New Starts/Small Starts Program APTA Legislative Conference Washington, DC March 12, 2008.

Slides:



Advertisements
Similar presentations
Interim Guidance on the Application of Travel and Land Use Forecasting in NEPA Statewide Travel Demand Modeling Committee October 14, 2010.
Advertisements

Improvements to Project Development and Program Management of New Starts Projects FY 2008 Proposed Effective April 30, 2006.
Incorporating Investment Decisions in Medium Term and Annual Budgets Robert H. Goldberg Office of Management and Budget Executive Office of the President.
FTA’s Small Starts Program Charlotte, North Carolina October 11, 2007.
Southwest LRT Project Craig Lamothe, AICP Senior Project Manager 2011 MN State Planning Conference September 29, 2011.
Small Starts: Promise Deferred for Streetcars Jeffrey F. Boothe 2099 Pennsylvania Avenue, NW Suite 100 Washington, DC (202)
CONNECT COBB Northwest Transit Corridor Alternatives Analysis Town Center Area Community Improvement District Update March 27, 2012.
Chicago Transit AuthorityJune, 2007 Chicago Transit Authority Regional South Metro Transportation Summit June 16, 2007 Matteson, Illinois.
MAP-21 Performance Management Framework August 8, 2013 Sherry Riklin Bob Tuccillo Angela Dluger The Moving Ahead for Progress in the 21st Century Act (MAP-21)
Simplified Risk Management Planning for A Risk Management Process Overview presentation, which should take about.
Gilbert Road Light Rail Extension Transportation Project Advancement Agreement City Council Study Session December 4, 2014.
Capital Investment Program Listening Session Presented at APTA Annual Meeting -- 10/03/2012 RailVolution /14/
Copyright © 2011 Holland & Knight LLP. All Rights Reserved Capital Investment Grants Proposed Interim Policy Guidance April 15, 2015 Jeffrey F. Boothe.
1 SAFETEA-LU Major Public Transportation Provisions of the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users Federal.
Federal Transit Administration New Starts Project Development Process
Environmental Justice: Policies, Guidance, and Answers to Frequently Asked Questions FTA Region VII Civil Rights Training.
South Corridor Light Rail Project Project Risk Assessment FTA Construction Roundtable May 2004 Presented by Frank Ward, RA/CSI Manager of Construction.
FasTracks Moving Forward: Regional Transportation Plan (RTP) Amendment Staff Recommendation Phillip A. Washington and Team August 7, 2012.
FY2007 New Starts Annual Report & Introduction To Discussions New Starts/Small Starts Listening Session and Seminar San Francisco, CA February 15-16, 2006.
U.S Department of Transportation Federal Highway Administration Federal Transit Administration MAP-21 Moving Ahead with Progress in the 21 st Century Linking.
October Prop K Strategic Plan & 5-Year Prioritization Programs Presentation to the Citizens Advisory Committee October 24, 2007.
National Road Pricing Conference June 4, 2010 Jennifer Tsien, PBS&J Angela Jacobs, Federal Highway Administration.
National Road Pricing Conference June 4, 2010 Mark Burris, Texas Transportation Institute Jessie Yung, Federal Highway Administration.
Large Starts Issues for the Notice of Proposed Rulemaking New Starts/Small Starts Listening Session and Seminar San Francisco, CA February 15-16, 2006.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
New Starts/Small Starts Program APTA Annual Meeting San Diego, CA October 4, 2008.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Water Supply Planning Initiative State Water Commission November 22, 2004.
The FY 2006 New Starts Report Responding to the Demand for Transit.
MAP-21: Impacts to New Starts and Small Starts Senate Transportation Finance and Policy Committee Mark W. Fuhrmann Program Director, New Starts February.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 16, 2009.
