Chapter 7 Schedule Control. 22 Learning Objectives  Perform the steps in the project control process  Determine the effects of actual schedule performance.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

Developing the Schedule
Developing the Schedule
Chapter 7 Project Management
TK3333 Software Management Topic 7: Schedule Control.
Chapter 7 Schedule Control
3-1 © Prentice Hall, 2004 Chapter 3: Managing the Object-Oriented Information Systems Project Object-Oriented Systems Analysis and Design Joey F. George,
Scheduling
Advanced Project Management - CPH
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Chapter 9: Reducing Project Duration
Reducing Project Duration
Copyright 2008 Introduction to Project Management, Second Edition 1  Project time management involves the processes required to ensure timely completion.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 2 Key CPM Scheduling Terms.
Importance of Project Schedules
Project Management Techniques.
Jeopardy Game! Scope Management Time Management Integration Management.
Reducing Project Duration
What is Project Cost Management?
OPER 576 Project Management Reducing Project Duration or Project Crashing Greg Magnan, Ph.D. May 20, 2004.
Determining Costs, Budget, and Earned Value
Chapter 9 Cost Planning and Performance
Operations Management Contemporary Concepts and Cases Chapter Fourteen Project Planning and Scheduling Copyright © 2011 by The McGraw-Hill Companies,
HIT241 - TIME MANAGEMENT Introduction
Time Management Week 7 - Learning Objectives You should be able to: n List and describe the processes, activities, inputs, and outputs in time management.
Chapter 4 The Project. 2 Learning Objectives Third phase starts after a contract is drawn up and ends when the project objective is accomplished; final.
Real-World Project Management Chapter 13. Characteristics of Project Management Unique one-time focus –Difficulties arise from originality Subject to.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Recap from last week Understand organizations, including the four frames, organizational structures. Explain why stakeholder management and top management.
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
Time/Cost Trade-off Analysis
Chapter 9: Reducing Project Duration
Network Planning Techniques Program Evaluation & Review Technique (PERT): Developed to manage the Polaris missile project Many tasks pushed the boundaries.
Project Management Part 6 Project Control. Part 6 - Project Control2 Topic Outline: Project Control Project control steps Measuring and monitoring system.
1IT Project Management, Third Edition Chapter 6 Chapter 6: Project Time Management.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Reducing Project Duration CHAPTER NINE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Reducing Project Duration CHAPTER NINE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 9 Cost Planning and Performance. 222 Learning Objectives Items to consider when estimating cost Preparing a baseline budget Cumulating actual.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
Project Time Management
Fundamentals of Project Control Chapter 11 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Chapter 7 Schedule Control
Reducing Project Duration
Chapter 16 – Project Management
Project Management.
Chapter 9 Cost Planning and Performance
Project Management Chapter Topics
Project Planning & Scheduling
Reducing Project Duration
Project Planning & Scheduling
Chapter 6: Project Time Management
CHAPTER 6 PROJECT TIME MANAGEMENT
Project Management Planning Models
Prepared by Lee Revere and John Large
Critical Path Method Farrokh Alemi, Ph.D.
What is Project Cost Management?
Chapter 7 Schedule Control
CHAPTER 6 PROJECT TIME MANAGEMENT
Chapter 9 Cost Planning and Performance
Presentation transcript:

Chapter 7 Schedule Control

22 Learning Objectives  Perform the steps in the project control process  Determine the effects of actual schedule performance on the project schedule  Incorporate project changes into the schedule  Calculate an updated project schedule  Control the project schedule

33 Real World Example Vignette: A Fish Tale Building an aquarium typically takes about seven years to complete. Bernie Marcus, co-founder of The Home Depot chain, decided he wanted to build one in half the time in Atlanta, Georgia. The Georgia Aquarium was completed for $290 million in less than three years and eight months. Contracts were established with each company to ensure activities were in sync with one another. All fees for all companies were retained unless all projects were finished on time, which fostered a stronger collective project team. The aquarium opened in November 2005, and as of early 2007 had already welcomed more than 3.6 million visitors.

4 Real World Example Vignette: The Eaton Hotel Project The Eaton Hotel project, the largest private historic rehabilitation project in Kansas history, was to be completed by Dec. 22, Project was to cost a total of $15.4 million, with construction costs of about $12 million, and had to be completed by Dec. 31, Key Construction was selected to renovate the hotel’s historic, and badly deteriorated, building. They spent most of their time throughout the duration of the project on ‘‘ongoing value engineering,’’ An agreement was signed that city officials and key people would work together as a team. Key Construction didn’t request any unnecessary change orders that would slow work and drive up costs. The project was an overwhelming success: finished 9 days early within budget.

