Overview of Commercial Existing Building Commissioning and M&V Approaches July 7, 2009 Regional Technical Forum Dave Moser, P.E.

Slides:



Advertisements
Similar presentations
Intro to Enersol What is Retro-commissioning? Define Benefits of Retro-commissioning Define Retro-commissioning Process Discuss Retro-commissioning Findings.
Advertisements

UPDATE ON GROCERSMART 4.0 RESEARCH PLAN Regional Technical Forum May 3, 2011.
PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
Process & Benefits of Monitoring Based Commissioning David Jump, Ph.D., P.E. Principal Quantum Energy Services & Technologies, Inc.
Sustainability and Commissioning for Military Facilities WHAT IT IS AND WHAT IT IS NOT! Dan Jackson, PE, Vice President Tim Whitley, PE, CxA, CCP, LEED.
Smart Devices. Smart Buildings. Smart Business The Potential for DCx Technology Enabled HVAC Operation Scot Duncan, P.E.
T OPPORTUNITIES FOR ENERGY EFFICIENCY AT TRIBAL GAMING FACILITIES.
January 12, 2012 Commissioning Services. June 13, 2011  Genesis Commissioning Capabilities  What is Commissioning (Cx)/Retro-Commissioning (RCx)? 
BPA Guidelines for Measurement & Verification of Energy Efficiency Measures Presented at Brown Bag Session November 29, 2006.
Energy Performance Analysis with RETScreen
+ Impact Evaluations and Measurement and Verification First we will focus on ‘Gross Savings’ Determination - savings determined irrespective of why 1 Kentucky.
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
Energy Efficient Operations Presentation to ASHRAE Energy Expo October 2, 2013 Center for Energy and Environment.
Action-Oriented Benchmarking Paul A. Mathew, Ph.D. Lawrence Berkeley National Laboratory Berkeley California Using CEUS Data to Identify and Prioritize.
Technical And Financial Benefits Of Retro-Commissioning Initiatives Society of American Military Engineers Northern Virginia Post January 6, 2011 Presented.
Benchmarking State Buildings Karen Herter, Heschong-Mahone Group (HMG) Mike Langley, Dept. of General Services (DGS) April 8, 2008.
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
Upstate Energy Expo 2010 NYSERDA Program Overview March 30, 2010 Cheryl Glanton, Project Manager.
Implementing Commissioning and the CxP for DOE Super ESPC Projects Draft Guideline Review Chuck Dorgan, P.E., Ph.D., CxAP Roger Johnson.
DNV GL © 2014 SAFER, SMARTER, GREENER DNV GL © 2014 HVAC_3 Quality Maintenance 1 Research Plan.
Implementer’s Group April 2015 Meeting Debrief and Upcoming Meeting Prep April 24, 2015.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
Methodology for Energy Savings claim for Incentive Programs and Codes & Standards(C&S) accounting Presented by: Armen Saiyan P.E. For the California Technical.
Leveraging an Energy Plan Managing Energy to Reduce Operating Cost and Improve Building Valuation.
The 5 th Annual Conference on Total Building Commissioning 2009 Commissioning Changes in LEED 2009 Paul McCown, PE, CxA, LEED AP, CEM SSRCx, LLC.
Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 COMMISSIONING ??? COMMISSIONING 101.
August 10, 2007 CONTROL YOUR DATA CENTER! Tune your Legacy Data Center to improve overall efficiencies.
Plans to bring Out-of-Compliance UES Measures back into Compliance: 1. Agricultural Irrigation Hardware UES 2. Agricultural Motors UES Regional Technical.
Guidelines for the Development and Maintenance of RTF- Approved Measure Savings Estimates December 7, 2010 Regional Technical Forum Presented by: Michael.
Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,
Phoenix Convention Center Phoenix, Arizona Existing Building Commissioning (EBCx): A Strategy for Improving Your Building Performance Track: Building Performance.
Out-Of-Compliance Grocery UES Measure Recommendations Regional Technical Forum March 18, 2014.
MBCx Projects – Programs, Process, and Results Soda, Tan, Shields and Wurster David Jump, Ph.D., P.E., Matt Denny, P.E. Quantum Energy Services & Technologies,
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