AGENDA OPEN HOUSE 6:00 – 8:00 PM  Review materials  Ask questions  Provide feedback on purpose, needs, and alternatives  Sign up for list  Fill.
Technical Assistance Grants to Communities Pipeline Safety Trust Conference New Orleans November 20, 2008 Steve Fischer PHMSA/Office of Pipeline Safety.
1 Transportation Policy and Performance: The challenges and opportunities of performance-based programs Deputy Administrator Therese McMillan Federal Transit.
Transit Revitalization Investment Districts Planning and Implementation of Act 238 of 2004 July 2006 Getting to TRID Lynn Colosi Clear View Strategies.
NPRM Overview, Subpart A and Discussion Items for Comment New/Small Starts Outreach Session Charlotte, NC October 9, 2007 Rich Steinmann Assistant to the.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
SAFETEA-LU Section 6002 “ Efficient Environmental Reviews for Project Decisionmaking”
CEO, Greater Cleveland Regional Transit Authority
New Starts/Small Starts and BRT: An Update APTA Bus Conference Seattle, WA May 5, 2009.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 15, 2009.
PROJECT UPDATE PUBLIC OPEN HOUSE #3 OCTOBER 17 4:30 PM – 6:30 PM Dakota County Northern Service Center.
4733 Bethesda Ave, Suite 600 Bethesda, MD (P) Developing Criteria for Project Programming.
New Starts/Small Starts Workshop APTA’s Legislative Conference March 14, 2007.
Housing Opportunities for Persons With AIDS (HOPWA) 2004 Renewal Competition.
TIFIA Credit Program Overview Updated October 2012 T ransportation I nfrastructure F inance and I nnovation A ct (TIFIA)
Projects of National and Regional Significance Program.
Transportation Conformity Overview H-GAC Conformity Workshop May 30, 2007.
June 9, 2009 VTA 2009 Annual Conference DRPT Annual Update 2009 VTA Conference Chip Badger Agency Director.
IPART’s review of CityRail’s regulatory framework – stakeholder roundtable 31 July 2008.
NEW STARTS/SMALL STARTS. New Starts Eligibility  Based on the results of planning and Alternatives Analysis  At least 50% or more of the total project.
1 New Starts Dialogue Welcome to the FTA Webinar March 21, 2005 Jennifer L. Dorn FTA Administrator.
1 American Recovery and Reinvestment Act of 2009: Challenges Facing the Department of Transportation and the Office of Inspector General’s Strategy for.
Federal Funding Challenges and Opportunities David Vozzolo Vice President National Transit Planning and Project Development.
New Starts/Small Starts Program APTA Rail Conference San Francisco, CA June 5, 2008.
Federal Funding Strategies Update Internal Working Document Update on Federal Funding California High-Speed Rail Authority In Partnership with: Kadesh.
The Kern Regional Transportation Plan A Vision and Guidebook for Kern County in 2025.
Proposed Interim Guidance – Small Starts. 2 Purpose Before Final Rule, evaluate and rate projects to: Advance projects into project development Provide.
Office of Major Project Development (OMPD) Overview November 2015.
RTD FasTracks Projects for the DRCOG 2040 RTP (Baseline Report) FasTracks Monitoring Committee July 8, 2014.
Road Investment Decision Framework
TRANSIT SYSTEMS PLANNING Module 3, Lesson 4. Learning Objectives Define systems planning Understand the steps required for plan selection and the key.
Southeast Rail Extension FasTracks Monitoring Committee July 14, 2015.
A Presentation to: River to Sea TPO Board October 26, 2016.
2016 POP Investment Strategy: Funding Options
A Presentation to: River to Sea TPO BPAC November 9, 2016.
River to Sea TPO - CAC/TCC
Future Construction FasTracks Corridors Federal Funding Analysis
Southwest LRT Project Craig Lamothe, AICP Senior Project Manager
Transit Systems Planning
Presentation transcript:

New Starts/Small Starts Program APTA Legislative Conference Washington, DC March 12, 2008

2 Topics Overview of the Program New Starts Project Planning & Development New Starts Evaluation and Funding Small Starts Interim Guidance Outreach