5 Project Control Process The key to effective project control is to measure actual progress and compare it to planned progress on a timely and regular basis and to take required corrective action immediately. Establish a regular reporting period. During each reporting period, collect: data on actual performance information on any changes to project scope, schedule and budget. Changes mean a new plan must be established.

Project Control Process (contd) Once an updated schedule and budget have been calculated, they need to be compared to the baseline schedule and budget and analyzed for variances. Corrective actions maybe necessary. The project control process continues throughout the project. 6

7

8 Effects of Actual Schedule Performance Actual finish times (AFT) of completed activities will determine the earliest start and earliest finish times for the remaining activities.

9

10 Incorporating Project Changes into the Schedule Changes might be initiated by the customer or the project team, or they might be the result of an unanticipated occurrence. The degree of impact may depend on when the changes are requested. When the customer requests a change, additional costs might need to be charged.

Incorporating Project Changes into the Schedule (contd) Other reasons for changes: Oversight when the original plan was developed. Unanticipated occurrences. Adding more detail to the network. Any type of change will require a modification to the plan. 11

12 Updating the Project Schedule An updated project schedule can be calculated based on actual finish times of completed activities

13 Approaches to Schedule Control Four Steps Analyze the schedule Decide what corrective actions should be taken, if any Revise the plan Recalculate the schedule

14 Approaches to Schedule Control (Cont.) A change in the estimated duration of any activity will cause a corresponding change in the slack for that path. When a path of activities has negative slack, focus on:  Activities that are near term.  Activities that have long estimated durations.

15 Reducing the Estimated Durations  Apply more resources.  Assign a person with greater expertise to perform or help with the activity.  Reduce the scope or requirements for an activity.  Totally eliminate some activities.  Increase productivity through improved methods or technology.

16 Approaches to Schedule Control (Cont.) Reducing durations of activities usually results in an increase in costs or a reduction in scope. The key is to effectively address paths with negative or deteriorating slack values as soon as they are identified. COST SCOPE SCHEDULE

17 Schedule Control for Information Systems Development Common necessary changes during IS development projects:  Changes to input screens  Changes to reports  Changes to online queries  Changes to database structures  Changes to software processing routines  Changes to processing speeds  Changes to storage capacities  Changes to business processes  Changes to software resulting from hardware upgrades, or vice-versa

18 Project Management Software The software allows you to perform various control functions. The percent complete for each task can be entered. Changes to the duration estimates can be entered. The software will automatically revise the project schedule and the corresponding network diagrams.

Time-Cost Trade-Off Each activity can have two pairs of duration and cost estimates Normal time and cost Time to complete under normal conditions Cost if done in normal time Crash time and cost Shortest possible length to complete the activity Cost if done in crash time Appendix 19 Appendix (is testable!)

Time-Cost Trade-Off (cont.) Assumptions Activity duration can be shortened by applying more resources with an associated cost Crash time is the shortest possible duration Resources for acceleration are available Relationship between time and cost is linear Crash cost – Normal Cost cost per time period Normal time – Crash time 20

A: Max accel:C: Max accel: Cost/wk: Cost/wk: B: Max accel:D: Max accel: Cost/wk Cost/wk: 21

Time-Cost Trade-Off (cont.) Objective of time-cost trade-off Determine shortest completion time By crashing activities with smallest cost increase Method: Shorten project duration one period at a time Crash only activities on critical path(s) with lowest cost per period increase Until get shortest possible project completion time 22

Reduce by 1 wk CP: Which activity to accelerate: New duration: New cost: Project duration: 18 weeks Project cost: $200,000 $6k/period$10k/period $5k/period $6k/period 23

Reduce by 1 wk CP: Which activity to accelerate: New duration: New cost: Project duration: Project cost: $6k/period$10k/period $5k/period $6k/period N = 9 24

Reduce by 1 wk CP: Which activity to accelerate: New duration: New cost: Project duration: Project cost: $6k/period$10k/period $5k/period $6k/period N = 9 N = 7 25

Reduce by 1 wk CP: Which activity to accelerate: New duration: New cost: Project duration: Project cost: $6k/period$10k/period $5k/period $6k/period N = 9 N = 6 26