacturing FTP site –Drawings / DXF files will be posted on website –Only the current documents on website will be certified for fab. –All files and hardcopies must come from website and must be checked for possible updates prior to fabrication Bob Simmons has included this process in procedures Tom Brown will announce availability/changes as is done for MCWF

NCSX 14 Chill plates, lead blocks, terminal are remaining issues Chill plate drawings - Is there a faster method to produce them? Lead block design - Difficult geometry, need complete set of parts at start Jumper mounting block - Reduce height to maintain clearance TRC as-built lead blocks assembled to MCWF C1

NCSX 15 Lead block asm End View SE142C-020.ASM shows TRC lead blocks assembled to MCWF C1 Working on addition of mounting bosses to back of straight blocks, contour of finger blocks to fit complex winding pack shape Main issue: lead block design is difficult to adapt to twisted, curved coils without major modifications, and will still retain bad features (tight curvature, keystoning) associated with TRC design Plan View

NCSX 16 Lead block modifications Revise lead geometry slightly to: –Increase bend radii more than factor of two –Decrease linear extent of lead region to minimize effects of curvature and twist in winding pack –Reduce field errors by reducing current loop areas Schedule impact minimized by making stereolithography models of all parts for fit check prior to receipt of actual parts May require slight tweak to lead slot openings in winding form

NCSX 17 Plan to complete lead blocks Order long lead G11-CR blank material Develop models, evaluate current filaments for field errors Create STL model of lead block asm to check fitup of actual parts Revise/issue part drawings in order of need for C1 Pre-fit parts with STL assembly before use on coil

NCSX 18 Terminal block height must be reduced Offset height of 1-in gives.25-in clearance with TF coil, but limits space to manipulate insulated cable Options: –Pre-bend cable prior to brazing on termination - need R&D using split chill block with formed shape –Insulate cable after bending –Relieve TF structure to reduce interference Chill block modified for cond pre-bend Asm w/ 2-in offset

NCSX 19 Status of design documentation SRD has been issued for final comments Comments will be incorporated and SRD signed prior to final Type-C FDR in May No substantial changes have occurred since November draft All other documentation has been issued as draft, except for the coil assembly specification (TRC spec not a good example) Analysis updates are needed –Material properties from beam tests, tensile tests, and transverse compression tests –Update of allowable stress values –Re-run non-linear analysis of TRC, compare test results to analysis for benchmark –Re-run non-linear analysis of all coil types with correct properties, compare to allowable stresses

NCSX 20 Conclusion Is the C1 cladding ready for fabrication at PPPL? –DXF files are released, asm drawings in progress –Modifications can be made later for small no. of parts What is procurement plan for C2-C6, A, B? –Type-C, -A flat patterns ready to order in Jul, Type-B in Sep How is fabrication data managed (in-house vs supplier)? –FTP site to manage all packages and revisions What issues remain for Type-C? How to solve? –Quantify min bend, adjust design to coil shapes What is status/schedule for SRD, DACs, etc? –SRD approval is imminent, CSPEC and ICDs lagging, analysis needs update to match config, material test results

NCSX 21 Backup Slides

NCSX 22 Winding Pack Thermal Analysis Temperature dependent heat generation (see next slide) Crimp conductivity set to 100 W/m-K Groundwrap overlap is reduced from 2X to 1.3X. Copper thickness is 0.04 in. Pulse shot is still 2T, high beta, 10,390 Amps/cable. Cool down time is still 15 minutes. K. Freudenberg

NCSX 23 First Cycle Immediately after pulse T = 15 minutes (after cool down)

NCSX 24 Ten Cycles Tee Temp Winding Temp

NCSX 25 Temperatures during the 10 th shot Temperature after the 10 th shot Temperature after the 10 th cool down

NCSX 26 After 10 th cycle (winding and tee isolated)