3 Characteristics of a New Starts Project New fixed guideway systems and extensions proposed for funding from New Starts program New Starts funding sought is > $75M and/or costs ≥ $250m Fixed guideway is either: –rail OR –a separate right-of-way for the use of public transportation or high occupancy vehicles OR –a catenary and right-of-way usable by other forms of transportation

4 New Starts/Small Starts Funding: Supply and Demand Demand: –18 New Starts projects in PE and Final Design –16 Small Starts projects in PD –Total cost of pipeline: >$22.6 billion, $10.3 billion in New Starts funding –FTA tracking >100 planning studies considering major transit capital investments Supply: $1.6+ billion annually

5 Historical Highlights of Legislative Requirements for Funding Alternative analysis Cost effectiveness Local financial commitment Land use Economic development (recent)

6 FTA New Starts Program Goal Fund meritorious projects Develop reliable information on project benefits and costs Ensure projects treated equitably nationally Facilitate communication between FTA, transit industry and Congress

7 How FTA Meets Its Goals Sound and rigorous management of the program Promote - and assist in - the development of reliable information on costs and benefits Transparent evaluation process Local decisions, project ratings, and funding recommendations are based on the best information available to both the public and decision-makers

8 FTA Senate Authorizing Majority/Minority Senate Appropriations Majority/Minority House Authorizing Majority/Minority House Appropriations Majority/Minority Office of the Secretary OMB White House The New Starts Environment Individual Senate and House Members 150Projects 15 FFGAs, 34 FD/PE/PD, 100 AA Inspector General Govt Accountability Office Press

New Starts Planning and Project Development

10 New Starts Project Development Process Project Development: Typically 6-12 Years Alternatives Analysis 1-2 years Preliminary Engineering 2-3 years 3-7 years Operation FTA Approval Required for Full Funding Grant Agreement (FFGA) ~ 100 AA Studies 12 PE Projects 6 FD Projects FTA Approval Required 15 FFGA Projects ConstructionFinal Design

11 Key Decisions for Each Phase of Project Development Systems planning: priority corridor Alternatives analysis: mode and alignment Preliminary engineering: final scope/cost, completion of NEPA, financial plan Final design: construction documents Full Funding Grant Agreement –FTA: funding –Project sponsor: delivery of the project

12 Planning and Project Development Alternatives Analysis Preliminary Engineering Select LPA FTA Approval to Start PE FTA Approval to Start Final Design System Planning Decisions Mode, general alignment Financial plan Decisions Needs Policies Priority corridor(s) Decisions Refinements to LPA Final scope and cost Complete NEPA Implement financial plan

13 History of Alternatives Analysis 1970s Initial UMTA Policy Statements 1980s Rating system and technical guidance created AA became statutory requirement FTA staff closely involved in AAs FTA had grasp of issues at decision-points 1990s Major Investment Study (MIS) era FTA had little involvement in or awareness of AA studies FTA focused on projects in PE and Final Design 2000s FTA, Congress focus on funding best projects Emphasis is on settling planning questions before PE FTA involvement in AA renewed

14 Alternatives Analysis: Guiding Principles Local process, local decisions Early and ongoing participation by a wide range of stakeholders Sufficient level of analysis is necessary to select a mode and general alignment Documentation and presentation of key study components Development of alternatives that isolate the costs and benefits of capital investment in guideways

15 Alternatives Analysis: Key Elements Identification of corridor problems, project “purpose and need,” and goals and objectives Development of a range of alternatives that address causes of transportation problems Analysis of costs, benefits, and impacts of alternatives Refinement of Alternatives Evaluation of alternatives

16 Requirements for FTA Approval into Preliminary Engineering Completed alternatives analysis No outstanding planning issues remain Locally preferred alternative adopted into fiscally constrained long range plan Projected New Starts evaluation measures confirmed “Medium” or higher rating for project –at least medium rating for both project justification and local financial commitment Sponsor demonstration of technical capacity