California Commissioning Collaborative Advisory Council Meeting February 7, 2008 © California Commissioning Collaborative.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Anti-Sweat Heater Control Small Saver UES Measure Regional Technical Forum September 17, 2013.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
Overview of Data Center Energy Use Bill Tschudi, LBNL
RTF Custom Protocols: Background, Issues and Critical Elements February 8, 2012 Regional Technical Forum Subcommittee on Impact Evaluation and Custom Protocol.
Implementer’s Group July 2015 RTF Meeting Debrief and Upcoming Meeting Prep July 29, 2015.
Fundamentals of Retro- Commissioning Tom Meyer CSME, GGP, CBCP, QCP, EBCP The ESCO Group.
Electric / Gas / Water MAESTRO Evaluation Showcase July 26-27, 2006 Project Manager: Pierre Landry, SCE Lead Consultants: Mike Rufo, Itron; Keith Rothenburg,
RTF Management Update Jennifer Anziano Regional Technical Forum February 18, 2015.
How to Have a Successful Retrocommissioning Project Karl Stum, PE Portland Energy Conservation Inc. (PECI) Successful Retrocommissioning.
Advanced Lighting Control Systems (ALCS) Energy Estimation Tool Pacific Gas & Electric Company Dave Alexander.
Energy Project M&V: Reports that Add Value October 27, 2015.
Authors: William Tschudi, Lawrence Berkeley National Lab Stephen Fok, Pacific Gas and Electric Company Stephen Fok, Pacific Gas and Electric Company Presented.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Presented by: Todd Amundson, BPA Jane Peters, research into action Ryan Fedie, BPA Update.
Utilities’ Update on Energy Savings Assistance Program Studies Ordered in D LIOB Meeting August 21, 2013 Sacramento, California.
Working Towards Better Savings Estimates for HVAC and Weatherization Measures Regional Technical Forum September 16, 2014.
Energy Efficiency Forum State of California/Investor Owned Utility Partnership Program Date: September 27, Partnership. A Unique Opportunity.
Regional Technical Forum Recommissioning commercial retail facilities: A whole building approach to energy savings April 7th, 2009 Presented by: Jeremy.
Experience you can trust. Californial Industrial Energy Efficiency Potential CALMAC/MAESTRO Meeting San Francisco, CA July 27, 2006 Fred Coito
VRF Applications in PNW RTF RTUG Meeting October 26, 2011 Kevin Campbell Reid Hart, PE Technical Research Group.
REBUILD AMERICA. Why look at the bills? l Bills are the bottom line –they prove the savings!
RTF Management Update Jennifer Anziano Regional Technical Forum July 21, 2015.
Defining the RTF’s Role in Research Jennifer Anziano Regional Technical Forum May 15, 2015.
RTF Management Update Jennifer Anziano Regional Technical Forum March 17, 2015.
Implementer’s Group October 2015 RTF Meeting Debrief and Upcoming Meeting Prep October 29, 2015.
Energy Auditing – Energy Conservation and Efficiency Measures PRESENTER Mr. A. Hamukale BENG, Meng,MBA,PEEIZ,REng.
Prepared For: Prepared By: 100 Montgomery Street, Suite 600 San Francisco, CA Market Street San Francisco, CA The Benefits of Retrocommissioning.
GrocerSmart™ 4.0 RTF Approval of Software and Adherence to RTF Guidelines April 5, 2011.
Demand-side Management (DSM) as a Resource Midwest Energy Policy Conference October 2015 Bill Grant, Deputy Commissioner Division of Energy Resources.
2016 PG&E DATA CENTER BASELINE STUDY Jeff Stein, PE Brandon Gill, PE.
Turning Energy Data into Operations Intelligence Presented to: FMA September 17, 2013.
Achieving Deep Energy Savings in the Grocery Market -A comprehensive approach to retail- Diane Levin November 2, 2010.
Fort Stanwix National Monument Energy Audit Contract
“Improving Operational Efficiency through Commissioning” Recommendations for CCC-sponsored Forums for Building Owners November 19, 2004.
2018 Retro-Commissioning (RCx) Program
Presentation transcript:

Overview of Commercial Existing Building Commissioning and M&V Approaches July 7, 2009 Regional Technical Forum Dave Moser, P.E.