17 FTA Suggestions to Expedite PE Approval Process Involve FTA in the alternatives analysis study early on Permit FTA to review AA study products Develop a defensible TSM alternative (and get FTA concurrence) as part of the study; don’t wait until the end to seek approval for what will become New Starts baseline alternative Inform FTA of intent to request entry into PE well in advance of formal request Do not submit formal request until all readiness thresholds and FTA approvals/findings have been met Assuming all of the above have been met, FTA can efficiently process PE request at any time of year

18 Useful FTA Reviews during AA Scope of work Initiation package Technical framework Technical results Final report (AA report or AA/DEIS)

19 SAFETEA-LU Highlights for Alternatives Analyses Before and After Study –Required for both New Starts and Small Starts project – compares cost and ridership forecasts with actual numbers 2 years after revenue operations begins Before and After Study Report –Required annually to Congress documenting results of B&A studies Contractor Performance Assessment Report –Required annually to Congress citing contractor forecasts Incentives awards –Allows more federal funding if actual ridership is at least 90% and cost no more than 110% of forecasts made during alternatives analysis

20 Preliminary Engineering What It Is  Work necessary to develop a firm scope and cost estimate with appropriate contingencies:  Finalize station locations and configuration  Yard and shop location  Alignment  Park and ride size and configuration  Number of vehicles and peak capacity needs  Work necessary to complete the environmental requirements  Work necessary to firm up funding commitments

21 Preliminary Engineering What It Is NOT  Just engineering  Work necessary to complete 30% of design  Work necessary to develop a preliminary cost estimate that likely will increase during final design as project is better defined  An indication of likely New Starts funding

22 Responsibilities of Project Management Oversight Contractors (PMOCs)  Serve as extension of FTA staff: - project management - construction management - project sponsor technical capacity  Monitor project progress: - schedule and budget - conformance with design criteria - construction to approved specifications  Provide technical guidance to grantee

23 Requirements for FTA Approval into Final Design Completed NEPA process (ROD or FONSI) Approved Project Management Plan (PMP) Approved Rail and Bus Fleet Management Plan Address Railroad Right-of-Way (ROW) Issues Establish Process for Real Estate and ROW Acquisition “Medium” or Higher Project Rating –At least Medium rating for both Project Justification and Finance (including commitment of 50% of non-5309 funds)

24 What is a Full Funding Grant Agreement (FFGA) ? Formal Agreement signed by FTA and Grantee following detailed review by DOT, OMB and Congress Agreement on Project Scope, Budget, and Schedule Terms and Conditions of Federal Participation Multi-year Funding Commitment (subject to Congressional Appropriations) Caps Federal Section 5309 New Starts funds

25 Full Funding Grant Agreement To receive an FFGA a project must: –Be Authorized in Law –Complete the Planning, Project Development, and NEPA Processes –Meet Project Readiness Requirements (techinical capacity, firm and final cost estimate and funding) –Receive a “Medium” or higher overall rating –Receive a “Medium” or higher cost effectiveness rating –Meet all other Federal Requirements

26 Significance of FFGA  Historically, 85% of New Starts Funds Appropriated for FFGAs and Projects with “Medium” or Higher Ratings  All Projects Eventually Receive 100% of Total New Starts Funding in FFGA  Majority of Projects Receive New Starts Funding according to Annual Schedule in FFGA  Practical Limits on Total New Starts Funding and Annual Schedule for Individual Projects

27 Practical Limits for 5309 New Starts Funds Consider other projects in the region and their request for New Starts funds Assume no more than 50 percent in New Starts funding Historical maximum New Starts funds per project: $700M total, $100M per year (NYC region is exception)

New Starts Evaluation and Funding

29 Documents Related to SAFETEA-LU Requirements FTA must publish policy guidance for the New/Small Starts review and evaluation process and criteria each time significant changes are made, and not less than every two years –Guidance issued in Spring of 2006 and 2007, and planned for 2008 FTA must prepare new regulation for New and Small Starts –NPRM issued August 3, 2007 –Current appropriation bill prohibits issuance of final rule

30 New Starts Evaluation and Oversight Among most rigorous in government Increasingly credible and important to Congress and local communities Program Management Oversight recommended by GAO and OIG

31 New Starts Rating Criteria Mobility improvements Environmental benefits Operating efficiencies Cost effectiveness* Land Use* Economic Development* Reliability of costs and ridership forecasts* Local financial commitment* Other factors* * = Also Small Starts Criteria

32 FTA’s New Starts Evaluation and Rating Framework Summary Rating Project Justification Rating Financial Rating Non-Section 5309 Share Capital Finances Operating Finances Other Factors Low Income Households User Benefits Mobility Improvements Environmental Benefits Operating Efficiencies Cost Effectiveness Land Use Minimum Project Development Requirements: Employment Capital Cost O&M Cost User Benefits Metropolitan Planning and Programming Requirements Project Management Technical Capability Other Considerations NEPA Approvals

33 Project Justification When the average of the cost effectiveness and land use rating falls equally between two ratings, the mobility improvements rating is introduced as a “tiebreaker.” Locally-generated and reported information in support of the operating efficiencies and environmental benefits criteria does not distinguish in any meaningful way differences between competing major transit capital investments “Other factors” may increase or decrease a summary project justification rating by no more than one step Project Justification Rating Other Factors Mobility Improvements Environmental Benefits Operating Efficiencies Cost Effectiveness (50%) Land Use (50%)

34 Cost Effectiveness Dollars per hour of “user benefits” = Benefits and costs computed in relation to a “Baseline Alternative” annualized capital cost + annual O&M cost user benefits Cost Effectiveness Capital Cost O&M Cost User Benefits

35 Cost Effectiveness Used instead of cost/benefit due to the difficulties in monetizing all transit benefits Effectiveness measure represents either most of the benefits of projects or is highly correlated to other benefits Allows a meaningful comparison of projects nationally of different modes with significant differences in costs and benefits

36 Cost Effectiveness Source of Transportation Benefits Highway users: benefits from less congestion due to travelers changing from driving to riding on the project Current transit users: benefits from faster travel times using project compared to their previous transit mode New transit users: benefits from faster travel times using project

37 Cost Effectiveness Highway Users: not determined because of serious travel model difficulties in quantifying degree of congestion relief Transit users: benefits from faster travel times for New Starts project for all travelers in the region –In-vehicle time –Walk and wait time –Number of transfers –Capacity constraints –Reliability, comfort, security, branding

38 Cost-Effectiveness Current Rating Values (will be updated June 2008 using GDP index): –Low >$30 per hour –Medium-low $24 - $29.99 per hour –Medium$ $23.99 per hour –Medium-high$12 - $15.49 per hour –High < $11.99 per hour

39 What’s a Baseline Alternative? Low capital cost relative to fixed guideway Includes service frequencies, coverage, park-n- ride lots comparable to the build alternative “Best you can do to improve transit without building a new guideway”

40 Why Use a Baseline Alternative? Illuminates project’s benefits and costs Allows for identification of the additional project benefits due to significantly larger additional capital costs Addresses concerns of critics that lower cost options are just as effective Ensures consistent evaluations nationally Enables FTA to fairly assess project benefits in areas with good current transit service and areas with poor service

41 Land Use Based on strength of: –Transit supportive existing land use –Transit supportive plans and policies –Demonstrated local performance of transit supportive policies Land Use

42 Local Financial Commitment Based on: –Current capital and operating financing condition –Commitment of capital and operating funds –Cost estimates/planning assumptions/capacity Local Financial Commitment Rating Non-Section 5309 Share (20%) Capital Finances (50%) Operating Finances (30%)