Agenda Topics: Existing building commissioning (EBCx) ◦Brief overview Utility EBCx programs ◦Preliminary results from PECI’s California EBCx programs ◦Results from recent process and impact evaluations M&V Approaches ◦In-program M&V and ex post impact evaluation ◦Formal and informal approaches Persistence ◦Strategies for ensuring persistence of savings ◦EBCx measure life

What is EBCx? A systematic process for investigating, analyzing, and optimizing the performance of building systems through the identification and implementation of Facility Improvement Measures and ensuring their continued performance. The goal of EBCx is to make building systems perform interactively to meet the Current Facility Requirements and provide the tools to support the continuous improvement of system performance over time.

What happened to ‘RCx’? It’s still here. EBCx is a comprehensive term that encompasses the more narrowly focused process variations of: Retrocommissioning (RCx) ◦Buildings that have never been Cx’d / RCx’d Recommissioning (ReCx) ◦Buildings that have been Cx’d / RCx’d in the past Ongoing commissioning (OCx) ◦Systems in place for continual improvement

Why EBCx? Owners don’t typically receive fully functional building systems at initial occupancy Buildings are more complex; systems are becoming increasingly specialized and integrated Current facility use may be dramatically different than original design Source: LBNL, Dec

LBNL Study Summary: EBCx Cost per Sq. Ft.Energy SavingsSimple payback (years) Non-energy Benefits (per sq.ft.) $ % of whole bldg, up to 25% 0.7$0.18 The 2004 study is currently being updated by LBNL. Should be finished by the end of Also covers new building commissioning.

Non-Energy Benefits with EBCx Median value = $0.18 / sf Range = $ $0.45 / sf Significant when compared with the energy savings potential of $ $0.30 / sf

EBCx Process Looks at building as a system Deep analysis during investigation For more info: EPA’s “A Retrocommissioning Guide for Building Owners”.

EBCx Findings: Big Energy Wasters Equipment running more than needed Cooling or heating air or water more than needed Heating and cooling at the same time Moving too much air or water Mostly controls related.

EBCx Results from the Field Note: PECI’s results (not ex post evaluation)

EBCx Results from the Field Highlights: Median annual EBCx project savings of 5% electric energy, 6% gas Slightly lower than expected, perhaps due to: ◦Relatively low investigation incentive of $0.10 / sf Savings are based on provider calcs, not ex post evaluation ◦Impact evaluations are currently underway Top five measures make up 60% of the total kWh savings Airside economizers Scheduling Pump VFDs Fan speed variation ◦Lower duct static setpoint, reset duct static setpoint, etc.

PECI’s CA EBCx programs since 2006 Big goals for RCx. For large commercial buildings (>100k sf). Currently researching ways to make EBCx cost-effective for smaller buildings. SCE SDG&E SMUD PG&E

EBCx Program Results PECI’s 2006-’08 EBCx programs So far, only a process evaluation of the SCE program has been published Other impact evaluations for California EBCx programs are available at calmac.org, including: LA County program (retrofit and EBCx, implementer: LA County) MBCx program (implementer: SCE) BTU program (implementer: QuEST) SDG&E program (implementer: PECI)

EBCx Program Results Impact and process evaluation for PECI’s “ San Diego Gas and Electric Retrocommissioning program” Four buildings in program. Success of program led to CA EBCx programs with more aggressive goals. Summary of ex post savings: 2.0 kWh / sf savings 11.9 kBtu / sf savings 9.4% kBtu whole building energy savings

M&V Approaches to EBCx A summary of the current state of M&V in EBCx: The California Commissioning Collaborative’s “Verification of Savings Project: Existing Methods Report.” Or Prepared by QuEST and PG&E

Highlights from the report Traditionally, EBCx focuses on system performance, M&V focuses on energy savings measurement Can be differing goals Most utility EBCx programs use ‘informal’ in-program savings verification methods ‘Informal’ = approved savings calcs and measure implementation verification. Formal M&V, which may be compliant with IPMVP or ASHRAE, occurs during ex post impact evaluation. ‘In-program’ = during implementation of the program, as opposed to during the ex post evaluation (after the program is finished). Some have attempted to used in-program formal methods MBCx: IPMVP option B (retrofit isolation) or C (whole building) Not completely adherent, though