43 Financial Ratings In Project Development PE Approval – Reasonable financial plan; Funding sources identified; Good non-federal funding history FD Approval – At least 50 percent of non New Starts funding committed; Firm cost estimates; Ability to address funding shortfalls FFGA – 100% non-New Starts funding committed; Funding shortfalls covered

44 Summary Ratings Rating categories: –High –Medium-high –Medium –Medium-low –Low Decision Rule: –Must have at least “Medium” on both justification and finance to receive “Medium” overall Summary Rating Project Justification Rating (50%) Local Financial Commitment Rating (50%)

45 Project Ratings and Decisionmaking Ratings guide FTA approvals of PE, Final Design, and FFGAs “Medium” or better overall rating required to advance Once in PE, rating reported each year in Annual Report on Funding Recommendations

Small Starts Interim Guidance and New Starts/Small Starts Rulemaking

47 Key SAFETEA-LU Small Starts Provisions Separate Funding Category beginning FY 07 ($200 million authorized annually) Rulemaking Required

48 Small Starts Eligibility - Costs Total cost ≤ $250 million and New Starts share ≤ $75 million Exempt projects (≤ $25 million New Starts share) may: –Remain exempt until Final Rule – then be evaluated and rated –Be evaluated and rated now

49 Small Starts Eligibility – Project Definition Fixed guideways, or Corridor bus project including at least: –Substantial transit stations –Traffic signal priority or pre-emption –Low floor buses or level boarding –Branding of the proposed service –10 min peak/15 min off-peak headways or better while operating at least 14 hours a day

50 Very Small Starts - Eligibility Simple, low-cost projects that qualify for streamlined process Very Small Starts eligibility criteria: –Existing daily riders over 3,000/weekday –Total cost under $50 million –Under $3 million per mile, excluding rolling stock

51 Alternatives Analysis - Small Starts Refer to existing alternatives analysis guidance for New Starts Narrower range of alternatives Potentially less complex analytical methods

52 Alternatives Analysis - Very Small Starts Identification of corridor problems or opportunities Definition of the project Analysis of costs, benefits, and impacts of the project compared to existing conditions Determination of financial viability Explanation of choice of preferred alternative Implementation Plan

53 Evaluation of Small Starts Use Existing New Starts Criteria for Small Starts –Project Justification -Land-use -Cost-effectiveness -Other factors, including economic development, congestion and pricing strategies –Local Financial Commitment

54 Evaluation of Small or Very Small Starts – Project Justification Small Starts: –Land Use (simplified reporting) –Cost effectiveness based on opening year rather than forecast year -Same cost-effectiveness breakpoints as applied to New Starts projects (hence, opening year estimate of user benefits increased by 50 percent to reflect 20 year forecast) –Other Factors (including economic development) Very Small Starts: –Project automatically warranted as cost-effective with transit supportive land use appropriate to the proposed level of investment –Medium rating assigned

55 Evaluation of Small or Very Small Starts – Local Financial Commitment Small or Very Small Starts projects receive “medium” for local financial commitment if: –Reasonable plan to secure local share (all non-New Starts funding committed for PCGA) –Project O&M under 5 percent of agency operating budget –Agency in solid financial condition Projects that cannot meet the conditions above submit a financial plan –According to FTA guidance –Covering period up to and including opening year –Evaluated based on criteria used for New Starts

Planned Outreach Activities

57 Workshops and Training Courses April 22, Small Starts Workshop, Pittsburgh April 23-24, New/Small Starts Roundtable (by invitation), Pittsburgh April 29– May 1, Alternative Analysis Course, New York May 12, Small Starts Workshop, Phoenix May 13-14, New/Small Starts Roundtable (by invitation), Phoenix June 5, New/Small Starts Workshop at APTA Rail Conf, San Francisco July 22-24, Alternatives Analysis Course, Seattle September, Travel Forecasting Workshop for New and Small Starts, San Francisco November, Travel Forecasting Workshop for New and Small Starts, DC