Informal method: investigation phase EBCx provider / agent identifies measures and calculates savings during the investigation phase Typically ‘custom’ spreadsheet-based savings calcs Based on short term trend data, spot measurements, functional tests May or may not include direct measurement of energy / power Program implementer reviews and approves calcs and supporting documentation (trend data, etc)

Informal method: implementation phase Data types include short term trends, photos, screenshots, functional test forms May or may not include direct measurement of energy / power Program implementer reviews and approves data After implementation, provider collects implementation verification data and submits to utility

Formal M&V during EBCx projects? In-program formal M&V would: Require add’l resources and time May take focus away from other program activities May be impractical in some cases It’s possible, but hasn’t been done on a wide scale yet From IPMVP April 2007.

Ex post evaluations Should be based on formal approaches But aren’t always. For California program evaluations, they strive for adherence to IPMVP, but sometimes fall back to just site visits and reviewing calc methodologies. In CA, the firewall between implementers and evaluators may be a barrier to implementing in-program formal M&V. Little chance of implementers and evaluators working together. Opportunity for in-program M&V in the NW? Or at least better communication between implementers and evaluators?

Continued research on EBCx M&V CCC’s “Verification of Savings” project Create evalulation framework for verification of EBCx project savings Develop guidelines for new and existing methods “Guidelines for Verifying Existing Building Commissioning Project Savings - Using Interval Data Energy Models: IPMVP Options B and C” ◦Already published. May be viable options for EBCx. ◦Jeremy Litow presented on this at a recent RTF meeting, for grocery stores ◦Guidelines will be used on pilot EBCx projects in upcoming PIER research ◦ or

Continued research on EBCx M&V CCC’s “Verification of Savings” project continues Additional guidelines based on both formal and informal methods are currently under development as part of this project ◦IPMVP option A (retrofit: key parameter) ◦IPMVP option B (retrofit: all parameter) ◦IPMVP option D (calibrated simulation) » (maybe) ◦Performance verification with trend data and inspection

Investigation-phase savings calcs SCE process evaluation said, ‘Simplify!’ PECI is currently working with SCE and other stakeholders to develop deemed savings estimates for common EBCx measures Current task: compare deemed savings estimates with custom calculations, for EBCx projects from ’06-’08 SCE program

Investigation-phase savings calcs Some standardized calculation tools are available Some designed for use by an ‘expert’ user Future tools will be developed for use by less experienced users Simplifying calcs would allow providers to spend more of their time in buildings looking for EBCx opportunities Calcs / deemed estimates need to be sufficiently accurate, though

Making Energy Benefits Last Persistence is an issue with EBCx measures Operational measures can more easily be undone than retrofit measures Various methods for ensuring persistence: Owner / operator training (key!) Updated building documentation / systems manuals Performance tracking Building benchmarking Utility bill / energy use tracking (whole building level) Trending of key metrics (systems level) ◦Especially for measures that are least likely to persist

Performance Monitoring Some utility EBCx programs include a performance monitoring component Whole building BC Hydro (NorthWrite tool) MBCx Can also be used for estimating savings Systems-level San Diego Gas & Electric EBCx Program ◦Use either the BAS or an overlay such as ENFORMA or PACRAT

How long do EBCx measures live? Many estimates, little hard research Utility program impact evaluations: SDG&E impact evaluation says, “use a savings declination curve that drops below 100% starting in year one, but that is above 0% beyond eight years.” Bing Tso et al. estimated that for the assumed measure lives and the mix of measures in the Oakland Energy Partners and BTU programs, savings persistence is about 30% at year 10. Other research: PIER “Investigate Commissioning Persistence” found savings from EBCx decreases by 9% per year PG&E assigns a measure life of 3, 5, 8 or 12 years to each EBCx measure type

EBCx measure life Upcoming LBNL study on Cx / EBCx (2009) will address measure life At least will assemble current research / thinking on the topic

Summary EBCx is a proven way to optimize a building’s performance Both energy and non-energy benefits are realized Most in-program M&V for EBCx programs has been light on the M, heavy on the V Have relied on the ex post impact evalulations for the M&V Measure persistence should always be addressed Persistence strategies need to be accepted, understood, and useable by operating staff for success

Questions / Discussion Thank you! Dave Moser, P.E. Senior Engineer